1038
|
Thursday, December 05, 2024, 15:38 |
Dave Neilson | | LP-FEBIAD | | | 44692-4 | 42972-10 | | FEBIAD development | Tuesday, December 02, 2024, 15:35
- Target loaded into the test stand
Thursday, December 03, 2024, 14:33 |
|
1039
|
Friday, December 06, 2024, 16:03 |
Isaiah Rabuka | | | | | | | | | Friday, December
06, 2024, 16:03 Heated and cooled a sample |
|
1040
|
Tuesday, December 10, 2024, 14:38 |
Isaiah Rabuka | | | | | | | | | Tuesday,
December 10, 2024, 14:38 Depressurized ATTS |
|
1043
|
Friday, December 20, 2024, 09:37 |
Dave Neilson | | | | | | | | Winter holiday shutdown | Friday, December 20, 2024, 09:37
turned off all 4 turbopumps. winding
down prior to evacuating. |
|
1045
|
Thursday, January 23, 2025, 17:12 |
Dave Neilson | | | | | | | | CATHODE ANODE current leak testing | Recent tests have shown that CATHODE voltage
breaks down at ~130V, continually leaking
current and progressively dropping voltage, |
|
1048
|
Thursday, April 17, 2025, 16:11 |
Dave Neilson | C#5 | | | | | 45235 - 5 | | LPSIS C#5 conditioning | Thursday, April 17, 2025, 15:46 target
installed. now roughing
Thursday, April 17, 2025, 17:12 Turbo |
|
|