Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 53 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  1038   Thursday, December 05, 2024, 15:38 Dave Neilson LP-FEBIAD  44692-442972-10 FEBIAD developmentTuesday, December 02, 2024, 15:35 
  - Target loaded into the test stand
Thursday, December 03, 2024, 14:33
  
  1039   Friday, December 06, 2024, 16:03 Isaiah Rabuka          Friday, December
06, 2024, 16:03 Heated and cooled a sample
  
  1040   Tuesday, December 10, 2024, 14:38 Isaiah Rabuka          Tuesday,
December 10, 2024, 14:38 Depressurized ATTS
  
  1043   Friday, December 20, 2024, 09:37 Dave Neilson       Winter holiday shutdownFriday, December 20, 2024, 09:37 
  turned off all 4 turbopumps. winding
down prior to evacuating.
  
  1045   Thursday, January 23, 2025, 17:12 Dave Neilson       CATHODE ANODE current leak testingRecent tests have shown that CATHODE voltage
breaks down at ~130V, continually leaking
current and progressively dropping voltage,
  
  1048   Thursday, April 17, 2025, 16:11 Dave NeilsonC#5    45235 - 5 LPSIS C#5 conditioningThursday, April 17, 2025, 15:46  target
installed. now roughing
Thursday, April 17, 2025, 17:12 Turbo
  
ELOG V2.9.2-2455