ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  1040   Tuesday, December 10, 2024, 14:38 Isaiah Rabuka          Tuesday,
December 10, 2024, 14:38 Depressurized ATTS
  
  1041   Tuesday, December 17, 2024, 09:46 Dave Neilson     45235-26In progressSIS P2N source cup testingMonday, December 16, 2024, 3:34   Target
loaded in test stand. Confirmed correct connection
to mass marker power supply through multipin.
  
  1042   Tuesday, December 17, 2024, 16:09 Dave Neilson      DoneAnode,TGHT, TBHT power supply investigation. Resolved Note, ground and HVC (high voltage
common) are used interchangeably here.
 
  
  1043   Friday, December 20, 2024, 09:37 Dave Neilson       Winter holiday shutdownFriday, December 20, 2024, 09:37 
  turned off all 4 turbopumps. winding
down prior to evacuating.
  
  1045   Thursday, January 23, 2025, 17:12 Dave Neilson       CATHODE ANODE current leak testingRecent tests have shown that CATHODE voltage
breaks down at ~130V, continually leaking
current and progressively dropping voltage,
  
  1048   Thursday, April 17, 2025, 16:11 Dave NeilsonC#5    45235 - 5 LPSIS C#5 conditioningThursday, April 17, 2025, 15:46  target
installed. now roughing
Thursday, April 17, 2025, 17:12 Turbo
  