1023
|
Thursday, October 03, 2024, 16:26 |
Aaron Schmidt | Ta#68 | HP-SIS | ITE | TM2 | 45447-26 | 45235-16 * | | Conditioning Ta#68 | HS note:
Base# 45235-16
Lid# 39956-8
Thursday, October 03, 2024, 16:04: Roughing. IG6? Error?
Thursday, October 03, 2024, 16:24: BV1A open.
Thursday, October 03, 2024, 16:32: TP1B on
Thursday, October 03, 2024, 16:43: TP1A on.
Thursday, October 03, 2024, 16:51: IG1 on.
Thursday, October 03, 2024, 20:01: Water cooling on. No effect to vacuum. TGHT TBHT ramping at 1A/30s to 580A/230A
Friday, October 04, 2024, 09:13 : Slowly increasing BIAS/EE/EZL to 30/2.5/13 kV.
Friday, October 04, 2024, 09:30: problem with TMSIG6 (low pressure sensor in beam line). Forced on for interlocks temporarily.
Friday, October 04, 2024, 11:14 mass scanned - FC6 background working. filename = 2024-10-04--11-11 HP-Ta-24D - scan 3.txt
Friday, October 04, 2024, 11:14 repeating mass scan. filename = 2024-10-04--11-40 HP-Ta-24D - scan 4.txt
Friday, October 04, 2024, 11:53 increasing to bias 50kV / ezl 33kV.
Friday, October 04, 2024, 12:34: BIAS/EZL at 50/33 kV. Leaving for HV conditioning.
Friday, October 04, 2024, 12:43 one spark from HV BIAS to ground caused TGHT to trip. Current was restored within 10s.
Friday, October 04, 2024, 15:31: decreasing BIAS/EZL to 30/13kV. Throughout time at high voltage, there were 3 sparks. Two were within 5 minutes of each other, and the last 2 hours proceeded without incident (no sparks)
Friday, October 04, 2024, 15:47 BIAS EZL at 30/13 kV. running final mass scan. background FC6 appears not to be working again. but then restored. scan file name = 2024-10-04--16-30 HP-Ta-24D - scan 5.txt
Friday, October 04, 2024, 16:22 decreasing biases to 0V
Friday, October 04, 2024, 16:23 ramping TGHT TBHT to 0/0A at -1A/30s
Monday, October 07, 2024, 07:58: IV4 closed. IG1 off. TP off.
Monday, October 07, 2024, 08:43: PS off. Waterlines purged. Venting.
|
|
1024
|
Monday, October 07, 2024, 09:54 |
Aaron Schmidt | | | | | | | | Pump down empty chamber / IG6 fix | Monday, October 07, 2024, 09:54: Roughing. U-Line installed on HS waterline.
Monday, October 07, 2024, 10:34: Vent Chamber. TP6 & TP2 off. |
|
1026
|
Tuesday, October 29, 2024, 18:25 |
Aaron Schmidt | UC#46 (assembly only) | LP-IG-LIS | ITW | TM4 | | 42972-6 / 39956-1 | In progress | Conditioning UC#46 Assembly | 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20: Roughing.
Tuesday, October 29, 2024, 18:52: TP1B on.
Tuesday, October 29, 2024, 18:58: TP1A on.
Tuesday, October 29, 2024, 19:06: IG1 on.
Wednesday, October 30, 2024, 07:23: Vacuum @ 8.25e-07T. Waterline FS#5 open.
Wednesday, October 30, 2024, 07:25: Power on.
Wednesday, October 30, 2024, 07:32: PS for TGHT keeps timing out? Goes red. Won't start.
Tapped up TBHT to 10 A. TGHT?
Wednesday, October 30, 2024, 08:20: Manually cycled the PS. No longer trips.
Tapped up TGHT to 5 A. OK
Wednesday, October 30, 2024, 08:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Wednesday, October 30, 2024, 14:32: Auto-cooling @ 2 A per min.
Thursday, October 31, 2024, 08:30: TP/ IG1 off.
Thursday, October 31, 2024, 12:52: Venting. |
|
1027
|
Thursday, October 31, 2024, 13:53 |
Aaron Schmidt | | | | | | | In progress | Chamber empty & Fix IG6 | Thursday, October 31, 2024, 13:53: Roughing down empty chamber. U-Line installed.
Monday, November 04, 2024, 11:40: Vent beamline.
Monday, November 04, 2024, 13:40: 1/2 operating filament spare provided & installed. Roughing beamline section.
Monday, November 04, 2024, 13:51: TMS:TP2 on.
Monday, November 04, 2024, 13:57: TMS:TP6 on. TMS:IG6 on.
Tuesday, November 05, 2024, 15:00: Venting Chamber
Tuesday, November 05, 2024, 15:19: IG6 still displaying issues. Contacted Edi,
Tuesday, November 05, 2024, 15:35: Controller replaced. Switch to Filament 2. IG6 on. Reading 3.73e-07T.
Wednesday, November 13, 2024, 09:16: IG6 is tripped again.
Wednesday, November 13, 2024, 09:17: Reset & switched back to Filament 2. There is no filament 1. Reading 3.91e-07T. |
|
1029
|
Wednesday, November 13, 2024, 14:36 |
Aaron Schmidt | UC#(47) - Not included | LP-SIS | ITE | TM3 | 44691-8 | 45235-24 | In progress | Conditioning UC#47 (Assembly only) | Gas line is attached.
Wednesday, November 13, 2024, 14:18: Roughing.
Wednesday, November 13, 2024, 18:20: Closed backing valves. Vacuum @ 2.140 T?
Thursday, November 14, 2024, 06:23: Venting manually.
Thursday, November 14, 2024, 06:50: Left line slightly un-seated. Swapped out waterline gaskets. Close. Roughing.
Thursday, November 14, 2024, 07:22: TP1B on.
Thursday, November 14, 2024, 07:33: Backing pressure below 0.100T. TP1A on.
Thursday, November 14, 2024, 07:43: TP1A Tripped. Backing pressure @ 0.067T.
Thursday, November 14, 2024, 07:47: TP1B off to bring backing pressure below 0.050T.
Thursday, November 14, 2024, 07:56: Re-opened & Restarted TP1B
Thursday, November 14, 2024, 08:38: Re-closed. Will have to allow TP to spin down before opening the vent valve to give the interlock a reset. (We should remove that or have a bypass in the future)
Thursday, November 14, 2024, 08:46: Coordinated opening BV1A & BV1B simultaneously from 2 computers to bypass the interlock. Success. TP1B. On & green. TP1A started.
Thursday, November 14, 2024, 08:52: TP1A at speed (Green) Teamwork makes the dream work!!! IG1 on.
Thursday, November 14, 2024, 13:41: Vacuum @ 1.10e-06T. Waterline FS#5 open. Vacuum ok.
Thursday, November 14, 2024, 13:43: Power / Sources on.
Thursday, November 14, 2024, 13:46: Checks. TGHT / TBHT to 5/5A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. OK. Tap back down. Allow vacuum to drop further. Ready for operation.
Thursday, November 14, 2024, 13:48: Open IV4. Timed out. Tighten sensor. Reset. Open IV4.
Friday, November 15, 2024, 05:25: Vacuum @ 4.23e-07T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Friday, November 15, 2024, 09:01: Vacuum @ 6.01e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Friday, November 15, 2024, 11:46: Optics on.
Friday, November 15, 2024, 11:54: TGHT tripped completely off & was unable to restart while turning up the HV. Was at 580 A. BIAS / EE / EZL was tapped up to near 27.5 / -1.5 / 13 kV.
Friday, November 15, 2024, 12:05: Verified nothing appears to have burnt up or similar. Unable to begin auto-cooling on TBHT as it requires both heater PS to operate. Will tap down TBHT manually. TGHT is set @ 0A.
Friday, November 15, 2024, 12:11: TBHT tapped down to 0A.
Friday, November 15, 2024, 12:14: Once at 0 A, the TGHT PS status turned from red to black??? Was able to reset & turn it back on. Brought it up to 5 A. That's different.
Friday, November 15, 2024, 12:23: Sources PS off. Will re-ramp on Monday.
Monday, November 18, 2024, 07:24: Vacuum @ 2.43e-07T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.
Monday, November 18, 2024, 09:17: Vacuum @ 2.69e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, November 18, 2024, 13:02: Sources / Optics On.
Monday, November 18, 2024, 13:08: BIAS / EE / EZL to 20 / -1.5 / 13 kV.
Monday, November 18, 2024, 13:10: BIAS / EE / EZL to 27 / -1.5 / 13 kV.
Monday, November 18, 2024, 13:20: TGHT Shut off again during a mass scan!
Monday, November 18, 2024, 13:22: Restarted TGHT. This is problematic. TGHT @ 580A.
Monday, November 18, 2024, 13:25: Redo mass scan.
Monday, November 18, 2024, 13:59: Mass / wire scans complete. HV to 0 kV.
Monday, November 18, 2024, 14:00: Auto-cooling @ 2 A per min.
Tuesday, November 19, 2024, 10:04: IV4 closed
Tuesday, November 19, 2024, 10:06: Sources off.
Tuesday, November 19, 2024, 10:07: IG1 & TP off.
Tuesday, November 19, 2024, 11:16: Power off / lockout. FS#5 purged. Venting. |
Attachment 1: UC#47_empty_conditioning_test_1_-_Failed.docx
|
Attachment 2: UC#47_empty_conditioning_test_2.docx
|
|
1030
|
Tuesday, November 19, 2024, 14:25 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Tuesday, November 19, 2024, 14:25: Roughing |
|
1036
|
Thursday, December 05, 2024, 11:08 |
Aaron Schmidt | | | | | | | Problems/Solutions | Swap RP1 & Inspection (ITS Pumps) | Thursday, December 05, 2024, 11:04: RP1 was struggling to pump down. RP SN: MY20055A02 removed. Tip seal replacement likely req'd.
Swapped with a new roughing pump SN: MY2340SA06 (Voltage set to 115V. Shipping locks loosened prior to install)
Ballast filter installed.
Thursday, December 05, 2024, 11:05: Roughing.
Thursday, December 05, 2024, 11:10: Vacuum pressure dropping optimally. Down below 1T already
Thursday, December 05, 2024, 11:47: TP & other RP ok. Note TP1A is getting louder on startup. Will likely need a change out in Q1 - 2025.
Additional source tray inspection:
Monday, December 16, 2024, 15:30: OK
Images attached. |