Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 53 of 53  Not logged in ELOG logo
Entry  Tuesday, December 10, 2024, 14:38, Isaiah Rabuka, , , , , , , ,  
  Tuesday, December 10, 2024, 14:38 Depressurized ATTS using argon, switched
out samples, and repressurized ATTS. Heated new sample to 1000 degrees Celsius.
 
Entry  Tuesday, December 17, 2024, 09:46, Dave Neilson, , , , , , 45235-26, In progress, SIS P2N source cup testing 
Monday, December 16, 2024, 3:34   Target loaded in test stand. Confirmed correct connection to mass marker power supply through multipin. Bottom
left pin (5 PS - ) connected to grounded side of the filament, top right pin (2, PS +) connected to top end of filament.
 
Entry  Tuesday, December 17, 2024, 16:09, Dave Neilson, , , , , , , Done, Anode,TGHT, TBHT power supply investigation. Resolved 
 Note, ground and HVC (high voltage common) are used interchangeably here.
 
 
Entry  Friday, December 20, 2024, 09:37, Dave Neilson, , , , , , , , Winter holiday shutdown 
Friday, December 20, 2024, 09:37    turned off all 4 turbopumps. winding down prior to evacuating.
Friday, December 20, 2024, 11:43 Purged and closed all water cooling lines.
Friday, December 20, 2024, 15:54   removed target and installed Uline.
Entry  Thursday, January 23, 2025, 17:12, Dave Neilson, , , , , , , , CATHODE ANODE current leak testing 
Recent tests have shown that CATHODE voltage breaks down at ~130V, continually leaking current and progressively dropping voltage, making febiad CATHODE
testing impossible.
 
Entry  Thursday, April 17, 2025, 16:11, Dave Neilson, C#5, , , , , 45235 - 5, , LPSIS C#5 conditioning 
Thursday, April 17, 2025, 15:46  target installed. now roughing
Thursday, April 17, 2025, 17:12 Turbo pumps on.
ELOG V2.9.2-2455