  637   Monday, February 19, 2018, 14:01 Carla Babcock       Attempts to get to higher voltages, summarized.The test stand holds up to 63kV, however
at voltages over 54kV there are small discharges,
rising to a continuous level around 60kV.
  
  306   Tuesday, May 28, 2013, 09:51 Anders Mjos      Problems/SolutionsArchivers restartedCOIL and ANODE data added to ISACT Data
Archiver
  
  696   Thursday, November 08, 2018, 14:13 Aaron Schmidt       Ar & Ne gas bottle replacement.Thursday, November 08, 2018, 14:05: Fresh
/ recently calibrated Neon & Argon bottles
installed.
 GasLeak_Datasheet.pdf 
  1042   Tuesday, December 17, 2024, 16:09 Dave Neilson      DoneAnode,TGHT, TBHT power supply investigation. Resolved Note, ground and HVC (high voltage
common) are used interchangeably here.
 
  
  252   Tuesday, December 18, 2012, 12:51 Sebastian Raeder       Anode powersupply connected to HV-commonThe anode PS is turned off and connected
to HV common.
the Target is connected to a -18V
  
  700   Wednesday, December 12, 2018, 13:22 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressAnode leak current check.Wednesday, December 12, 2018, 13:15: Power
/ Sources on.
Wednesday, December 12, 2018, 13:20:
  
  701   Monday, December 17, 2018, 12:03 Aaron Schmidt LP-FEBIAD  395530-342752-5 Anode leak current check.Monday, December 17, 2018, 12:01: Connected
Multimeter through feedthroughs J & L.
Blue wire removed.
  
  689   Monday, October 15, 2018, 14:38 Aaron Schmidt      Problems/SolutionsAnode / Cathode PS to NegativeMonday, October 15, 2018, 13:00-14:00 Anode
/ Cathode BIAS PS polarity reversed by John
Chow.
  
  145   Thursday, July 12, 2012, 13:49 Anders Mjos      Problems/SolutionsAluminum oxide found inside TSHSV1Aluminum oxide found inside TSHSV1 and
the copper line to TSHUHV1.
SV1 replaced and copper line cleaned.
  
  757   Monday, September 16, 2019, 10:05 Fernando Maldonado      Problems/SolutionsAlignment pin reinstalled Monday, September 16, 2019, 10:03:
The rightmost alignment pin has been reinstalled
(see picture attached). It was previously
 20190916_095937.jpg 
  149   Wednesday, July 18, 2012, 14:08 Anders Mjos      Problems/SolutionsAir supply leak on manifold fixed

    

       
            
  
  945   Tuesday, November 15, 2022, 15:32 Sam Gupta       ATTS tantalum Bracket Heating testHeated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature
  
  504   Friday, April 15, 2016, 16:07 Anders Mjos      Problems/SolutionsANODE polarity switched to positiveto test the effect of extraction when biasing
of the target.
  
  505   Wednesday, April 20, 2016, 08:27 Anders Mjos      Problems/SolutionsANODE polarity switched to negative

    

       
            
  
  768   Thursday, October 31, 2019, 13:22 Fernando Maldonado      Problems/Solutions9pin connector not fully in contact with baseplateThursday, October 31, 2019, 13:20: After
inspecting the interior, the 9 pin bracket
was found not making full contact with the 
 20191031_130003.jpg20191031_130028.jpg 
  10   Friday, September 23, 2011, 16:40 Anders Mjos      Problems/Solutions9-pin connectors swapped on source trayFriday, September 23, 2011, 16:3: The connection
on the 9-pin connector for FEBIAD targets
showed burn marks from the previous FEBIAD
  
  12   Monday, September 26, 2011, 14:56 John Wong      Problems/Solutions9-pin connectors swapped on source tray

    

       
            
 9-pin-connector.jpg 
  238   Friday, November 30, 2012, 12:04 Anders Mjos      In progress9-pin connector installation work in progressin preparation for RFQ testing. By Sebastian
and Anders
An insulated  9-pin D-sub connector
  
  755   Thursday, August 15, 2019, 16:33 Fernando Maldonado      Problems/Solutions9-pin connection modificationThursday, August 15, 2019, 16:17: Q FT
undone to remove the connection to the 9-pin
The idea is to change the cables
  
  721   Tuesday, May 07, 2019, 13:16 Aaron SchmidtTa#58LP-SISITETM243044-4 In progress9-pin connection configuration (Using Ta#58)Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin
 HV_Tests_2019_-_AL_-_1.docxTS-2019-05-08-08-12.rgaTS-2019-05-08-14-20.rga 