1021
|
Tuesday, September 10, 2024, 16:24 |
Dave Neilson | TiC #24D | HP-SIS | ITW | TM3 | 45447-27 | 45235-25 | | Back up target testing and conditioning | Tuesday, September 10, 2024, 16:21:
Target installed in test stand by Brady
Tuesday, September 10, 2024, 16:21: |
|
|
657
|
Friday, April 20, 2018, 13:20 |
Carla Babcock | | | | | | | Done | BIAS* fan sounds like it is dying | The fan in the EZL power supply is making
a terrible noise - keep an eye on it, it
sounds like it might give up soon. |
|
|
629
|
Wednesday, February 07, 2018, 08:46 |
Aaron Schmidt | | | | | | | | BIAS Power supply installation | Wednesday, February 07, 2018, 08:40: A
75 kV Glassman power supply was installed
in the rack for use in further HV testing. |
  |
|
715
|
Wednesday, March 27, 2019, 11:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | BIAS PS replaced. Test | Wednesday, March 27, 2019, 10:25: BIAS
@ 1 kV
952V - 548uA on controls readback |
|
|
637
|
Monday, February 19, 2018, 14:01 |
Carla Babcock | | | | | | | | Attempts to get to higher voltages, summarized. | The test stand holds up to 63kV, however
at voltages over 54kV there are small discharges,
rising to a continuous level around 60kV. |
|
|
306
|
Tuesday, May 28, 2013, 09:51 |
Anders Mjos | | | | | | | Problems/Solutions | Archivers restarted | COIL and ANODE data added to ISACT Data
Archiver |
|
|
696
|
Thursday, November 08, 2018, 14:13 |
Aaron Schmidt | | | | | | | | Ar & Ne gas bottle replacement. | Thursday, November 08, 2018, 14:05: Fresh
/ recently calibrated Neon & Argon bottles
installed. |
|
|
1042
|
Tuesday, December 17, 2024, 16:09 |
Dave Neilson | | | | | | | Done | Anode,TGHT, TBHT power supply investigation. Resolved | Note, ground and HVC (high voltage
common) are used interchangeably here.
|
|
|
252
|
Tuesday, December 18, 2012, 12:51 |
Sebastian Raeder | | | | | | | | Anode powersupply connected to HV-common | The anode PS is turned off and connected
to HV common.
the Target is connected to a -18V |
|
|
700
|
Wednesday, December 12, 2018, 13:22 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | Anode leak current check. | Wednesday, December 12, 2018, 13:15: Power
/ Sources on.
Wednesday, December 12, 2018, 13:20: |
|
|
701
|
Monday, December 17, 2018, 12:03 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | | Anode leak current check. | Monday, December 17, 2018, 12:01: Connected
Multimeter through feedthroughs J & L.
Blue wire removed. |
|
|
689
|
Monday, October 15, 2018, 14:38 |
Aaron Schmidt | | | | | | | Problems/Solutions | Anode / Cathode PS to Negative | Monday, October 15, 2018, 13:00-14:00 Anode
/ Cathode BIAS PS polarity reversed by John
Chow. |
|
|
145
|
Thursday, July 12, 2012, 13:49 |
Anders Mjos | | | | | | | Problems/Solutions | Aluminum oxide found inside TSHSV1 | Aluminum oxide found inside TSHSV1 and
the copper line to TSHUHV1.
SV1 replaced and copper line cleaned. |
|
|
757
|
Monday, September 16, 2019, 10:05 |
Fernando Maldonado | | | | | | | Problems/Solutions | Alignment pin reinstalled | Monday, September 16, 2019, 10:03:
The rightmost alignment pin has been reinstalled
(see picture attached). It was previously |
|
|
149
|
Wednesday, July 18, 2012, 14:08 |
Anders Mjos | | | | | | | Problems/Solutions | Air supply leak on manifold fixed |
|
|
|
945
|
Tuesday, November 15, 2022, 15:32 |
Sam Gupta | | | | | | | | ATTS tantalum Bracket Heating test | Heated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature |
|
|
504
|
Friday, April 15, 2016, 16:07 |
Anders Mjos | | | | | | | Problems/Solutions | ANODE polarity switched to positive | to test the effect of extraction when biasing
of the target. |
|
|
505
|
Wednesday, April 20, 2016, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | ANODE polarity switched to negative |
|
|
|
768
|
Thursday, October 31, 2019, 13:22 |
Fernando Maldonado | | | | | | | Problems/Solutions | 9pin connector not fully in contact with baseplate | Thursday, October 31, 2019, 13:20: After
inspecting the interior, the 9 pin bracket
was found not making full contact with the |
 |
|
10
|
Friday, September 23, 2011, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray | Friday, September 23, 2011, 16:3: The connection
on the 9-pin connector for FEBIAD targets
showed burn marks from the previous FEBIAD |
|