  44   Wednesday, February 29, 2012, 17:26 Friedhelm Ames       gas inlet valves closed
  43   Wednesday, February 29, 2012, 17:22 Friedhelm Ames       mass scan

mass scan with valve at 7.2 to let in Al(CH3)3 saved as

plotdump-local-clean.txt_Feb29_12_17-19-20.txt


Attachment 1: grab.BI5978.png
grab.BI5978.png
  42   Wednesday, February 29, 2012, 15:08 Friedhelm Ames       connected Al(CH3)3

connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating valve first response at mass 27 with valve set point at 7.0.

  41   Wednesday, February 29, 2012, 09:43 Friedhelm Ames       checking gas inlet valve for FEBIAD
  40   Tuesday, February 28, 2012, 16:32 Brandon Humphries       Initial settings for FEBIAD on Test Stand

ISAC Test Stand FEBIAD Ion Source and ISACT optics screen grabs before practicing tuning.  Tune saved as: data/febiaddata/tune/120228-1620_0.snap and data/isactdata/tune/120228-1620_0.snap respectively.<br>

Seeing 1.93e-06 on TMS:FC0 and 3.30e-09 on TMS:FC6.

Attachment 1: grab.V13332.png
grab.V13332.png
Attachment 2: grab.m13336.png
grab.m13336.png
  37   Tuesday, February 28, 2012, 11:04 Pierre Bricault        

 Calibrating the gas valve

  36   Tuesday, February 28, 2012, 10:29 Pierre Bricault LP-FEBIAD    In progressTest FEBIAD at ISAC test statnd
  35   Monday, February 27, 2012, 17:39 Friedhelm Ames      In progresstarget and tube heaters ramped up

ramping up target to 300 A and tube to 270 A

  34   Friday, February 17, 2012, 10:27 Aurelia Laxdal      DoneStarted the Archivers

Started both ISACT and SOURCES Archivers.

  33   Thursday, February 16, 2012, 15:59 Anders Mjos      Problems/SolutionsHe and Ne installed and gas lines leak checked

New supply of He and Ne was installed yesterday and gas lines leak checked. The He bottle is currently closed.


UPDATE Monday, June 17, 2013, 15:17

Specifications for the currently installed Ne leak (SN: 11-231) can be found on DocuShare

https://documents.triumf.ca/docushare/dsweb/Get/Document-46969

  32   Wednesday, February 08, 2012, 18:16 Friedhelm Ames      FailedTSG:TP1B and TSG:TP1A failure

Friedhelm Ames wrote:

Both turbo pumps at the source box were found off. TSG:TP1A has been started normally. TSG:TP1B does not spin up above 3KRPM even after several attemps. A fault report has been send to vacuum group.

 

 after about 30 minutes running at normal speed TP1A failed as well. Both pumps will be kept off over night.

  31   Wednesday, February 08, 2012, 17:39 Friedhelm Ames      FailedTSG:TP1B failure

Both turbo pumps at the source box were found off. TSG:TP1A has been started normally. TSG:TP1B does not spin up above 3KRPM even after several attemps. A fault report has been send to vacuum group.

 

  30   Tuesday, January 24, 2012, 09:44 Friedhelm Ames       turbo pumps restarted

All turbo pumps have been restarted after cooling water is back and running.

 

  29   Friday, January 20, 2012, 10:37 Friedhelm Ames       vacuum pumps shut off

turbo pumps shut off due to work on cooling water system

  28   Tuesday, December 20, 2011, 16:09 Anders Mjos      Problems/SolutionsVariable leak valve repaired

Anders Mjos wrote:

Anders Mjos wrote:

Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames.

 The variable leak valve F3-592 has been repaired. Contaminated diaphragm was replaced. See attachment for details.

 The leak valve has been tested with He and a leak detector. The leak valve could regulate in the complete range of the leak detector. 10^-11 to 10^-4 atm cc/s

  27   Monday, December 19, 2011, 13:09 Aurelia Laxdal       Test Stand updates

In January Controls will install a new firewall for ISAC Test Stand. Until then ISAC Test Stand can be used, but it may require an IOC reboot once in while.

  26   Tuesday, December 13, 2011, 14:10 Aurelia Laxdal       Test Stand IOC reboot

Evgeniy rebooted the ISAC Test Stand IOC. Re-started EPICS at the Test Stand.

Found all 4 turbo pumps off and their backing valves closed. Re-started the pumps.

  25   Monday, November 14, 2011, 15:40 Anders Mjos      Problems/SolutionsVariable leak valve repaired

Anders Mjos wrote:

Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames.

 The variable leak valve F3-592 has been repaired. Contaminated diaphragm was replaced. See attachment for details.

Attachment 1: F3-VCR-43_Repair_F3-592.PDF
F3-VCR-43_Repair_F3-592.PDF F3-VCR-43_Repair_F3-592.PDF F3-VCR-43_Repair_F3-592.PDF
  24   Monday, October 17, 2011, 10:22 Anders MjosFEBIAD     Problems/SolutionsVariable leak valve replaced

Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames.

Attachment 1: F3-649.PDF
F3-649.PDF
  23   Thursday, October 13, 2011, 15:42 Anders MjosTraining HP-FEBIAD    Problems/SolutionsTarget ready to be heated

Rick Maharaj wrote:

test stand vented

 Thursday, October 13, 2011, 15:40: Pumping down

Friday, October 14, 2011, 10:00: Cooling water is on. Pressure increase from 8e-7 to 3e-6 torr. Venting.

Friday, October 14, 2011, 11:10: Replaced seals on cooling lines with new silver plated SS seals. Pumping down.

Friday, October 14, 2011, 13:25: Cooling water is on. Vacuum at 1.35e-6 torr.

Monday, October 17, 2011, 09:00: Vacuum at 5.4e-7 torr. target ready to be heated.