169
|
Monday, August 13, 2012, 14:56 |
Pierre Bricault | | | | | | | In progress | FEBIAD test | One thing that seems to be strange regarding
this FEBIAD is the best results are without
any current in the coil. |
|
|
170
|
Thursday, August 16, 2012, 10:41 |
Pierre Bricault | | | | | | | In progress | Test FEBIAD | Ray is finishing the electrical modifications
for the FEBIAD with the biased cathode.
We found the source of the sparks. |
|
|
175
|
Friday, August 17, 2012, 08:30 |
Pierre Bricault | | | | | | | In progress | FEBIAD test with cathode biased | Yesterday Ray Dube has changed the configuration
in order to run the FEBIAD with the cathode
on negative bias. |
|
|
176
|
Friday, August 17, 2012, 10:09 |
Pierre Bricault | | | | | | | In progress | FEBIAD test cathode bias | Backing pressure on the bender section
is quite large. TMSIG6 reads 5.09E-7 T and
TMS:CG2B reads 0.249 T! |
|
|
177
|
Friday, August 17, 2012, 12:53 |
Pierre Bricault | | | | | | | Done | | Test completed.
exel file on My Documents in folder
FEBIAD Test Aout2012/TestFEBIAD |
|
|
58
|
Wednesday, March 07, 2012, 10:36 |
Paul Mocock | | | | | | | | HV conditioning begins. | HV conditioning has begins. Vacuum chamber
pressure is currently 3.2e-07 Torr on TSG:IG1. |
|
|
735
|
Saturday, June 22, 2019, 17:05 |
Luca Egoriti | p2n | | | | | | Done | Test stand installation | I opened the test stand because I forgot
to install tantalum heat shields around the
target. Everything was reinstalled as before |
|
|
744
|
Monday, July 08, 2019, 09:20 |
Luca Egoriti | p2n1 | | ITE | | | | In progress | p2n heating test | (see entry 742)
p2n target heated over the weekend |
|
|
748
|
Sunday, July 28, 2019, 14:22 |
Luca Egoriti | P2N - 1 | HP-FEBIAD | ITE | TM2 | p2n - test1 | p2n - test1 | Problems/Solutions | p2n heating test 3 | Friday. July 26th 2019
A new electrical configuration of
the test stand was decided and installed. |
|
|
749
|
Tuesday, July 30, 2019, 12:19 |
Luca Egoriti | P2N - 1 | HP-FEBIAD | ITE | TM2 | | | Problems/Solutions | p2n heating test - target inspection | The p2n target was taken out of the test
stand for inspection. Comments and measurements
on the container below: |
|
|
751
|
Wednesday, August 07, 2019, 08:18 |
Luca Egoriti | P2N - 1 | | ITE | TM2 | | | Problems/Solutions | p2n heating test 4 | Tuesday, August 06, 2019, 16:00
Start ramp up to 300+300 = 600 A
|
|
|
802
|
Wednesday, July 22, 2020, 08:56 |
Luca Egoriti | P2N test | HP-SIS | ITE | TM4 | | | In progress | p2n heating test - electrical feedthrough configuration | The electrical feedthroughs at the
top of the test stand module were reconfigured
to deliver up to 1200A to the p2n target. |
|
|
870
|
Wednesday, April 14, 2021, 10:21 |
Luca Egoriti | P2N test - Apr 2021 | HP-SIS | | | | | In progress | P2N test - Electrical reconfiguration | Wednesday, April 14, 2021, 10:18
Work started to bring the ATTS PS
inside the ITS HV cage. HV grounding rod |
|
|
872
|
Wednesday, April 28, 2021, 22:34 |
Luca Egoriti | P2N test - Apr 2021 | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A |
|
|
924
|
Monday, May 09, 2022, 10:08 |
Luca Egoriti | | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Beginning of May:
The cabling on the top of the test
stand was changed to adapt for P2N testing. |
|
|
1
|
Wednesday, June 29, 2011, 15:30 |
John Wong | | | | | | | | Testing Yield station elog | ABC 123 blah blah blah... |
|
|
2
|
Wednesday, September 14, 2011, 15:33 |
John Wong | Test#1 | HP-SIS | ITW | TM1 | test | test | In progress | testing elog for test stand | Wednesday, September 14, 2011, 15:33
blah blah blah... |
|
|
12
|
Monday, September 26, 2011, 14:56 |
John Wong | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray |
|
|
|
98
|
Thursday, May 17, 2012, 13:24 |
John Wong | SiC#27 | HP-SIS | ITE | TM4 | 38817-3 | | Problems/Solutions | Solid residues found on EE | Thursday, May 17, 2012, 13:15
After the test-stand, the EE was
removed for inspection. It was discovered |
|
|
1031
|
Thursday, November 28, 2024, 11:47 |
Isaiah Rabuka | | | | | | | In progress | Heating Stage Pellet Testing and Development | Opened the ATTS, placed what I will call
“Cast Alumina Sample #1” into
the ATTS and activated the roughing then |
|