Entry  Monday, August 13, 2012, 14:56, Pierre Bricault, , , , , , , In progress, FEBIAD test 
One thing that seems to be strange regarding this FEBIAD is the best results are without any current in the coil.
Normally for the neon ionization the on-line source wanted to be at around 50 to 80 Amp. Not this one.
Is there anything special about this coil?
Entry  Thursday, August 16, 2012, 10:41, Pierre Bricault, , , , , , , In progress, Test FEBIAD 
Ray is finishing the electrical modifications for the FEBIAD with the biased cathode.
We found the source of the sparks. The disconnected target heater cables were resting on the Einzel lens cap.
 
Entry  Friday, August 17, 2012, 08:30, Pierre Bricault, , , , , , , In progress, FEBIAD test with cathode biased 
Yesterday Ray Dube has changed the configuration in order to run the FEBIAD with the cathode on negative bias.
There were a short between the gas line and the common. The box has been opened and the short removed.
This morning I am turning on the cathode heater to 290 A.
Entry  Friday, August 17, 2012, 10:09, Pierre Bricault, , , , , , , In progress, FEBIAD test cathode bias 
Backing pressure on the bender section is quite large. TMSIG6 reads 5.09E-7 T and TMS:CG2B reads 0.249 T!
Entry  Friday, August 17, 2012, 12:53, Pierre Bricault, , , , , , , Done,  TestFEBIAD.xlsx
Test completed.
exel file on My Documents in folder FEBIAD Test Aout2012/TestFEBIAD
 Edited by Anders 2012-09-19, file attached.
Entry  Wednesday, March 07, 2012, 10:36, Paul Mocock, , , , , , , , HV conditioning begins. 
HV conditioning has begins. Vacuum chamber pressure is currently 3.2e-07 Torr on TSG:IG1.
Entry  Saturday, June 22, 2019, 17:05, Luca Egoriti, p2n, , , , , , Done, Test stand installation 
I opened the test stand because I forgot to install tantalum heat shields around the target. Everything was reinstalled as before (with heat shields).
I could turn on the TSGTP1B but TSGTP1A does not turn on for some reason. I tried multiple times opening/closing its valve (BV1A) but the pump never starts.
Will keep pumping over the weekend with TP1B only.
Entry  Monday, July 08, 2019, 09:20, Luca Egoriti, p2n1, , ITE, , , , In progress, p2n heating test Capture.PNGCapture1.PNG
(see entry 742)
 
p2n target heated over the weekend after the connections between the bottom target legs and the copper connector has been modified from rivets
Entry  Sunday, July 28, 2019, 14:22, Luca Egoriti, P2N - 1, HP-FEBIAD, ITE, TM2, p2n - test1, p2n - test1, Problems/Solutions, p2n heating test 3 20190728_-_p2n_heating_3.PNG
Friday. July 26th 2019 
A new electrical configuration of the test stand was decided and installed. The TGHT and TBHT were parallelized in order to deliver up to 600 +
600 Amperes to the p2n target.
Entry  Tuesday, July 30, 2019, 12:19, Luca Egoriti, P2N - 1, HP-FEBIAD, ITE, TM2, , , Problems/Solutions, p2n heating test - target inspection IMG_20190730_110927.jpgIMG_20190730_113437.jpgIMG_20190730_105629.jpg
The p2n target was taken out of the test stand for inspection. Comments and measurements on the container below:
- Initially, continuity measurements were mode between the target and heat shield (HS) while they were still in the test stand, and looks like
they were shorted. However, after removing the HS from the test stand, no short was seen, not even after moving the target legs. Instead, we confirmed
Entry  Wednesday, August 07, 2019, 08:18, Luca Egoriti, P2N - 1, , ITE, TM2, , , Problems/Solutions, p2n heating test 4 IMG_20190806_182939.jpgIMG_20190806_182953.jpg
Tuesday, August 06, 2019, 16:00
Start ramp up to 300+300 = 600 A
 
Entry  Wednesday, July 22, 2020, 08:56, Luca Egoriti, P2N test, HP-SIS, ITE, TM4, , , In progress, p2n heating test - electrical feedthrough configuration ISACteststand_TMwiring.pptxP2N-TestStand_20200722.pngP2N-TestStand_1200A.png
 The electrical feedthroughs at the top of the test stand module were reconfigured to deliver up to 1200A to the p2n target.
1) The two COIL lines (one + and one -) were disconnected from their terminals E and F
2) The TBHT terminals (two + and two -) were disconnected from A and B
Entry  Wednesday, April 14, 2021, 10:21, Luca Egoriti, P2N test - Apr 2021, HP-SIS, , , , , In progress, P2N test - Electrical reconfiguration ITS_electrical_panel_-_removed.jpgResistance_matrix_2021-04-28.png
 Wednesday, April 14, 2021, 10:18
Work started to bring the ATTS PS inside the ITS HV cage. HV grounding rod and metal sheet around breaker panel were removed - see picture.
 Friday, April 16, 2021, Afternoon
Entry  Wednesday, April 28, 2021, 22:34, Luca Egoriti, P2N test - Apr 2021, P2N-SIS, ITE, TM4, , , In progress, P2N heating test Target_580A_100A_glowing.jpgInitial_rampup.PNG
 Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A shine is already seen, which suggests that current is flowing in the P2N target properly, see picture attached.
Entry  Monday, May 09, 2022, 10:08, Luca Egoriti, , P2N-SIS, ITE, TM4, , , In progress, P2N heating test 2022-05-09_-_Voltage_event_during_rampup.PNG2022-05-09_-_Rampup_and_down.PNGIMG_20220509_111314.jpgITS_short_plasma_electrode_schematics.png
Beginning of May:
The cabling on the top of the test stand was changed to adapt for P2N testing. The TGHT and COIL PS were disconnected, and their DC cable terminals
were connected instead to the TDK-LAMBDA P2Nheaters. The configuration on top of the ITS module is the following:
Entry  Wednesday, June 29, 2011, 15:30, John Wong, , , , , , , , Testing Yield station elog 
ABC 123 blah blah blah...
Entry  Wednesday, September 14, 2011, 15:33, John Wong, Test#1, HP-SIS, ITW, TM1, test, test, In progress, testing elog for test stand 
Wednesday, September 14, 2011, 15:33
blah blah blah...
    Reply  Monday, September 26, 2011, 14:56, John Wong, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray 9-pin-connector.jpg


    
        
            Anders Mjos wrote:
        
        
            
            Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn
Entry  Thursday, May 17, 2012, 13:24, John Wong, SiC#27, HP-SIS, ITE, TM4, 38817-3, , Problems/Solutions, Solid residues found on EE SiC#27_after_teststand.pdfSiC#27_clean_EE.pdf
 Thursday, May 17, 2012, 13:15
After the test-stand, the EE was removed for inspection.  It was discovered that there were some solid residues coated on the extraction electrode
and the common plate, but the ionizer tube was clean (see attachment#1).  Some samples were collected and will try to do some analysis.  This
Entry  Thursday, November 28, 2024, 11:47, Isaiah Rabuka, , , , , , , In progress, Heating Stage Pellet Testing and Development 
Opened the ATTS, placed what I will call “Cast Alumina Sample #1” into the ATTS and activated the roughing then turbo pumps. Currently sample
is in slow heating progress to 1000 degrees Celsius, process is expected to take some time, so I'll revisit after lunch.
 