ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject
  282   Tuesday, March 19, 2013, 09:04 Anders Mjos      Problems/SolutionsVenting TMS section for replacement of TP2 by vacuum group

 

Anders Mjos wrote:

Tuesday, February 26, 2013, 08:24: Started turbo

Tuesday, February 26, 2013, 08:24: Turbo timed out

e-fault 6585 submitted

 

Edi called to inform that he can replace the turbo today.

Tuesday, March 19, 2013, 09:03: Stopped TP6

Tuesday, March 19, 2013, 09:35: Venting

Tuesday, March 19, 2013, 09:48 : TMS section and backing line vented


The turbo pump has been replaced see

https://elog.triumf.ca/TIS/Test-Stand/284

Some heat marks were observed on the turbo pump that was replaced. Vacuum group took pictures.

 

  284   Tuesday, March 19, 2013, 17:25 Sebastian Raeder      Problems/Solutionsnew turbo installed

Edi replaced the faulty turbo pump in the mass separator section.

Roughing and turbo started

vacuum @ 9E-7T after 2.5h

  285   Tuesday, March 19, 2013, 19:13 Sebastian Raeder      Problems/Solutions9 Pin connector rewired to match wiring in TM4

The 9 Pin connector was rewired in the ISAC teststand to match the wiring in TM4

The wiring from the connection board in the HV cage to the connector (view from the target unit onto module) is now the following

      ---------------------------

  \     4     8     9     7     6    /

    \      5      1     2      x   /

            -----------------

with the pairs of wires

1,2   (kapton wire twisted pair all way)

4,5  (kapton wire twisted pair all way)

6,7  (kapton wire twisted pair inside the vacuum chamber,  other twisted pair from top of vacuum chamber to HV cage)

8,9  (kapton wire twisted pair inside the vacuum chamber,  other twisted pair from top of vacuum chamber to HV cage)

 

 

___ for completeness the wiring on top of the vacuum chamber (view from top onto the feedthrough)

 

      ---------------------------

  \     1     2     x     4     5    /

    \      6      7     8      9   /

            -----------------

 

NOTE: with this rewiring the metal screws on the PEEK 9Pin connector have been grounded using Ta foil

 

Thursday, March 21, 2013: there was a short in one of the lines  - most probably due to a shielding strand into the connector, has been resolved by fixation of the shielding in a position further away with Cu wire

 

  288   Monday, March 25, 2013, 16:50 Sebastian Raeder      Problems/SolutionsRFQ powersupplies removed - Anode PS still connected to ground

The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.

 

NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off

  290   Tuesday, April 02, 2013, 15:19 Anders Mjos      Problems/SolutionsWater leak at MB1 Power Supply

See Cyclotron e-fault 6637

 

  291   Tuesday, April 09, 2013, 16:21 Anders Mjos      Problems/SolutionsWater leak at MB1 Power Supply

 

Anders Mjos wrote:

See Cyclotron e-fault 6637

 

 

Tuesday, April 09, 2013:

 Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.

Wednesday, April 10, 2013:

Removed the remaining water in the P/S rack.

  293   Thursday, April 11, 2013, 08:49 Anders Mjos      Problems/SolutionsMB1 Power Supply operational

 

Anders Mjos wrote:

 

Anders Mjos wrote:

See Cyclotron e-fault 6637

 

 

Tuesday, April 09, 2013:

 Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.

Wednesday, April 10, 2013:

Removed the remaining water in the P/S rack.

Thursday, April 10, 2013:

The power supply is again operational. See e-fault entry above for details.

  294   Tuesday, April 16, 2013, 08:59 Anders Mjos      Problems/SolutionsTMS:TP2 found in timeout / fault state

Tuesday, April 16, 2013, 08:59

The turbo was found in fault state this morning. Based on data from IG6 the pump stopped around midnight.

An attempt to restart the pump will be made after the conditioning of Ta#40 is complete later today.

The TP has recently been replaced:

https://elog.triumf.ca/TIS/Test-Stand/280


Tuesday, April 16, 2013, 16:23: TMS:TP2 restarted I=1.0A P=21W T=29C @ 42kRPM


Wednesday, April 17, 2013, 16:19: TMS:TP2 I=0.8A P=14W T=29C @ 42kRPM

  297   Friday, May 03, 2013, 14:32 Anders Mjos      Problems/SolutionsCathode PS cable reconnected

 

Sebastian Raeder wrote:

The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.

 

NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off

 

Friday, May 03, 2013

The anode cable has been reconnected to F/T J and the 100k resistor placed between L and J. Q is now grounded to L. See dwg ISK4523

Tuesday, May 07, 2013

The cathode cable has been reconnected to F/T B and the 100k resistor removed between L and J. See dwg ISK4563 Rev 3

 

  298   Wednesday, May 08, 2013, 08:52 Anders Mjos      Problems/SolutionsTMS and TPS P/S problems

Wednesday, May 08, 2013, 08:52: TMS:CB5 found off this morning. Switched back on.

Wednesday, May 08, 2013, 12:14: Lost the following devices during a mass scan

TMS:VCB5
TMS:OCT3
TPS:Q4
TPS:Q2
TPS:Q1
TSG:CBC

All devices but TPS:Q1 could be completely restored.

Wednesday, May 08, 2013, 12:49: TPS:Q1 restored by lowering and increasing the voltage

 

  299   Thursday, May 09, 2013, 15:28 Anders Mjos      Problems/SolutionsTSGRP1 showing signs of reduced performance

TSG:CG1A and TSG:CG1B shows an increase in vacuum.

See attached archived data for details.

  304   Tuesday, May 21, 2013, 19:38 Friedhelm Ames      Problems/Solutionsmagnet power supply water leak

The cyclotron operators discovered a water leak in the magnet power supply. The water is valved off and the power is off. A fault report has been issued to the power supplies group.

  306   Tuesday, May 28, 2013, 09:51 Anders Mjos      Problems/SolutionsArchivers restarted

COIL and ANODE data added to ISACT Data Archiver

  307   Tuesday, May 28, 2013, 09:53 Anders Mjos      Problems/SolutionsTPS:Q4 and TPS:Q2 restarted
  309   Monday, June 03, 2013, 15:00 Anders Mjos      Problems/SolutionsSOURCES ARCH Restarted

SOURCES ARCH was found not running

  310   Friday, June 07, 2013, 08:47 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off

Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1

  311   Monday, June 10, 2013, 08:16 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off

Anders Mjos wrote:

Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1

 Monday, June 10, 2013, 08:16: Restarted Q2 and Q4

  312   Monday, June 10, 2013, 16:46 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off

 

Anders Mjos wrote:

 

Anders Mjos wrote:

Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1

 

 Monday, June 10, 2013, 08:16: Restarted Q2 and Q4

 

 Monday, June 10, 2013, 16:44: Restarted Q2 and Q4. A dip in coil current and voltage was seen at the same time.

  313   Tuesday, June 11, 2013, 08:41 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off

 

Anders Mjos wrote:

 

Anders Mjos wrote:

 

Anders Mjos wrote:

Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1

 

 Monday, June 10, 2013, 08:16: Restarted Q2 and Q4

 

 Monday, June 10, 2013, 16:44: Restarted Q2 and Q4. A dip in coil current and voltage was seen at the same time.

 

Tuesday, June 11, 2013, 08:41: Restarted Q1, Q2 and Q4

Tuesday, June 11, 2013, 10:36: Restarted Q2 and Q4. No sign of sparks

Tuesday, June 11, 2013, 11:06: Restarted Q1, Q2, Q4 and CBC. No sign of sparks

Tuesday, June 11, 2013, 11:52: Restarted Q1, Q2 and Q4

Tuesday, June 11, 2013, 14:40:  Restarted Q1, Q2, Q4 and CBC.

  314   Wednesday, June 12, 2013, 20:38 Friedhelm Ames      Problems/Solutionstarget heater power supply removed

The target heater power supply at the teststand has been removed to replace one in ITE.