Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 49 of 53  Not logged in ELOG logo
Entry  Monday, July 13, 2020, 14:52, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 43515-2, , UCx HS conditioning.  
Broken LP-FEBIAD used to out gas.
Monday, July 13, 2020, 14:52: Roughing.
Monday, July 13, 2020, 15:29: Turbo pumps on. 
Entry  Tuesday, August 18, 2020, 10:00, Aaron Schmidt, , , , , , , , IDP15 Scroll pump installed - RP1 replaced 
PN: X3815-64000
SN: MY2005SA02
Description: IDP15 Scroll pump, Std.
Entry  Wednesday, August 19, 2020, 08:52, Aaron Schmidt, , , , , , , , Leak check / Troubleshoot Aug_19_-_2020_Leak_Check..docx
Wednesday, August 19, 2020, 08:52: Purging all lines, except FS#5, It was already purged / closed.
Wednesday, August 19, 2020, 11:24: Vacuum @ 1.76e-06T.
Wednesday, August 19, 2020, 11:29: FS#2 opened. Observable vacuum spike noted. vacuum @ 2.2e-06T. Purge & Close.
Entry  Wednesday, December 02, 2020, 08:32, Carla Babcock, , , , , , , , Modifications to test stand for TM3 tests 
Wednesday, December 02, 2020, 08:31 :
Added copper wire connection to multipin screw terminals in HV cage to make sure they are grounded.
Attached grounding rod to back of HV cage. Not ideal, but couldn't find a better place without making a extension to the cable. Will see what John
Entry  Thursday, December 03, 2020, 15:55, Carla Babcock, Alexander Shkuratoff, , , , , , , , Modifications to ISAC test stand for TM3 tests 20201203_150458.jpg20201203_173725.jpg
Thursday, December 03, 2020, 15:54 :
Got sign off from John Chow to run the system, though the nylon insulator was not ready when he came by. But we went over everything together.
Installed blue nylon insulator with all vacuum surfaces cleaned at least with methanol. No NPT fitting or tube installed, just testing service
Entry  Friday, December 04, 2020, 08:53, Carla Babcock, , , , , , , , Modifications to test stand for TM3 tests 
Friday, December 04, 2020, 08:52 :
Test stand roughed down to 29mT overnight. Started turbos for testing later.
Entry  Tuesday, December 08, 2020, 11:54, Carla Babcock, , , , , , , , Modifications to test stand for TM3 tests 20201207_135011.jpg20201207_134951.jpgScreenshot_from_2020-12-09_19-41-36.png
The copper tubes to be used in the TM3 test piece may have flux inside them from soldering the end caps on. There are holes along the length for outgassing,
and we will try to bake them out in the test stand before installing them. There is still a dummy bake out target installed there, see the photo for how
the tubes are loaded in. TGHT ramping started around 3pm.
Entry  Friday, December 11, 2020, 15:02, Carla Babcock, Sam McEwen, Aaron Schmidt, , , , , , , , Modifications to test stand for TM3 tests 20201211_140703.jpg20201211_140639.jpg20201211_140605.jpg
Test piece installed with Sam, Aaron and Alexander. Ended up shimming the support stand (middle foot) since it seemed to be bowing a bit and distorting
the gap between the containment box stand-in piece and the service tray piece. We should measure the gaps when testing is done with the same configuration.
Installation was not too hard, installed the whole thing as one piece. Had to remove the middle foot on the long side to get it through the door but otherwise
Entry  Tuesday, December 15, 2020, 11:24, Alexander Shkuratoff, , , , , , , , TM3 service tray prototype HV tests 
Tuesday, December 15, 2020, 11:15
Vacuum at 1.0e-6 Torr. Turned bias power supply on, starting HV ramp at 500 V increments, increasing every 30-50 seconds seconds or so.
 
Entry  Wednesday, December 16, 2020, 10:32, Carla Babcock, Alexander Shkuratoff, , , , , , , , TM3 service tray prototype HV tests 
Wednesday, December 16, 2020, 10:30 (Carla) :
Started ramping up about 45 mins ago, now at 50kV with no issues. No sparking, occasional current draw to get to the next voltage step. Test piece
is no longer drawing any current, as opposed to yesterday when it was drawing around 4uA at this point. Trace left on insulator must have partially evaporated
Entry  Thursday, December 17, 2020, 08:16, Carla Babcock, Alexander Shkuratoff, , , , , , , ,  
Ramping up to 75kV. Started drawing current at 63.5kV this time.
Now at 75kV, drawing 5uA of current. Ramp up easy.
 
Entry  Monday, December 21, 2020, 07:58, Aaron Schmidt, , , , , , , , Shutdown TS  
Shutting down the ISAC TS for the planned outage on Dec 22.
Monday, December 21, 2020, 07:50: Ion gauges & turbo pumps off.
Monday, December 21, 2020, 07:51: Confirm wire scanner shutoff.
Entry  Monday, January 04, 2021, 08:17, Aaron Schmidt, , , , , , , , Restart TS 
Restarting TS after holidays & planned power outage.
Monday, January 04, 2021, 08:17: All epics controls in a 'white out' state.
Monday, January 04, 2021, 08:20: Rebooted PLC / IOC. Controls returned.
Entry  Monday, January 11, 2021, 14:20, Carla Babcock, , , , , , , , Test stand wiring reverted to anode bias mode 
I have rewired the test stand (service cap wiring only, not power supply wiring) to anode bias mode as shown in the diagram. This was not how it was
wired before, there are several things I have removed that appear to be newer additions. I also removed the burned cable between TBHT(-) and COIL(-), and
between the multipin feedthrough and ground (probably related to the other burned cable).
Entry  Thursday, February 18, 2021, 10:47, Aaron Schmidt, , , , , , , , Optics loss / CANBUS failure. 
Thursday, February 18, 2021, 10:45: TPS:Q3 & the TSB CBC CANBUS controllers had failed yesterday, as well as a cable was incorrectly seated. This
was fixed this morning.
Entry  Tuesday, March 02, 2021, 11:42, Aaron Schmidt, , , , , , , , TS Tripped. 
 
Entry  Wednesday, March 10, 2021, 11:10, Carla Babcock, , , , , , , , Venting for installation of emittance meters 
Wednesday, March 10, 2021, 10:48  : Venting beamline section only for installation of emittance meters.
Entry  Monday, March 15, 2021, 16:10, Carla Babcock, , , , , , , , TISA emittance meter testing with new FEBIAD source Carla_tune_tracking.docx
Monday, March 15, 2021, 16:09 Target and ion source ramped to 400A/330A this afternoon
Monday, March 15, 2021, 18:53 : Tune through to final RPMs but not optimized. 5e-8 on FC0. Will turn down target and ion source values to TGHT/TBHT
350/250 until tomorrow. BIAS/EZL/COIL/ANODE all off.
Entry  Thursday, March 25, 2021, 08:11, Aaron Schmidt, , , , , , , , Test Stand Tripped. (Water leak) Mar_2021_-_FS#3_leak..docx
 
Entry  Friday, March 26, 2021, 17:04, Carla Babcock, , , , , , , , Beam line vented for emittance meter exchange 
Vented beamline and removed ARIEL emittance meter. In the process of swapping components, beamline left vented until Monday when we will finish the job.
ELOG V2.9.2-2455