ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
128
|
Thursday, July 05, 2012, 10:59 |
Friedhelm Ames | | | | | | | Problems/Solutions | water tripping in front of HV power supplies |
Found some water tripping in front of the high voltage power supplies rack from the water lines at the ceiling. Plastic sheets have been put on top of the racks and MCR has been informed. |
127
|
Thursday, July 05, 2012, 08:41 |
Anders Mjos | FEBIAD anode end cap test | | | | | | In progress | Water opened - reduced flow heat shield |
Anders Mjos wrote: |
Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.
NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit. (see attachment)
Wednesday, July 04, 2012, 15:33: Started roughing.
Wednesday, July 04, 2012, 15:57 : Started turbos
Wednesday, July 04, 2012, 16:03: Turbos at speed. Vacuum at 3E-5
|
Thursday, July 05, 2012, 08:39: Water supply open. Vacuum stable at 5.9E-7. Due to the kink in the heat shield cooling line, flow in the heat shield line is lower than other lines (visually inspecting speed of paddle wheels). |
126
|
Wednesday, July 04, 2012, 15:37 |
Anders Mjos | FEBIAD anode end cap test | | | | | | In progress | Pumping down |
Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.
NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit. (see attachment)
Wednesday, July 04, 2012, 15:33: Started roughing.
Wednesday, July 04, 2012, 15:57 : Started turbos
Wednesday, July 04, 2012, 16:03: Turbos at speed. Vacuum at 3E-5 |
Attachment 1: photo_8.jpg
|
|
125
|
Wednesday, July 04, 2012, 15:33 |
Anders Mjos | | | | | | | Problems/Solutions | short in anode |
Friedhelm Ames wrote: |
A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.
|
Wednesday, July 04, 2012: short found between anode and target. probably caused by the target tube coming in contact with the anode due to bending of the tube caused by heating and deformation of the grid retaining ring. see attachements |
Attachment 1: photo_1.JPG
|
|
Attachment 2: photo_3.JPG
|
|
124
|
Wednesday, July 04, 2012, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | water lines purged |
Friedhelm Ames wrote: |
turbo pumps stopped to prepare for venting for anode short investigation.
|
Wednesday, July 04, 2012, 13:07: Water lines purged |
123
|
Wednesday, July 04, 2012, 09:22 |
Friedhelm Ames | | | | | | | Problems/Solutions | turbo pumps stopped |
turbo pumps stopped to prepare for venting for anode short investigation. |
122
|
Tuesday, July 03, 2012, 19:05 |
Friedhelm Ames | | | | | | | Problems/Solutions | short in anode |
A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate. |
121
|
Tuesday, July 03, 2012, 09:23 |
Friedhelm Ames | | | | | | | In progress | start up again |
purged Ne line and started cathode heater ramp up to 295 A |
120
|
Friday, June 29, 2012, 16:39 |
Friedhelm Ames | | | | | | | | mass scan finished |
new parameters for mass scan program after fit of mass scan
CONST11 = -4.13
CONST22 = 0.09595 |
119
|
Friday, June 29, 2012, 15:03 |
Friedhelm Ames | | | | | | | | start ramping down heater |
|
118
|
Friday, June 29, 2012, 15:02 |
Friedhelm Ames | | | | | | | | mass scan finished |
mass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt
|
Attachment 1: mass_spectrum_2012_06_29.PNG
|
|
117
|
Friday, June 29, 2012, 13:39 |
Friedhelm Ames | | | | | | | | start mass scan |
start mass scan to do new mass calibration |
116
|
Friday, June 29, 2012, 08:57 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Continue cathode heating |
This morning the pressure was 3.5E-7 T. Current at 275 A is 30nA.
Continue cathode heating to 290 A during meeting.
Start seeing some electron current from the cathode around 275 A. |
115
|
Thursday, June 28, 2012, 17:18 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Leave the cathode heater at 275 A overninght. |
|
114
|
Thursday, June 28, 2012, 17:00 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heater reached its value of 230 A and stoped. good test. |
Now ramp cathode current up to 290 A. The total current out is 1.e-7 A.
|
113
|
Thursday, June 28, 2012, 15:14 |
Aurelia Laxdal | | LP-FEBIAD | | | | | | Quick check |
Just a quick check at the Test Stand:
1. The system operational ( white out not present ) with TSH:TBHT heating in progress.
2. Started the Archivers: for Source and Optics.
3. Removed bypass on TSH:SV5 since it's not necessary anymore.
4. Currently: TSH:TBHT=107A |
112
|
Thursday, June 28, 2012, 11:29 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Lost all cnntrol interface, complete whiteout of the epics system. |
|
111
|
Thursday, June 28, 2012, 11:27 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heating in progress, pressure 8.3e-7 T |
|
110
|
Thursday, June 28, 2012, 11:19 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode ramping to 230 A in progress |
|
109
|
Thursday, June 28, 2012, 11:13 |
Pierre Bricault | | LP-FEBIAD | | | | | | ISAC test stand ready for cathode heating |
The ISAC test stand is ready for cathode heating.
Bias voltage: 30000 V
Bias current: 37 microAmp
Anode bias: 200 V
Anode current: 6.105 mA
Cathode current: 0 Amp
Cathode voltage: 0 V
Coil current: 30 A
Coil Voltage 0.2 V
EE Voltage: 1800 V
EE current: 30 microAmp
Einzel Lens voltage: 14000 V
Einzel lens current: 49 microAmp. |