124
|
Wednesday, July 04, 2012, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | water lines purged |
Friedhelm Ames wrote: |
turbo pumps stopped to prepare for venting for anode short investigation.
|
Wednesday, July 04, 2012, 13:07: Water lines purged |
123
|
Wednesday, July 04, 2012, 09:22 |
Friedhelm Ames | | | | | | | Problems/Solutions | turbo pumps stopped |
turbo pumps stopped to prepare for venting for anode short investigation. |
122
|
Tuesday, July 03, 2012, 19:05 |
Friedhelm Ames | | | | | | | Problems/Solutions | short in anode |
A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate. |
121
|
Tuesday, July 03, 2012, 09:23 |
Friedhelm Ames | | | | | | | In progress | start up again |
purged Ne line and started cathode heater ramp up to 295 A |
120
|
Friday, June 29, 2012, 16:39 |
Friedhelm Ames | | | | | | | | mass scan finished |
new parameters for mass scan program after fit of mass scan
CONST11 = -4.13
CONST22 = 0.09595 |
119
|
Friday, June 29, 2012, 15:03 |
Friedhelm Ames | | | | | | | | start ramping down heater |
|
118
|
Friday, June 29, 2012, 15:02 |
Friedhelm Ames | | | | | | | | mass scan finished |
mass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt
|
117
|
Friday, June 29, 2012, 13:39 |
Friedhelm Ames | | | | | | | | start mass scan |
start mass scan to do new mass calibration |
116
|
Friday, June 29, 2012, 08:57 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Continue cathode heating |
This morning the pressure was 3.5E-7 T. Current at 275 A is 30nA.
Continue cathode heating to 290 A during meeting.
Start seeing some electron current from the cathode around 275 A. |
115
|
Thursday, June 28, 2012, 17:18 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Leave the cathode heater at 275 A overninght. |
|
114
|
Thursday, June 28, 2012, 17:00 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heater reached its value of 230 A and stoped. good test. |
Now ramp cathode current up to 290 A. The total current out is 1.e-7 A.
|
113
|
Thursday, June 28, 2012, 15:14 |
Aurelia Laxdal | | LP-FEBIAD | | | | | | Quick check |
Just a quick check at the Test Stand:
1. The system operational ( white out not present ) with TSH:TBHT heating in progress.
2. Started the Archivers: for Source and Optics.
3. Removed bypass on TSH:SV5 since it's not necessary anymore.
4. Currently: TSH:TBHT=107A |
112
|
Thursday, June 28, 2012, 11:29 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Lost all cnntrol interface, complete whiteout of the epics system. |
|
111
|
Thursday, June 28, 2012, 11:27 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heating in progress, pressure 8.3e-7 T |
|
110
|
Thursday, June 28, 2012, 11:19 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode ramping to 230 A in progress |
|
109
|
Thursday, June 28, 2012, 11:13 |
Pierre Bricault | | LP-FEBIAD | | | | | | ISAC test stand ready for cathode heating |
The ISAC test stand is ready for cathode heating.
Bias voltage: 30000 V
Bias current: 37 microAmp
Anode bias: 200 V
Anode current: 6.105 mA
Cathode current: 0 Amp
Cathode voltage: 0 V
Coil current: 30 A
Coil Voltage 0.2 V
EE Voltage: 1800 V
EE current: 30 microAmp
Einzel Lens voltage: 14000 V
Einzel lens current: 49 microAmp. |
108
|
Thursday, June 28, 2012, 11:04 |
Pierre Bricault | Test FEBIAD | LP-FEBIAD | | | | | In progress | Ready to bias the high voltage. |
|
107
|
Tuesday, June 26, 2012, 18:30 |
Anders Mjos | | | | | | | Problems/Solutions | Crack in source tray insulator |
A crack in the insulator ITD0054 was observed while mounting the target assembly. See attachment. |
106
|
Tuesday, June 26, 2012, 18:04 |
Anders Mjos | FEBIAD anode end cap test | | | | Tube only | 38307-9 | In progress | FEBIAD anode end cap test - ready |
Testing FEBIAD anode end cap as per dwg ITD0304 REV C
Target with TUBE ONLY. Do not use target heater.
Tuesday, June 26, 2012, 18:03: Roughing
Tuesday, June 26, 2012, 18:24: Turbos started
Tuesday, June 26, 2012, 18:31 : Turbos at speed. Vacuum at 1.8E-5
Wednesday, June 27, 2012, 08:48: Cooling opened. Vacuum stable at 4.2E-7. Ready for testing.
|
105
|
Tuesday, June 26, 2012, 16:06 |
Anders Mjos | | | | | | | Done | Vented |
Anders Mjos wrote: |
HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting turbos.
Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5
|
Tuesday, June 26, 2012, 16:06: Turbos off.
Tuesday, June 26, 2012, 17:20: Vented. |