164
|
Sunday, August 12, 2012, 21:50 |
Pierre Bricault | | | | | | | In progress | Test FEBIAD | Lost communication with EPICS. Came in
reset the ...
So far no luck. |
|
|
163
|
Saturday, August 11, 2012, 16:18 |
Pierre Bricault | | | | | | | | Test FEBIAD anode biased at 120 V | The ramp up finished.
I have 3.35E-6 Amp out of the source
on FC0. |
|
|
162
|
Saturday, August 11, 2012, 13:34 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | In progress | Test FEBIAD anode bias 120 V | |
|
|
161
|
Friday, August 10, 2012, 15:57 |
Pierre Bricault | | | | | | | | | Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok |
|
|
160
|
Friday, August 10, 2012, 15:29 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | | finishing the gas installation and its pump | 1524H Start small pump.
1529H stop the pump.
|
|
|
159
|
Friday, August 10, 2012, 14:08 |
Rick Maharaj | | | | | | | | Gas line pump | Gas line vacuum pump reinstalled after
fitting was modified to receive a standard
swagelok connector. The vacuum line was plumbed |
|
|
158
|
Friday, August 10, 2012, 13:48 |
Anders Mjos | | | | | | | Problems/Solutions | He line leak checked - leak fixed | A major leak was found on the connection
to the regulation valve on the He bottle.
Ferrule replaced. System leak checked. |
|
|
157
|
Friday, August 10, 2012, 12:44 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | In progress | FEBIAD test | Rick put the helium bottle back in the
rack.
Waiting for status of the gas lines. |
|
|
156
|
Friday, August 10, 2012, 11:29 |
Pierre Bricault | NA | | | | N A | NA | In progress | Test FEBIAD | The helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out |
|
|
155
|
Thursday, August 09, 2012, 13:08 |
Pierre Bricault | | | | | | | | Test FEBIAD | Waiting Rick for the fitting on the vacuum
pump. |
|
|
154
|
Thursday, July 19, 2012, 12:59 |
Anders Mjos | | | | | | | Problems/Solutions | Leak checking doors - no response | Thursday, July 19, 2012, 12:57: Doors leak
checked. No response. Base rate 1.6E-8 atm-cc/sec.
TP pressuer 0.0E-4 Torr . TSGIG1 4.2E-6 Torr. |
|
|
153
|
Thursday, July 19, 2012, 11:32 |
Anders Mjos | | | | | | | Done | Pumping down | Thursday, July 19, 2012, 11:29: roughing
Thursday, July 19, 2012, 11:49: starting
turbos |
|
|
152
|
Thursday, July 19, 2012, 11:31 |
Anders Mjos | | | | | | | Problems/Solutions | Wiped o-rings and sealing faces |
|
|
|
151
|
Thursday, July 19, 2012, 09:35 |
Anders Mjos | | | | | | | Done | Venting to investigate leak on front door | Thursday, July 19, 2012, 09:35: Switched
off both turbos.
Thursday, July 19, 2012, 10:23: Venting |
|
|
150
|
Thursday, July 19, 2012, 08:42 |
Anders Mjos | | | | | | | Problems/Solutions | Leak checking source chamber - leak found on front door | Due to high vacuum a leak check will be
done on the system.
Thursday, July 19, 2012, 09:00 : |
|
|
149
|
Wednesday, July 18, 2012, 14:08 |
Anders Mjos | | | | | | | Problems/Solutions | Air supply leak on manifold fixed |
|
|
|
148
|
Tuesday, July 17, 2012, 10:10 |
Anders Mjos | | | | | | | Problems/Solutions | Gas lines leak checked - air supply leak on manifold | Leak found on the Ne supply line. 1E-4
- 1E-5 range. Replaced fittings. Had to use
one brass piece. Leak rate 6E-9 (probably |
|
|
147
|
Monday, July 16, 2012, 15:46 |
Anders Mjos | | | | | | | In progress | Pumping down | Monday, July 16, 2012, 15:11: Roughing.
Monday, July 16, 2012, 15:38: Turbos
started. |
|
|
146
|
Thursday, July 12, 2012, 15:49 |
Anders Mjos | | | | | | | | test stand vented for TP1A replacement | see e-fault 6142 |
|
|
145
|
Thursday, July 12, 2012, 13:49 |
Anders Mjos | | | | | | | Problems/Solutions | Aluminum oxide found inside TSHSV1 | Aluminum oxide found inside TSHSV1 and
the copper line to TSHUHV1.