Entry  Wednesday, March 27, 2019, 11:01, Aaron Schmidt, , , , , , , Problems/Solutions, BIAS PS replaced. Test NEW_BIAS_PS_testing_-_2019.docx
Wednesday, March 27, 2019, 10:25: BIAS @ 1 kV
952V - 548uA on controls readback - Scaling req'd
964V  direct from the PS - 25 uA
Entry  Friday, May 03, 2019, 08:30, Anders Mjos, , , , , , , In progress, Training 
Training: Venting and pump down
Friday, May 03, 2019, 08:30: Turbo pumps stopped.
Entry  Wednesday, May 22, 2019, 13:47, Aaron Schmidt, , , , , , , , Calibrated Masscorr 
Wednesday, May 22, 2019, 13:44: Calibration Confirmed.
New Masscorr setup:
Entry  Monday, June 03, 2019, 14:13, Aaron Schmidt, , , , TM4, 395530-3, 42752-5, Done, TMS:TP6 Turbo pump issue. (Ok now) 
Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud hum / buzz sound. The vacuum pressure is steadily increasing on IG6. Edi Contacted. Turbo pump likely failing.
The sound tapered off.
Entry  Friday, June 07, 2019, 16:56, Carla Babcock, , , , , , , , TM4 source tray state 
TM4 source tray left in test stand over weekend, just the rouging pumps on. Ready to be removed Monday morning.

Monday, June 10, 2019, 06:35: Venting - Aaron S. 
Entry  Monday, June 10, 2019, 14:34, Aaron Schmidt, , , , , , , Done, Removed TM4 Source Tray 
Monday, June 10, 2019, 09:30: TM4 Source Tray removed - To HC area.
Entry  Monday, June 10, 2019, 14:35, Aaron Schmidt, , , , , , , Done, Optics Tray / EZL inspection. 20190610_135100.jpg20190610_135926.jpg20190610_135045.jpg20190610_135517.jpg
Monday, June 10, 2019, 13:00: Optics Tray removed.
Megger'd @ 1000V on EZL and Collimator. Passed. Open it.
Monday, June 10, 2019, 14:34: 3 cracked insulators found. 1 quite broken on the threads (see attached pictures). Replaced insulators & re-assembled
Entry  Thursday, June 13, 2019, 14:05, Aaron Schmidt, , , , , , , Done, Spare TGHT PS installed. 
Thursday, June 13, 2019, 14:04: Spare TGHT PS installed /  tested. The old one is to be sent out for repair.
 
Entry  Wednesday, June 19, 2019, 17:25, Fernando Maldonado, , , , , , , Done, Thermocouple connection 
Wednesday, June 19, 2019, 17:13  Ferran and Fernando tested the 9-pin connector to have a reading on a thermocouple following the connections used
by Aurelia (see elog 721).
Wednesday, June 19, 2019, 17:24: Test succesful!
Entry  Friday, June 21, 2019, 15:12, Aaron Schmidt, P2N - 1, , , , , , , P2N - 1 - 2019 
Friday, June 21, 2019, 14:48: Roughing.
Friday, June 21, 2019, 15:18: Turbo pumps on.
Friday, June 21, 2019, 15:31: IG1 on.
Entry  Saturday, June 22, 2019, 17:05, Luca Egoriti, p2n, , , , , , Done, Test stand installation 
I opened the test stand because I forgot to install tantalum heat shields around the target. Everything was reinstalled as before (with heat shields).
I could turn on the TSGTP1B but TSGTP1A does not turn on for some reason. I tried multiple times opening/closing its valve (BV1A) but the pump never starts.
Will keep pumping over the weekend with TP1B only.
Entry  Monday, June 24, 2019, 15:41, Fernando Maldonado, , , , , , , Problems/Solutions, TMS:Q3 polarity 
Monday, June 24, 2019, 15:25: Current quadrupole polarities:

    
        
             

           Top/Bottom
            North/South
        
    
    
Entry  Tuesday, June 25, 2019, 17:19, Fernando Maldonado, , , , , , , Problems/Solutions, Burnt cables on top of the test stand 20190625_154015.jpg20190625_153834.jpg20190625_165001.jpg
Tuesday, June 25, 2019, 16:15: While inspecting the 9-pin connection with Ferran, it was noticed how two braided cables were burnt out pretty bad to
the point they were separated in half (see attached pictures).  Additionally the plastic insulator for the anode wire was melted.
Tuesday, June 25, 2019, 16:30: Braided cables need to be changed and anode wire redone. 
Entry  Wednesday, June 26, 2019, 14:41, Carla Babcock, none, , , , , , Problems/Solutions, Issues with test stand wiring in service cap area isk4523d_ITSrewiring_June2019.png
The wiring on the top of the test stand was burned, see entry 737.
Probable cause of this is as follows:
Coil lines are connected by a wire to HV common, the 9-pin feedthrough etc to maintain same voltage on all the insulator tops. This is also directly
Entry  Thursday, June 27, 2019, 09:51, Fernando Maldonado, , , , , , , Problems/Solutions, Melted cables changed 
See elog 737 

    
        
            Fernando
Entry  Tuesday, July 02, 2019, 18:25, Fernando Maldonado, , , , , , , Done, Blank on FEBIAD gas line installed 20190702_182254.jpg
 Tuesday, July 02, 2019, 18:24: A blind is installed  on the FEBIAD gas line (see attached picture)  to rule out the possibility
of  gases entering the TIS.
Entry  Thursday, July 04, 2019, 15:15, Aaron Schmidt, P2N - 1, , , , , , , P2N - 1 - 2 - 2019 
Screws instead of rivets on target leg. Insulator changed.
Thursday, July 04, 2019, 15:14: Roughing
Thursday, July 04, 2019, 16:00: Turbos on.
Entry  Thursday, July 04, 2019, 15:16, Aaron Schmidt, , , , , , , Problems/Solutions, TBHT insulator changed 
Thursday, July 04, 2019, 15:00: TBHT insulator was swapped out on the source tray side.  
The old one is very chipped.
Entry  Monday, July 08, 2019, 09:20, Luca Egoriti, p2n1, , ITE, , , , In progress, p2n heating test Capture.PNGCapture1.PNG
(see entry 742)
 
p2n target heated over the weekend after the connections between the bottom target legs and the copper connector has been modified from rivets
Entry  Monday, July 15, 2019, 15:59, Fernando Maldonado, P2N, , , , , , Done, Re-wiring on service cap. 
Monday, July 15, 2019, 15:54 : TBHT high current cables moved to Coil feedthroughs.
Coil high current cables moved to TBHT feedthroughs.
Resistor across  Coil feedthroughs E and F are now moved between TBHT feedthroughs A and B.