Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 42 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  641   Wednesday, February 28, 2018, 11:50 Aaron Schmidt       HV Test Np

New parts installed. Corona Shield, brackets, and board/spark gap orientation.

Wednesday, February 28, 2018, 11:48: Power on. Ready to test

Wednesday, February 28, 2018, 14:00: BIAS / EZL / EE @ 30 / 13 / 1.5 kV

Wednesday, February 28, 2018, 14:06: BIAS / EZL / EE @ 40 / 17 / 2.0 kV

Wednesday, February 28, 2018, 14:11: BIAS / EZL / EE @ 55 / 24 / 2.8 kV

Wednesday, February 28, 2018, 14:16: BIAS / EZL / EE @ 60 / 28 / 3.1 kV

Wednesday, February 28, 2018, 14:18: BIAS / EZL / EE @ 62 / 30 / 3.2 kV

Wednesday, February 28, 2018, 14:21: BIAS / EZL / EE @ 63 / 31 / 3.2 kV

Wednesday, February 28, 2018, 14:26: BIAS / EZL / EE @ 65 / 32.5 / 3.2 kV

Wednesday, February 28, 2018, 14:32: BIAS / EZL / EE @ 66 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:35: BIAS / EZL / EE @ 66.5 / 33.5 / 3.3 kV ***2 sparks***

Wednesday, February 28, 2018, 14:37: BIAS / EZL / EE @ 66 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:41: BIAS / EZL / EE @ 66.5 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:44: BIAS / EZL / EE @ 67 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:47: BIAS / EZL / EE @ 68 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:49: BIAS / EZL / EE @ 68.75 / 33 / 3.3 kV ***Spark***

Wednesday, February 28, 2018, 14:51: BIAS / EZL / EE @ 68 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:57: *** 2 sparks ***


The BIAS was pushed to 69 kV however the resulting sparks shut down the communications with the test stand computer.

RPM0B was put into a continuous running cycle and had to be shut off manually.

The voltage was brought back down remotely via a separate computer. Turbo pump TMS : TP2 was also restarted.

Attachment 1: 2018_HV_test_Np.docx
  642   Thursday, March 01, 2018, 10:05 Carla Babcock       HV tests with corona discharge problems solved

Turning up bias, no corona discharge at 60kV but a spark at 61.5kV bias, 31kV EZL, -800V EE

Thursday, March 01, 2018, 10:26: BIAS / EZL / EE @ 65 / 32.5 / 3.2 kV

Thursday, March 01, 2018, 10:32: Spark* Knocked out turbo pump TMS : TP6 (Restarted) Communications restarted. RPM0A restarted.

Thursday, March 01, 2018, 10:44: BIAS / EZL / EE @ 61 / 30.5 / 3.1 kV

Attachment 1: 01032018_10am_61kVspark.PNG
01032018_10am_61kVspark.PNG
  643   Tuesday, March 06, 2018, 10:55 Carla Babcock       Trying HV without electronics

I have removed the resistor/varistor combinations that go between the poles of the target and tube heaters, and between those two supplies. I tested all the components to make sure they were still working after the sparks - for the record the varistors clamp at 23V, not 33V as implied by the schematic.

Tuesday, March 06, 2018, 10:48  BIAS/EE/EZL = 59.5/-1000/29.5  There was some kind of spark, the current on the bias supply went up to 400uA ( normally at 40 +/- 5 ) and the vacuum jumped a bit ( but still in the 10e-7 range ) but I didn't hear anything. It took out TP6 again. See first attachment.

Tuesday, March 06, 2018, 10:54  BIAS/EE/EZL = 60/-1/30

...

Problems

...

Tuesday, March 06, 2018, 12:00 BIAS/EE/EZL = 60/-1.5/29

Tuesday, March 06, 2018, 12:37 BIAS/EE/EZL = 62/-1.5/30

Tuesday, March 06, 2018, 14:11 BIAS/EE/EZL = 64/-1.5/31 No sparks but occasional ticking sounds from either the EZL or behind where the EE is... see second screenshot

Tuesday, March 06, 2018, 14:40 BIAS/EE/EZL = 65/-1.5/33

 

Test stand has been sitting at 65kV for about an hour now. Some small increases in bias power supply current but nothing significant (40uA). Some small sparks on the way to this voltage, and I ramped up very slowly. The corona discharges seen before seem to be related to the resistor/varistor combos since there are none now that I have removed them. Will redesign and reinstall.

Attachment 1: spark_06032018.PNG
spark_06032018.PNG
Attachment 2: nospark_06032018_1410.PNG
nospark_06032018_1410.PNG
  644   Thursday, March 08, 2018, 17:47 Carla Babcock       Change of electronics on target and tube power supplies

The resistor/varistor combinations across the target + / -, tube + / - and target- / tube + have been remade and moved to the back of the power supplies to limit the corona discharges at higher voltages. Pictures attached.

Attachment 1: IMG_20180308_152637.jpg
IMG_20180308_152637.jpg
Attachment 2: IMG_20180308_152645.jpg
IMG_20180308_152645.jpg
Attachment 3: TargetNeg.jpg
TargetNeg.jpg
Attachment 4: TubeNegPos.jpg
TubeNegPos.jpg
  645   Friday, March 09, 2018, 08:57 Carla Babcock       HV test with electronics moved to rack

First attachment: BIAS/EE/EZL = 63.25/-1.5/31 So far no issues.

Second attachment: BIAS/EE/EZL = 64.25/-1.5/32 Slight spark - bias current jumped from 40uA to 88uA and vacuum jumped from 2e-7 to 2e-6... Steerers went off.

Third attachment: BIAS/EE/EZL = 65/-1.5/32  Some small signs of instability in the bias power supply

Fourth attachment :  BIAS/EE/EZL = 65/-1.5/32  Been running for 20 mins now. More variation on the bias current output than at lower voltages but not too bad

Attachment 1: 09032018_830.PNG
09032018_830.PNG
Attachment 2: 09032018_835.PNG
09032018_835.PNG
Attachment 3: 09032018_850.PNG
09032018_850.PNG
Attachment 4: 09032018_855.PNG
09032018_855.PNG
  646   Monday, March 12, 2018, 10:07 Aaron Schmidt       HV Test w-gas

Monday, March 12, 2018, 09:45: Gas lines opened. Leak rate set. Vacuum @ 1.16e-06T

Monday, March 12, 2018, 10:00: RGA on

Monday, March 12, 2018, 10:07: RGA off. Manually shut off power as well

  647   Monday, March 12, 2018, 10:44 Carla Babcock       Bringing up HV with gas on

Pressure:

Previous HV tests done at 2e-7 pressure.
Current pressure 1.1e-6 (see previous entry for RGA stats) - first attachment shows source gas setup. Argon, neon and He leaks all on.

 

Ramping up:

  • Second attachment - bias at 50kV
  • Third attachment - bias at 60kV
  • Fourth attachment - bias at 65kV

Pressure has been slowly falling since we started this test - now down to 8.7e-7

 

Spark after 10 mins, see attachment 5. Very slight vacuum jump (8.5e-7 -> 1.2e-6) and bias current jump (36uA -> 113uA). Tripped TP6 and the steerers, as usual. Bias current read back more erratic afterwards (see sixth attachment).

System has been stable for 20mins, though current on bias is still more erratic than before the spark. Increasing He leak rate from 7 to 7.06 to bring vacuum back up to 2e-6 (see attachment 7). No effect from increased pressure.


Tuesday, March 13, 2018, 05:52: Power off.

Tuesday, March 13, 2018, 05:56: Waterlines purged

Tuesday, March 13, 2018, 05:57: Ion gauge, Turbos off.

Attachment 1: sourcegascontrol_12032018.PNG
sourcegascontrol_12032018.PNG
Attachment 2: striptool_12032018.PNG
striptool_12032018.PNG
Attachment 3: striptool_12032018_1042.PNG
striptool_12032018_1042.PNG
Attachment 4: striptool_12032018_1050.PNG
striptool_12032018_1050.PNG
Attachment 5: spark_12032018_1058.PNG
spark_12032018_1058.PNG
Attachment 6: biascurrent_12032018_1104.PNG
biascurrent_12032018_1104.PNG
Attachment 7: striptool_12032018_1126.PNG
striptool_12032018_1126.PNG
Attachment 8: 2018_HV_test_w-gas.docx
  650   Tuesday, March 20, 2018, 09:14 Aaron Schmidt      Problems/SolutionsOptics issue

Tuesday, March 20, 2018, 09:11: TMS:Q5 & TMS:Q2 controllers require repair. Unable to hold a negative voltage.

+ @ 680V

- @ 0V (Should be 680V as well)

Kyle L. & Rod N notified.

 

Tuesday, March 20, 2018, 12:58: The controller was fixed.

  652   Thursday, March 29, 2018, 10:58 Carla Babcock        

Started with Anode at 25V and coil at 0A, bias at 30kV. (attachment 1)

Ramped coil to 60A (0.4V) (attachment 2)

Ramped bias to 51kV, but then TP6 turned off and there was a momentary 0.2A decrease in the TGHT current. No spike in BIAS current seen, maybe TP6 is turning off for another reason? (attachment 3)

At 57kV, a small spark, heard outside the vacuum, sounding like it comes somewhere near the blue racks which hold the power supplies. It has sounded like that to me before. Did not turn anything off but bias current spiked from 110uA to 280uA. (attachment 4)

At 57.5kV another spark, taking down TP1B and TP6, as well as the CB1 steerers and TPS:Q1/2. TGHT current dropped momentarily from 581A to 240A, or so says EPICS. Maybe just a communications effect? Voltage for TBHT also dropped but nothing seen on TBHT. Coil current and voltage also showed small effects. (attachment 5)

After 10mins at 60kV, spike in bias current with slight spike in EE current but no other effects.

After 20mins everything has been stable, will turn the bias back to 30kV. As I turn the bias voltage down, the EE current ramps up. No change to EE voltage... (attachment 6)

Attachment 1: FEBIADsource_29032018_908.PNG
FEBIADsource_29032018_908.PNG
Attachment 2: FEBIAD_striptool_29032018.PNG
FEBIAD_striptool_29032018.PNG
Attachment 3: spark_29032018_1030.PNG
spark_29032018_1030.PNG
Attachment 4: spark_29032018_1054.PNG
spark_29032018_1054.PNG
Attachment 5: spark_29032018_1100.PNG
spark_29032018_1100.PNG
Attachment 6: EEbehaviour_29032018_1145.PNG
EEbehaviour_29032018_1145.PNG
  653   Wednesday, April 11, 2018, 10:19 Aaron Schmidt       Pump down empty chamber

Wednesday, April 11, 2018, 10:19: Roughing

  655   Tuesday, April 17, 2018, 11:02 Aaron Schmidt      DoneRoughing pump issue.

Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.

TSG:CG1A @ 1.515T

TSG:CG1B @ 1.529T.

Tuesday, April 17, 2018, 11:02: TSG:PV1 Closed. Roughing pump off.

Vacuum group notified.


Wednesday, April 18, 2018: Replace pump & adapters. Clean.

Wednesday, April 18, 2018, 08:45: Start TSG:RP1 and open PV1, BV1A  & BV1B

Wednesday, April 18, 2018, 08:55: exhaust pipe/mesh cleared out back

Wednesday, April 18, 2018, 08:57: Turbo pumps on.

RP status ok.


Thursday, April 19, 2018, 08:30: waterlines opened. No response on RGA. Vacuum @ 3.42e-07T

  656   Thursday, April 19, 2018, 12:55 Fernando Maldonado      DoneRe-wiring Anode PS

Thursday, April 19, 2018, 12:52: Pin J1 was reconnected into the anode power supply. All jumpers were put back to remote control.

NOTE: the cable EXTLKT is still not connected. I will ask Carla about this one.

Thursday, April 19, 2018, 18:00: Cable EXTLKT connected.

Thursday, April 19, 2018, 18:12  When turning the transformer on, the Anode PS was not turned on. Neither the TGHT.

Thursday, April 19, 2018, 18:30: I turned off everything. Will check tomorrow with someone. 


Friday, April 20, 2018, 11:01 : Issue fixed. I've attached a picture of the jumpers connection for future references


 

 

Attachment 1: 20180420_104954.jpg
20180420_104954.jpg
  657   Friday, April 20, 2018, 13:20 Carla Babcock      DoneBIAS* fan sounds like it is dying

The fan in the EZL power supply is making a terrible noise - keep an eye on it, it sounds like it might give up soon.


Monday, April 23, 2018, 10:47: The back panel was opened. Original entry stated EZL power supply issue. Corrected to BIAS PS. High voltage group notified. Fan replacement required.


Monday, May 14, 2018, 13:20: BIAS fans, external an internal were replaced. Re-installed @ TS.

Monday, May 14, 2018, 13:26: BIAS ramped up to 10 kV. Response ok on epics and locally on the PS. No odd noise on the fans either. The issue appears to be fixed.

  661   Tuesday, May 22, 2018, 08:48 Anders Mjos      Problems/SolutionsTSG:TP1A not running

Pump found off on Tuesday morning.

Tuesday, May 22, 2018, 08:40: Starting TP1A

Tuesday, May 22, 2018, 08:47: TP1A at speed


Tuesday, May 22, 2018, 16:33: Source and optics off


Wednesday, May 23, 2018, 08:30: Stopped TP

Wednesday, May 23, 2018, 14:10: Water purged

  662   Thursday, May 24, 2018, 08:38 Anders Mjos      Problems/SolutionsVenting beamline for IG6 replacement

Thursday, May 24, 2018, 08:38: TPs stopped

Thursday, May 24, 2018, 09:18: Venting

Thursday, May 24, 2018, 14:30: IG6 replaced (second attempt) by Anthony. System pumping down

  663   Thursday, May 24, 2018, 15:28 Anders Mjos      Problems/SolutionsReconfigured FEBIAD coil for testing new source tray

Thursday, May 24, 2018: Configured coil to be (-) E&F, (+) G&H. Water should be supplied to both terminals in either configuration.

  665   Monday, June 04, 2018, 16:02 Anders Mjos      Problems/SolutionsMB1 timeout

Mass separator magnet timed out. Tried reconfigure. Called Kyle from controls who power cycled the CANbus card. This resolved the issue


(From the Source tray swap out.) - AS

Tuesday, June 05, 2018, 11:25: BIAS / EZL / EE @ 52 / 24 / 2.8 kV. SPARK *knocked out optics, magnet & Turbo TMS:TP6. IV4 closed/opened/reset. TP6/optics restarted. Magnet still off.

Complete failure of the communications with the magnet.


Wednesday, June 06, 2018, 13:40: Canbus contoller was swapped by Kyle L from Controls group. The old card was dead and replaced with a new one. The magnet is back and running.

  666   Wednesday, June 06, 2018, 14:01 Aaron Schmidt      Problems/SolutionsEmittance scanner (E-rig) communication issues.

Wednesday, June 06, 2018, 13:50:

It was noted yesterday during the TM2 Source HV tests that the E-rig was not running accordingly through the beam.

Upon turning on the PS, there a 45 second or so delay before the needle drops to the right at +500V and the PS no longer responds. (similar issue in August 2016)


Wednesday, June 06, 2018, 14:20: Soft reboot on Emittance rig communication. (Reboot IOC - Kyle LeBlanc)

Wednesday, June 06, 2018, 14:30: Calibrate

test scan & park

Reference parameters. Dac in bottom right corner to control PS.

Enter: 100 on Dac -- Reads 100 - On PS

Enter: 200 on Dac -- Reads 200 - On PS

Enter: 0 on Dac -- Reads 0 - On PS

Enter: -200 on Dac -- Reads -200 - On PS

The reboot fixed the erig/scanner.

  667   Thursday, June 07, 2018, 09:21 Aaron Schmidt      Problems/SolutionsPump down empty chamber. Anode check

TM2 Source tray still in.

Thursday, June 07, 2018, 09:20: Roughing.

Thursday, June 07, 2018, 12:42: Turbo pumps started.


Friday, June 08, 2018, 08:00: Anode run to 15 A. Short still apparent.

Friday, June 08, 2018, 08:12: Ion gauge, Turbos off.

Friday, June 08, 2018, 08:55: Venting.

Friday, June 08, 2018, 09:45: Anode connection investigated. Short found on the bracket once the anode wire was disconnected from the back screw (Picture)

Friday, June 08, 2018, 10:00: Removed 9-pin bracket. (Top connector left connected to TS. (Picture)

New Anode 9-pin connection/wire to be installed on the bracket. Test in the cold lab.

Friday, June 08, 2018, 10:12: Roughing.

Friday, June 08, 2018, 11:14: Turbo pumps started.

Friday, June 08, 2018, 12:31: Ion gauge on.


Tuesday, June 12, 2018, 06:18: Ion gauge & Turbo pumps off.

Tuesday, June 12, 2018, 07:40: Venting.

Attachment 1: 20180608_100402.jpg
20180608_100402.jpg
Attachment 2: 20180608_100835.jpg
20180608_100835.jpg
Attachment 3: 20180608_100840.jpg
20180608_100840.jpg
Attachment 4: 20180613_080550.jpg
20180613_080550.jpg
Attachment 5: 20180613_080605.jpg
20180613_080605.jpg
  668   Tuesday, June 12, 2018, 11:38 Aaron Schmidt      In progressSource Tray re-installation

Re-installation of the ISAC Test Stand Source tray. The TM2 ST was removed.

Tuesday, June 12, 2018, 10:15: Disconnect Optics Tray. Set blocks.

-Continue with removal of TM2 Tray

Tuesday, June 12, 2018, 10:56: TM2 Tray Removed.

-Continue with installation of ISAC Test Stand Source Tray. Optics reconnect.

Tuesday, June 12, 2018, 11:25: Open line FS#8. No visible leaks found.

Tuesday, June 12, 2018, 11:37: Connect Source tray, optics tray, gas line, etc. Complete.

Tuesday, June 12, 2018, 14:37: Roughing.


Wednesday, June 13, 2018, 06:32: Turbo pumps on.

Wednesday, June 13, 2018, 06:37; Ion Gauge on.


He Leak TEST #1:

Cold Lab Leak detector. RGA unavailable.

Monday, June 18, 2018, 11:00  Vacuum @ 2.15e-06T

LD Base line before opening valve to turbo pumps: 0.0 to 5.6 e-11 atm-cc/sec

LD baseline after opening valve to turbo pumps: 8.e-10 atm-cc/sec

Full open base after five minutes:

Vacuum @ 2.18e-06T.

LD:  8.2e-09 atm-cc/sec

Monday, June 18, 2018, 11:05: Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes

Vacuum @ 2.15e-06T .

LD: 6.6e-09 atm-cc/sec. Purge and close FS#2.

Monday, June 18, 2018, 11:10: Open line FS#3 . Pressurize to 30 PSI.

Drop followed by Major SPIKE into e-04 vacuum.

Vacuum @ 1.5e-05T.

LD:  1.6e-04 atm-cc/sec. Confirmed leak on FS#3

Monday, June 18, 2018, 11:26: Continued Vacuum instability.

Halt leak test!

Monday, June 18, 2018, 11:30: Close port to LD.

Monday, June 18, 2018, 11:34: Vent and shut down LD. Ion gauge and turbos off.


Tuesday, June 19, 2018, 06:40: Venting.

C-seals replaced with O-rings on line FS#3 (E)(G)

Tuesday, June 19, 2018, 08:36: Re-install RGA

Continue C-Seal replacement. (F)(H)(K).

Tuesday, June 19, 2018, 09:00: Roughing.

Tuesday, June 19, 2018, 10:15: Turbo pumps on.

Tuesday, June 19, 2018, 10:19: Ion gauge on.

Tuesday, June 19, 2018, 10:28: RGA operational.


Thursday, June 21, 2018, 14:28 Vacuum @ 4.95e-07T

LD Base line before opening valve to turbo pumps: 0.0 e-11 atm-cc/sec

LD baseline after opening valve to turbo pumps: 3.3e-10 atm-cc/sec

Full open base after five minutes:

Vacuum @ 4.95e-07T. RGA ok

LD:  3.3e-08 atm-cc/sec

Thursday, June 21, 2018, 14:33 : Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes

Vacuum @ 4.76e-07T . RGA ok

LD: 3.3e-08 atm-cc/sec. Purge and close FS#4.

Thursday, June 21, 2018, 14:38: Open line FS#5 . Pressurize to 30 PSI.

Vacuum @ 4.76e-07T. RGA ok

LD:  3.6e-08 atm-cc/sec. 

Thursday, June 21, 2018, 14:43: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes

Vacuum @ 4.95e-07T . RGA ok

LD: 3.7e-08 atm-cc/sec.

Purge and close FS#3.

Thursday, June 21, 2018, 14:48: Open line all lines . Pressurize to 30 PSI. Record after 5 minutes

Vacuum @ 4.95e-07T . RGA ok

LD: 4.0e-08 atm-cc/sec.

Thursday, June 21, 2018, 14:53: Close port to LD.

Vent and shut down LD.

Purge He, Open with water.

Thursday, June 21, 2018, 14:58: Vacuum @ 5.04e-07T . RGA ok.

Thursday, June 21, 2018, 15:00: Power/sources on. Vacuum @ 5.04e-07T . RGA ok.


See Target  Heating - TS Elog 670.*

Monday, June 25, 2018, 09:10: Auto-cooling at 2A/min - AS.

Attachment 1: TS_Source_Tray_re-installed_2018_-_(Leak_found).docx
ELOG V2.9.2-2455