Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 42 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  224   Friday, October 26, 2012, 08:29 Anders MjosTiC#3LP-SISITWTM1  DoneTarget ready for conditioning

    

       
            
  
  223   Thursday, October 25, 2012, 13:02 Anders MjosTiC#3LP-SISITWTM1  In progressPumping downThursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19
: Turbos on
  
  222   Thursday, October 25, 2012, 11:13 Anders MjosTestHP-FEBIAD    In progressVenting chamber for installation of TiC#3Thursday, October 25, 2012, 11:11: Vacuum
at 1.3E-7 T
Thursday, October 25, 2012, 11:12:
  
  221   Wednesday, October 10, 2012, 17:35 Aurelia Laxdal      Failedfound teststand tripped off

    

       
            
  
  220   Wednesday, October 10, 2012, 10:47 Friedhelm Ames      Failedfound teststand tripped offturbo pumps in source section and all ion
gauges off all optics and heaters tripped.
Reason unknown.
  
  219   Wednesday, October 03, 2012, 13:50 Aurelia Laxdal HP-FEBIAD    In progressTraining updatesOn Monday October 1, the HP-FEBIAD source
was turned ON again, to complete the operator
training. The last session was yesterday
  
  218   Monday, October 01, 2012, 10:41 Aurelia Laxdal HP-FEBIAD    In progressSiC-HP-FEBIAD for operator training - Source ON Turned the source back ON. Heaters are
ramping up.
  
  217   Friday, September 28, 2012, 09:59 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training - Source OffChecked with ISAC Ops this morning and
they are not available for FEBIAD training.
Turned off the source until next week.
  
  216   Thursday, September 27, 2012, 12:27 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator trainingThe source was used yesterday for operator
training.
Today, I found the source off: the
  
  215   Tuesday, September 25, 2012, 16:10 Aurelia Laxdal       Conditioning - SiC-HP-FEBIAD for operator trainingDid the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A
  
  214   Tuesday, September 25, 2012, 13:25 Anders Mjos      DoneStarted turbos after replaced roughing pump    
  213   Tuesday, September 25, 2012, 13:05 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuse

    

       
            
  
  212   Monday, September 24, 2012, 15:25 Anders Mjos      DoneTMS RP and TP started    
  211   Monday, September 24, 2012, 13:52 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuseSee e-fault 6329
Tried to start the pump from another
power outlet with Edi. No luck. Pump will
  
  210   Monday, September 24, 2012, 10:31 Anders Mjos      Problems/SolutionsEPICS whiteout Test stand was off this morning and
EPICS controls in "white-out".
Controls is looking into it.
  
  209   Friday, September 21, 2012, 08:27 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A/B fluctuatingBacking pressures TSG:CG1A/B are fluctuating
between 0.02 and 0.05 since Sept 17th at
~17h. Expected values <0.01.
  
  208   Friday, September 21, 2012, 08:20 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

    

       
            
  
  207   Thursday, September 20, 2012, 15:52 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator trainingThursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54:
Aborting. VCR for gas line not connected.
  
  206   Thursday, September 20, 2012, 14:24 Anders Mjos      In progressVenting - installation of FEBIAD test target for operator trainingThursday, September 20, 2012, 14:24: Turbos
off
Thursday, September 20, 2012, 15:20:
  
  205   Friday, September 14, 2012, 16:33 Anders Mjos      In progressPumping down empty chamberFriday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57:
Starting turbos
  
ELOG V2.9.2-2455