Entry  Friday, June 29, 2012, 13:39, Friedhelm Ames, , , , , , , , start mass scan 

start mass scan to do new mass calibration

Entry  Friday, June 29, 2012, 15:02, Friedhelm Ames, , , , , , , , mass scan finished mass_spectrum_2012_06_29.PNG

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

Entry  Friday, June 29, 2012, 15:03, Friedhelm Ames, , , , , , , , start ramping down heater 
 
    Reply  Friday, June 29, 2012, 16:39, Friedhelm Ames, , , , , , , , mass scan finished 

Friedhelm Ames wrote:

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

 new parameters for mass scan program after fit of mass scan

CONST11 = -4.13

CONST22 = 0.09595

Entry  Friday, July 06, 2012, 11:04, Friedhelm Ames, , , , , , , , source tripped off over night 

A big vacuum excursion tripped the source off at about 1am. The vacuum did not fully recover afterwards only down to about 1.3e-6T. Ne leak has been closed and vacuum went down to 6e-7T within a few minutes. After the trip the current of the magnet stayed constant. Fluctuations may have been caused by high voltage sparks.

Entry  Friday, July 06, 2012, 11:05, Friedhelm Ames, , , , , , , , start source again 

heater ramping up again with Ne leak closed.

Entry  Friday, July 06, 2012, 11:18, Friedhelm Ames, , , , , , , , TSG:TP1B off source off again. 

turbo pump TSG:TP1B has tripped off. Cannot be restarted. Fault report to vacuum. Everything switched off again

 

Entry  Monday, July 09, 2012, 11:14, Aurelia Laxdal, , , , , , , , Test Stand status 

Restarted the PC at the Test Stand.

Restarted the Archivers; currently pumping down the separator area.

Entry  Thursday, July 12, 2012, 15:49, Anders Mjos, , , , , , , , test stand vented for TP1A replacement 

see e-fault 6142

Entry  Thursday, August 09, 2012, 13:08, Pierre Bricault, , , , , , , , Test FEBIAD 

Waiting Rick for the fitting on the vacuum pump.

Entry  Friday, August 10, 2012, 14:08, Rick Maharaj, , , , , , , , Gas line pump 

Gas line vacuum pump reinstalled after fitting was modified to receive a standard swagelok connector. The vacuum line was plumbed using 1/4" copper tube (not Stainless) for the the ability to flex and manipulate the line for pump removal and and insertion.

Entry  Friday, August 10, 2012, 15:29, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, , finishing the gas installation and its pump 

1524H Start small pump.

1529H stop the pump.

 

Entry  Friday, August 10, 2012, 15:57, Pierre Bricault, , , , , , , ,  

Test high voltage to 30 kV ok

Test gas valve open at 6.1 V

Test Ne leak ok

Will run test from home.

 

Entry  Saturday, August 11, 2012, 16:18, Pierre Bricault, , , , , , , , Test FEBIAD anode biased at 120 V 

The ramp up finished.

I have 3.35E-6 Amp out of the source on FC0.

Vacuum  4.3 E-7 T increase Coil current to 40 A. No effect on vac.

Increase coil to 50 A. Vacuum still good.

I will continue from home..

Entry  Thursday, September 06, 2012, 09:23, Friedhelm Ames, NB#7, , , , , , ,  

start high voltage and heaters

Entry  Thursday, September 13, 2012, 13:05, Friedhelm Ames, Nb#7, LP-SIS, , , , , , heater ramping up started 
 
Entry  Tuesday, September 25, 2012, 16:10, Aurelia Laxdal, , , , , , , , Conditioning - SiC-HP-FEBIAD for operator training 

Did the HV conditioning up to 30kV.

Started the heaters conditioning:

for TSH:TGHT up to 580A

for TSH:TBHT up to 230A

Entry  Thursday, November 01, 2012, 11:16, Aurelia Laxdal, TiC#3, LP-SIS, ITW, TM1, , , , TiC#3-LP-SIS Startup 

Did the HV conditioning for the TiC#3 up to 30kV.

Heaters ramp up in progress.

Entry  Thursday, November 01, 2012, 14:57, Aurelia Laxdal, TiC#3, LP-SIS, ITW, TM1, , , , TSH:TGHT readback stopped at 264.5A (for a higher setpoint) 

The TSH:TGHT stopped at 263.7A, but the setpoint is still ramping (now at 421A). The voltage is set correctly: have 6.238V setpoint and 4.386V readback. The reading on the Power Supply shows 418A. Through the window the target assembly looks at high temperature. The readback on Epics seems stuck. E-Fault for Controls 6389

Entry  Friday, November 02, 2012, 14:20, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , , Mass scan done 

Mass scan file: plotdump-local-clean.txt Nov2 12 13-15-59.txt

The scan was taken at TGHT=573A (read from the PS panel) .

The TBHT = 230A