Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 41 of 53  Not logged in ELOG logo
Entry  Friday, June 29, 2012, 15:03, Friedhelm Ames, , , , , , , , start ramping down heater 
 
    Reply  Friday, June 29, 2012, 16:39, Friedhelm Ames, , , , , , , , mass scan finished 

Friedhelm Ames wrote:

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

 new parameters for mass scan program after fit of mass scan

CONST11 = -4.13

CONST22 = 0.09595

Entry  Friday, July 06, 2012, 11:04, Friedhelm Ames, , , , , , , , source tripped off over night 

A big vacuum excursion tripped the source off at about 1am. The vacuum did not fully recover afterwards only down to about 1.3e-6T. Ne leak has been closed and vacuum went down to 6e-7T within a few minutes. After the trip the current of the magnet stayed constant. Fluctuations may have been caused by high voltage sparks.

Entry  Friday, July 06, 2012, 11:05, Friedhelm Ames, , , , , , , , start source again 

heater ramping up again with Ne leak closed.

Entry  Friday, July 06, 2012, 11:18, Friedhelm Ames, , , , , , , , TSG:TP1B off source off again. 

turbo pump TSG:TP1B has tripped off. Cannot be restarted. Fault report to vacuum. Everything switched off again

 

Entry  Monday, July 09, 2012, 11:14, Aurelia Laxdal, , , , , , , , Test Stand status 

Restarted the PC at the Test Stand.

Restarted the Archivers; currently pumping down the separator area.

Entry  Thursday, July 12, 2012, 15:49, Anders Mjos, , , , , , , , test stand vented for TP1A replacement 

see e-fault 6142

Entry  Thursday, August 09, 2012, 13:08, Pierre Bricault, , , , , , , , Test FEBIAD 

Waiting Rick for the fitting on the vacuum pump.

Entry  Friday, August 10, 2012, 14:08, Rick Maharaj, , , , , , , , Gas line pump 

Gas line vacuum pump reinstalled after fitting was modified to receive a standard swagelok connector. The vacuum line was plumbed using 1/4" copper tube (not Stainless) for the the ability to flex and manipulate the line for pump removal and and insertion.

Entry  Friday, August 10, 2012, 15:29, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, , finishing the gas installation and its pump 

1524H Start small pump.

1529H stop the pump.

 

Entry  Friday, August 10, 2012, 15:57, Pierre Bricault, , , , , , , ,  

Test high voltage to 30 kV ok

Test gas valve open at 6.1 V

Test Ne leak ok

Will run test from home.

 

Entry  Saturday, August 11, 2012, 16:18, Pierre Bricault, , , , , , , , Test FEBIAD anode biased at 120 V 

The ramp up finished.

I have 3.35E-6 Amp out of the source on FC0.

Vacuum  4.3 E-7 T increase Coil current to 40 A. No effect on vac.

Increase coil to 50 A. Vacuum still good.

I will continue from home..

Entry  Thursday, September 06, 2012, 09:23, Friedhelm Ames, NB#7, , , , , , ,  

start high voltage and heaters

Entry  Thursday, September 13, 2012, 13:05, Friedhelm Ames, Nb#7, LP-SIS, , , , , , heater ramping up started 
 
Entry  Tuesday, September 25, 2012, 16:10, Aurelia Laxdal, , , , , , , , Conditioning - SiC-HP-FEBIAD for operator training 

Did the HV conditioning up to 30kV.

Started the heaters conditioning:

for TSH:TGHT up to 580A

for TSH:TBHT up to 230A

Entry  Thursday, November 01, 2012, 11:16, Aurelia Laxdal, TiC#3, LP-SIS, ITW, TM1, , , , TiC#3-LP-SIS Startup 

Did the HV conditioning for the TiC#3 up to 30kV.

Heaters ramp up in progress.

Entry  Thursday, November 01, 2012, 14:57, Aurelia Laxdal, TiC#3, LP-SIS, ITW, TM1, , , , TSH:TGHT readback stopped at 264.5A (for a higher setpoint) 

The TSH:TGHT stopped at 263.7A, but the setpoint is still ramping (now at 421A). The voltage is set correctly: have 6.238V setpoint and 4.386V readback. The reading on the Power Supply shows 418A. Through the window the target assembly looks at high temperature. The readback on Epics seems stuck. E-Fault for Controls 6389

Entry  Friday, November 02, 2012, 14:20, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , , Mass scan done 

Mass scan file: plotdump-local-clean.txt Nov2 12 13-15-59.txt

The scan was taken at TGHT=573A (read from the PS panel) .

The TBHT = 230A

Entry  Monday, November 19, 2012, 10:20, Aurelia Laxdal, Test-SiC, HP-FEBIAD, , , , , , Preparations for E-Fault#6389 investigations 

Prepared the Test Stand for Controls to investigate E-Fault#6389.


Evgeniy increased the current limit on the power supply TSH:TGHT from 2 rotations to 7 rotations, after talking to Ray Dube.

I turned on the HV at 30kV and started the Auto-ramping.

Entry  Thursday, November 22, 2012, 12:52, Aurelia Laxdal, Test-SiC, HP-FEBIAD, , , , , , E-Fault#6389 re-directed to PS 

Evgeniy and Kazuya investigated the problem with TSH:TGHT readbacks and they came to the conclusion that the PS is faulty, and the PLC reads correctly the signal sent by the PS.  Kazuya is redirecting the E-Fault from Controls to PS.

Ray Dube estimated few weeks (4-6) to send the PS offsite for repairs. This needs to be scheduled. For the time being, one can use the Test Stand with the PS setpoints, displayed on its front panel, as a reference.

ELOG V2.9.2-2455