Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 41 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject
  634   Tuesday, February 13, 2018, 16:47 Carla Babcock       Ramping to 63kV - some sparks

Sparks at 62kV on the bias.

Turned it down, turned it back up and got a spark at 60kV.

Now up to 63kV, no sparks so far (5 mins). Left EE @ -3100V and EZL @ 28.5kV

There is the sound of a low level continuous discharge, like HV power lines, and a very strong ozone smell coming from the HV duct that sticks into the cage and carries the cables from the HV rack. Also seems to be present near the EE insulating standoff. Can't see anything though. Maybe just moisture in the air? Starts at 55kV on the bias, does not change with EE voltage.

Turned EZL up to 29kV, bias stable at 63kV for 11mins.

Sparks at 63.6kV in the EE spark gap, EE @ -3.1kV.

  635   Friday, February 16, 2018, 15:21 Carla Babcock       Cleaned HV cage - trying bias again

I vacuumed inside the HV cage, though it has many small areas that are difficult to access so I am not sure how great a job I did.

Turned the bias up and again at 55kV I hear small sparks near the end of the HV duct that brings the cables from the rack. Cannot see anything. If it is really sparking where it sounds like sparking, it must be from the edge of the duct to the faraday cage.

Changing the EZL voltage and the EE voltage has no effect on where it starts sparking.

  636   Monday, February 19, 2018, 08:30 Carla Babcock       TMSTP6 off

Found TMSTP6 off, restarted it, seems fine now (drawing 0.8A)

  637   Monday, February 19, 2018, 14:01 Carla Babcock       Attempts to get to higher voltages, summarized.

The test stand holds up to 63kV, however at voltages over 54kV there are small discharges, rising to a continuous level around 60kV. The best guess right now is that these are coronal discharges coming from the end of the HV duct to the faraday cage. The only way to fix this would be to round out the edges of the duct, or to move the duct farther away. Since I have heard small discharges in other places, we may need to make a variety of modifications. Things that have had no effect:

1. Changing the EZL/EE voltages - break down is happening only between HV bias and ground

2. Cleaning the faraday cage

3. Locating sparks with a thermal camera

4. Conditioning - break down always happens at the same point

  638   Tuesday, February 20, 2018, 09:04 Carla Babcock       Trying HV with rubber corona shield

Tuesday, February 20, 2018, 09:01: Sparks at 62.5kV after a couple minutes. Sounds like they were in the EE spark gap but don't appear on the EE read current. Ozone smell around 61kV, so there are still some discharges.

 

Turned back up to 62.5kV but no sparks. Put it up to 63.5kV and there was a spark, but not in the EE spark gap as expected. Took down TP1B but everything is back up and seems fine.

  639   Friday, February 23, 2018, 08:50 Aaron Schmidt       New Al Corona

Friday, February 23, 2018, 08:50

Friday, February 23, 2018, 08:53: BIAS / EZL / EE @ 62.5 / 29 / -1 kV

Friday, February 23, 2018, 08:56: Spark* Turbo pump TMS:TP6 restarted,

 

Friday, February 23, 2018, 09:13: Bias sitting at 61kV for about 15mins now. Still corona discharges from the area of the EE, but the area of the duct seems fine.

  640   Monday, February 26, 2018, 09:13 Carla Babcock       Running list of changes to the ISAC test stand for >60kV operation

1. Al corona shield installed over end of the HV duct to suppress discharges from the sharp edge of the duct.

2. Some moving and shortening of cables to keep them from running close to different voltages.

3. Changed the angle bracket on the 3M bias-EE resistor chain to a plate, same position.

4. Moved the 164K EE resistor chain to sit flat against feedthrough K.

5. Moved the bias-EE spark gap to sit flat against the back of feedthrough K, required tapping a hole in the back of the copper clamp.

6. Cap and top of rack vacuumed.

7. Piece of shielding removed from top of HV rack

Attachment 1: Corona_1.jpg
Corona_1.jpg
Attachment 2: Corona_2.jpg
Corona_2.jpg
Attachment 3: Brackets_and_Boards_before_1.jpg
Brackets_and_Boards_before_1.jpg
Attachment 4: Brackets_and_Boards_before_2.jpg
Brackets_and_Boards_before_2.jpg
Attachment 5: Brackets_and_Boards_After_1.jpg
Brackets_and_Boards_After_1.jpg
Attachment 6: Brackets_and_Boards_After_2.jpg
Brackets_and_Boards_After_2.jpg
  641   Wednesday, February 28, 2018, 11:50 Aaron Schmidt       HV Test Np

New parts installed. Corona Shield, brackets, and board/spark gap orientation.

Wednesday, February 28, 2018, 11:48: Power on. Ready to test

Wednesday, February 28, 2018, 14:00: BIAS / EZL / EE @ 30 / 13 / 1.5 kV

Wednesday, February 28, 2018, 14:06: BIAS / EZL / EE @ 40 / 17 / 2.0 kV

Wednesday, February 28, 2018, 14:11: BIAS / EZL / EE @ 55 / 24 / 2.8 kV

Wednesday, February 28, 2018, 14:16: BIAS / EZL / EE @ 60 / 28 / 3.1 kV

Wednesday, February 28, 2018, 14:18: BIAS / EZL / EE @ 62 / 30 / 3.2 kV

Wednesday, February 28, 2018, 14:21: BIAS / EZL / EE @ 63 / 31 / 3.2 kV

Wednesday, February 28, 2018, 14:26: BIAS / EZL / EE @ 65 / 32.5 / 3.2 kV

Wednesday, February 28, 2018, 14:32: BIAS / EZL / EE @ 66 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:35: BIAS / EZL / EE @ 66.5 / 33.5 / 3.3 kV ***2 sparks***

Wednesday, February 28, 2018, 14:37: BIAS / EZL / EE @ 66 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:41: BIAS / EZL / EE @ 66.5 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:44: BIAS / EZL / EE @ 67 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:47: BIAS / EZL / EE @ 68 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:49: BIAS / EZL / EE @ 68.75 / 33 / 3.3 kV ***Spark***

Wednesday, February 28, 2018, 14:51: BIAS / EZL / EE @ 68 / 33 / 3.3 kV

Wednesday, February 28, 2018, 14:57: *** 2 sparks ***


The BIAS was pushed to 69 kV however the resulting sparks shut down the communications with the test stand computer.

RPM0B was put into a continuous running cycle and had to be shut off manually.

The voltage was brought back down remotely via a separate computer. Turbo pump TMS : TP2 was also restarted.

Attachment 1: 2018_HV_test_Np.docx
  642   Thursday, March 01, 2018, 10:05 Carla Babcock       HV tests with corona discharge problems solved

Turning up bias, no corona discharge at 60kV but a spark at 61.5kV bias, 31kV EZL, -800V EE

Thursday, March 01, 2018, 10:26: BIAS / EZL / EE @ 65 / 32.5 / 3.2 kV

Thursday, March 01, 2018, 10:32: Spark* Knocked out turbo pump TMS : TP6 (Restarted) Communications restarted. RPM0A restarted.

Thursday, March 01, 2018, 10:44: BIAS / EZL / EE @ 61 / 30.5 / 3.1 kV

Attachment 1: 01032018_10am_61kVspark.PNG
01032018_10am_61kVspark.PNG
  643   Tuesday, March 06, 2018, 10:55 Carla Babcock       Trying HV without electronics

I have removed the resistor/varistor combinations that go between the poles of the target and tube heaters, and between those two supplies. I tested all the components to make sure they were still working after the sparks - for the record the varistors clamp at 23V, not 33V as implied by the schematic.

Tuesday, March 06, 2018, 10:48  BIAS/EE/EZL = 59.5/-1000/29.5  There was some kind of spark, the current on the bias supply went up to 400uA ( normally at 40 +/- 5 ) and the vacuum jumped a bit ( but still in the 10e-7 range ) but I didn't hear anything. It took out TP6 again. See first attachment.

Tuesday, March 06, 2018, 10:54  BIAS/EE/EZL = 60/-1/30

...

Problems

...

Tuesday, March 06, 2018, 12:00 BIAS/EE/EZL = 60/-1.5/29

Tuesday, March 06, 2018, 12:37 BIAS/EE/EZL = 62/-1.5/30

Tuesday, March 06, 2018, 14:11 BIAS/EE/EZL = 64/-1.5/31 No sparks but occasional ticking sounds from either the EZL or behind where the EE is... see second screenshot

Tuesday, March 06, 2018, 14:40 BIAS/EE/EZL = 65/-1.5/33

 

Test stand has been sitting at 65kV for about an hour now. Some small increases in bias power supply current but nothing significant (40uA). Some small sparks on the way to this voltage, and I ramped up very slowly. The corona discharges seen before seem to be related to the resistor/varistor combos since there are none now that I have removed them. Will redesign and reinstall.

Attachment 1: spark_06032018.PNG
spark_06032018.PNG
Attachment 2: nospark_06032018_1410.PNG
nospark_06032018_1410.PNG
  644   Thursday, March 08, 2018, 17:47 Carla Babcock       Change of electronics on target and tube power supplies

The resistor/varistor combinations across the target + / -, tube + / - and target- / tube + have been remade and moved to the back of the power supplies to limit the corona discharges at higher voltages. Pictures attached.

Attachment 1: IMG_20180308_152637.jpg
IMG_20180308_152637.jpg
Attachment 2: IMG_20180308_152645.jpg
IMG_20180308_152645.jpg
Attachment 3: TargetNeg.jpg
TargetNeg.jpg
Attachment 4: TubeNegPos.jpg
TubeNegPos.jpg
  645   Friday, March 09, 2018, 08:57 Carla Babcock       HV test with electronics moved to rack

First attachment: BIAS/EE/EZL = 63.25/-1.5/31 So far no issues.

Second attachment: BIAS/EE/EZL = 64.25/-1.5/32 Slight spark - bias current jumped from 40uA to 88uA and vacuum jumped from 2e-7 to 2e-6... Steerers went off.

Third attachment: BIAS/EE/EZL = 65/-1.5/32  Some small signs of instability in the bias power supply

Fourth attachment :  BIAS/EE/EZL = 65/-1.5/32  Been running for 20 mins now. More variation on the bias current output than at lower voltages but not too bad

Attachment 1: 09032018_830.PNG
09032018_830.PNG
Attachment 2: 09032018_835.PNG
09032018_835.PNG
Attachment 3: 09032018_850.PNG
09032018_850.PNG
Attachment 4: 09032018_855.PNG
09032018_855.PNG
  646   Monday, March 12, 2018, 10:07 Aaron Schmidt       HV Test w-gas

Monday, March 12, 2018, 09:45: Gas lines opened. Leak rate set. Vacuum @ 1.16e-06T

Monday, March 12, 2018, 10:00: RGA on

Monday, March 12, 2018, 10:07: RGA off. Manually shut off power as well

  647   Monday, March 12, 2018, 10:44 Carla Babcock       Bringing up HV with gas on

Pressure:

Previous HV tests done at 2e-7 pressure.
Current pressure 1.1e-6 (see previous entry for RGA stats) - first attachment shows source gas setup. Argon, neon and He leaks all on.

 

Ramping up:

  • Second attachment - bias at 50kV
  • Third attachment - bias at 60kV
  • Fourth attachment - bias at 65kV

Pressure has been slowly falling since we started this test - now down to 8.7e-7

 

Spark after 10 mins, see attachment 5. Very slight vacuum jump (8.5e-7 -> 1.2e-6) and bias current jump (36uA -> 113uA). Tripped TP6 and the steerers, as usual. Bias current read back more erratic afterwards (see sixth attachment).

System has been stable for 20mins, though current on bias is still more erratic than before the spark. Increasing He leak rate from 7 to 7.06 to bring vacuum back up to 2e-6 (see attachment 7). No effect from increased pressure.


Tuesday, March 13, 2018, 05:52: Power off.

Tuesday, March 13, 2018, 05:56: Waterlines purged

Tuesday, March 13, 2018, 05:57: Ion gauge, Turbos off.

Attachment 1: sourcegascontrol_12032018.PNG
sourcegascontrol_12032018.PNG
Attachment 2: striptool_12032018.PNG
striptool_12032018.PNG
Attachment 3: striptool_12032018_1042.PNG
striptool_12032018_1042.PNG
Attachment 4: striptool_12032018_1050.PNG
striptool_12032018_1050.PNG
Attachment 5: spark_12032018_1058.PNG
spark_12032018_1058.PNG
Attachment 6: biascurrent_12032018_1104.PNG
biascurrent_12032018_1104.PNG
Attachment 7: striptool_12032018_1126.PNG
striptool_12032018_1126.PNG
Attachment 8: 2018_HV_test_w-gas.docx
  648   Tuesday, March 13, 2018, 06:00 Aaron SchmidtUC#22LP-SISITETM4  In progressConditioning Heat Shield for UC#22

Tuesday, March 13, 2018, 08:50: Roughing.

Tuesday, March 13, 2018, 09:10: Turbo Pumps started.

Tuesday, March 13, 2018, 09:15: Ion gauge on.

Tuesday, March 13, 2018, 10:17: RGA started.

Tuesday, March 13, 2018, 13:15: Check Vacuum @ 6.56e-07T


Wednesday, March 14, 2018, 07:27: Waterlines opened. No response on RGA. Vacuum ok @ 2.69e-07T

Wednesday, March 14, 2018, 07:30: Power/sources on.

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 21.7 3.61
 TBHT 21.4 2.82
 COIL + EE 21.5 4.64
 TGHT  21.7 5.23

Wednesday, March 14, 2018, 07:35: Auto ramping TGHT to 580 A @ 2A per min.

Wednesday, March 14, 2018, 13:18: Vacuum ok @ 5.48e-07T

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 32.6 3.72
 TBHT 22.5 2.86
 COIL + EE 22.6 4.75
 TGHT  24.9 5.08

 Wednesday, March 14, 2018, 13:29: BIAS/EZL/EE to 30 / 13.5 / 1.5 kV.

BIAS current: 40uA

EZL current: 49uA

EE current: 518uA


Thursday, March 15, 2018, 08:00: Check, Vacuum @ 4.76e-07T

Thursday, March 15, 2018, 13:19: Check, Vacuum @ 4.65e-07T

Thursday, March 15, 2018, 15:13: Started cool down. Vacuum at 4.76e-7 by AM


Friday, March 16, 2018, 06:24: Power/sources off.

Friday, March 16, 2018, 06:27: Waterlines purged

Friday, March 16, 2018, 06:28: RGA, ion gauge, and turbos off.

Friday, March 16, 2018, 07:57: Venting.

 

  650   Tuesday, March 20, 2018, 09:14 Aaron Schmidt      Problems/SolutionsOptics issue

Tuesday, March 20, 2018, 09:11: TMS:Q5 & TMS:Q2 controllers require repair. Unable to hold a negative voltage.

+ @ 680V

- @ 0V (Should be 680V as well)

Kyle L. & Rod N notified.

 

Tuesday, March 20, 2018, 12:58: The controller was fixed.

  652   Thursday, March 29, 2018, 10:58 Carla Babcock        

Started with Anode at 25V and coil at 0A, bias at 30kV. (attachment 1)

Ramped coil to 60A (0.4V) (attachment 2)

Ramped bias to 51kV, but then TP6 turned off and there was a momentary 0.2A decrease in the TGHT current. No spike in BIAS current seen, maybe TP6 is turning off for another reason? (attachment 3)

At 57kV, a small spark, heard outside the vacuum, sounding like it comes somewhere near the blue racks which hold the power supplies. It has sounded like that to me before. Did not turn anything off but bias current spiked from 110uA to 280uA. (attachment 4)

At 57.5kV another spark, taking down TP1B and TP6, as well as the CB1 steerers and TPS:Q1/2. TGHT current dropped momentarily from 581A to 240A, or so says EPICS. Maybe just a communications effect? Voltage for TBHT also dropped but nothing seen on TBHT. Coil current and voltage also showed small effects. (attachment 5)

After 10mins at 60kV, spike in bias current with slight spike in EE current but no other effects.

After 20mins everything has been stable, will turn the bias back to 30kV. As I turn the bias voltage down, the EE current ramps up. No change to EE voltage... (attachment 6)

Attachment 1: FEBIADsource_29032018_908.PNG
FEBIADsource_29032018_908.PNG
Attachment 2: FEBIAD_striptool_29032018.PNG
FEBIAD_striptool_29032018.PNG
Attachment 3: spark_29032018_1030.PNG
spark_29032018_1030.PNG
Attachment 4: spark_29032018_1054.PNG
spark_29032018_1054.PNG
Attachment 5: spark_29032018_1100.PNG
spark_29032018_1100.PNG
Attachment 6: EEbehaviour_29032018_1145.PNG
EEbehaviour_29032018_1145.PNG
  653   Wednesday, April 11, 2018, 10:19 Aaron Schmidt       Pump down empty chamber

Wednesday, April 11, 2018, 10:19: Roughing

  654   Tuesday, April 17, 2018, 09:59 Aaron Schmidt LP-FEBIAD  41790-9  Test FEBIAD

New assembly & target. Same silver bolts.

Tuesday, April 17, 2018, 09:56: Roughing.

Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.

See* elog entry for roughing pump issue 04/17/2018


Wednesday, April 18, 2018, 08:57: Turbo pumps on.


Friday, April 20, 2018, 13:45: Power/sources on. RGA restarted

Friday, April 20, 2018, 13:46: IV4 Opened.

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.1 3.61
 TBHT 24.2 2.80
 COIL + EE 23.9 5.06
 TGHT  24.1 5.72

Friday, April 20, 2018, 13:50: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Friday, April 20, 2018, 13:56: BIAS / EZL / EE @ 30 / 13 / 1.5 kV . Spark @ Bias 28 kV knocked out RGA.

Friday, April 20, 2018, 13:59: RGA restarted.

Friday, April 20, 2018, 14:03: Optics on. Set

Friday, April 20, 2018, 14:40: Auto cooling TGHT / TBHT from 97 A @ 4A per min. Odd noise on (BIAS*) PS

Friday, April 20, 2018, 14:44: BIAS / EZL / EE @ 0 / 0 / 0 kV . Sources being turned off except TBHT and TGHT.


Monday, April 23, 2018, 10:46: FEBIAD TEST halted. See BIAS PS issue.


Tuesday, April 24, 2018, 10:46: Power off.

Tuesday, April 24, 2018, 10:48: RGA off.

Tuesday, April 24, 2018, 10:49: Ion gauge TSG:IG1 & Evap side turbos off,

Tuesday, April 24, 2018, 10:50: Ion gauge TMS:IG6 & beam side turbos off.

Tuesday, April 24, 2018, 10:54: Waterlines purged.

 

  655   Tuesday, April 17, 2018, 11:02 Aaron Schmidt      DoneRoughing pump issue.

Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.

TSG:CG1A @ 1.515T

TSG:CG1B @ 1.529T.

Tuesday, April 17, 2018, 11:02: TSG:PV1 Closed. Roughing pump off.

Vacuum group notified.


Wednesday, April 18, 2018: Replace pump & adapters. Clean.

Wednesday, April 18, 2018, 08:45: Start TSG:RP1 and open PV1, BV1A  & BV1B

Wednesday, April 18, 2018, 08:55: exhaust pipe/mesh cleared out back

Wednesday, April 18, 2018, 08:57: Turbo pumps on.

RP status ok.


Thursday, April 19, 2018, 08:30: waterlines opened. No response on RGA. Vacuum @ 3.42e-07T

ELOG V2.9.2-2455