  117   Friday, June 29, 2012, 13:39 Friedhelm Ames       start mass scan

start mass scan to do new mass calibration

  118   Friday, June 29, 2012, 15:02 Friedhelm Ames       mass scan finished

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

Attachment 1: mass_spectrum_2012_06_29.PNG
mass_spectrum_2012_06_29.PNG
  119   Friday, June 29, 2012, 15:03 Friedhelm Ames       start ramping down heater
  120   Friday, June 29, 2012, 16:39 Friedhelm Ames       mass scan finished

Friedhelm Ames wrote:

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

 new parameters for mass scan program after fit of mass scan

CONST11 = -4.13

CONST22 = 0.09595

  132   Friday, July 06, 2012, 11:04 Friedhelm Ames       source tripped off over night

A big vacuum excursion tripped the source off at about 1am. The vacuum did not fully recover afterwards only down to about 1.3e-6T. Ne leak has been closed and vacuum went down to 6e-7T within a few minutes. After the trip the current of the magnet stayed constant. Fluctuations may have been caused by high voltage sparks.

  133   Friday, July 06, 2012, 11:05 Friedhelm Ames       start source again

heater ramping up again with Ne leak closed.

  134   Friday, July 06, 2012, 11:18 Friedhelm Ames       TSG:TP1B off source off again.

turbo pump TSG:TP1B has tripped off. Cannot be restarted. Fault report to vacuum. Everything switched off again

 

  136   Monday, July 09, 2012, 11:14 Aurelia Laxdal       Test Stand status

Restarted the PC at the Test Stand.

Restarted the Archivers; currently pumping down the separator area.

  146   Thursday, July 12, 2012, 15:49 Anders Mjos       test stand vented for TP1A replacement

see e-fault 6142

  155   Thursday, August 09, 2012, 13:08 Pierre Bricault       Test FEBIAD

Waiting Rick for the fitting on the vacuum pump.

  159   Friday, August 10, 2012, 14:08 Rick Maharaj       Gas line pump

Gas line vacuum pump reinstalled after fitting was modified to receive a standard swagelok connector. The vacuum line was plumbed using 1/4" copper tube (not Stainless) for the the ability to flex and manipulate the line for pump removal and and insertion.

  160   Friday, August 10, 2012, 15:29 Pierre BricaultNALP-FEBIAD  NANA finishing the gas installation and its pump

1524H Start small pump.

1529H stop the pump.

 

  161   Friday, August 10, 2012, 15:57 Pierre Bricault        

Test high voltage to 30 kV ok

Test gas valve open at 6.1 V

Test Ne leak ok

Will run test from home.

 

  163   Saturday, August 11, 2012, 16:18 Pierre Bricault       Test FEBIAD anode biased at 120 V

The ramp up finished.

I have 3.35E-6 Amp out of the source on FC0.

Vacuum  4.3 E-7 T increase Coil current to 40 A. No effect on vac.

Increase coil to 50 A. Vacuum still good.

I will continue from home..

  194   Thursday, September 06, 2012, 09:23 Friedhelm AmesNB#7       

start high voltage and heaters

  203   Thursday, September 13, 2012, 13:05 Friedhelm AmesNb#7LP-SIS     heater ramping up started
  215   Tuesday, September 25, 2012, 16:10 Aurelia Laxdal       Conditioning - SiC-HP-FEBIAD for operator training

Did the HV conditioning up to 30kV.

Started the heaters conditioning:

for TSH:TGHT up to 580A

for TSH:TBHT up to 230A

  225   Thursday, November 01, 2012, 11:16 Aurelia LaxdalTiC#3LP-SISITWTM1   TiC#3-LP-SIS Startup

Did the HV conditioning for the TiC#3 up to 30kV.

Heaters ramp up in progress.

  226   Thursday, November 01, 2012, 14:57 Aurelia LaxdalTiC#3LP-SISITWTM1   TSH:TGHT readback stopped at 264.5A (for a higher setpoint)

The TSH:TGHT stopped at 263.7A, but the setpoint is still ramping (now at 421A). The voltage is set correctly: have 6.238V setpoint and 4.386V readback. The reading on the Power Supply shows 418A. Through the window the target assembly looks at high temperature. The readback on Epics seems stuck. E-Fault for Controls 6389

  227   Friday, November 02, 2012, 14:20 Aurelia Laxdal LP-SISITWTM1   Mass scan done

Mass scan file: plotdump-local-clean.txt Nov2 12 13-15-59.txt

The scan was taken at TGHT=573A (read from the PS panel) .

The TBHT = 230A