264
|
Wednesday, January 09, 2013, 14:13 |
Anders Mjos | Empty | | | | | | | Rouging | Wednesday, January 09, 2013, 14:12: Roughing empty chamber |
|
263
|
Wednesday, January 09, 2013, 10:39 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting | Wednesday, January 09, 2013, 10:38: Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24 : Venting with nitgogen
Wednesday, January 09, 2013, 14:12: Target removed |
|
262
|
Monday, January 07, 2013, 14:52 |
Sebastian Raeder | RFQ empty | | | | | | | heating target | heating target for RFQ tests. Now the wiring is insulated with alumina beats and tubing and the target has the standard Ta alkali element mixture
Unfortunately I deleted some entries, so here a short summary in combination with a screenshot of the striptool
heated to 580A, vacuum increased over time from 4.8 to 5.6E-7T
HV up to 30kV - current of 37 uA - seems fine
Mass scan not possible, ops found a water leak in the magnet PS, optics around the magnet are thereofre also not available and red in EPICS
NOTE: all FC values are in reversed bias!!
source +4.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 2E-9A at FC0
one spark observed
source -5.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 4E-11A at FC0
source -12V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 5E-11A at FC0
two sparks observed
source +4.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 3E-10A at FC0
source -5.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up - done again since not sure if the restore of the tune was done properly for this
about 4E-11A at FC0
done, source +4.5V, 2nd Rep +12V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 3E-10A at FC0
1 spark during HV ramping
done, source +4.5V, 2nd Rep&exit +12V: RFQ offs =+12V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
there is something visible <~ 2E-12A at FC0
reduced current to 550A and leave it over night.
Short summary:
suppression possible but RFQ has to be shifted, the "only source shift" mode yielded a worse suppression than expected - unfortunately no mass scans have been possible, which would help to get some information on possible effects
|
|
261
|
Friday, January 04, 2013, 15:07 |
Anders Mjos | RFQ empty | | | | | | In progress | Pumping down | Friday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24: Starting turbos
Friday, January 04, 2013, 15:33 : Turbos at speed
Friday, January 04, 2013, 15:34 : Vacuum at 1.7E-5 T |
|
260
|
Friday, January 04, 2013, 10:52 |
Anders Mjos | | | | | | | In progress | Preparing for venting | Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52: Turbos stopped
Friday, January 04, 2013, 13:50: Venting |
|
259
|
Thursday, January 03, 2013, 11:39 |
Anders Mjos | | | | | | | Problems/Solutions | Starting pumps after holiday shut down - TMSRP2 replaced | Thursday, January 03, 2013, 11:28: TMSRP2 is noisy. Stopped.
Roughing pump inspected by Vacuum group. Will be replaced later today. See e-fault 6516
Thursday, January 03, 2013, 11:29: TSGRP1 Started
Thursday, January 03, 2013, 11:29: TSGTP1A and 1B started
Thursday, January 03, 2013, 11:38 : TSGTP1A and B at speed
Thursday, January 03, 2013, 11:38 : Vacuum at 1.3E-5 T
TMSRP2 replaced
Thursday, January 03, 2013, 15:03: TMSTP2 and 6 started
Thursday, January 03, 2013, 15:07: TMSTP2 and 6 at speed
Thursday, January 03, 2013, 15:08: Vacuum at 5 E-5 T |
|
258
|
Thursday, January 03, 2013, 08:33 |
Anders Mjos | | | | | | | Problems/Solutions | Started archivers after holiday shut down | Started archivers. Controls whited out. |
|
257
|
Thursday, December 20, 2012, 14:19 |
Anders Mjos | | | | | | | | Power down for holidays | |
|
256
|
Wednesday, December 19, 2012, 16:22 |
Sebastian Raeder | | | | | | | Problems/Solutions | status after power outage | Wednesday, December 19, 2012, 16:24:
After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only TSGTP1B could be reset, while TMSTP2 is still showing this fault
Vacuum in Magnet section is 0.004T according to TMSCG2. Since the target chamber was vented to remove the RFQ tests target, this section is actually pumped down using the roughing pumps (water lines are blanked off)
archivers started
Wednesday, December 19, 2012, 21:43
I was now able to reset TMSTP2.
closed the roughing pumps to the target chamber, vacuum at 0.027T |
|
255
|
Wednesday, December 19, 2012, 11:24 |
Anders Mjos | | | | | | | Problems/Solutions | Restarted turbos in TMS section after power bump | Sources arch restared |
|
254
|
Wednesday, December 19, 2012, 09:44 |
Sebastian Raeder | | | | | | | In progress | venting | venting and inspect the target
Wednesday, December 19, 2012, 09:43: vqacuum at 1.9E-7T, stop turbos |
|
253
|
Tuesday, December 18, 2012, 16:00 |
Sebastian Raeder | RFQ empty | | | | | | Done | target heating | Tuesday, December 18, 2012, ~ 13:00 start ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56: @ 250A, target is glowing, center block is cooler (can be inspected with a new hole in the heatshield lid), thermocouple is reading 224C, which is definitely colder than the temp from visual insepection, reading may be corrupted from contact to Heatschield
Tuesday, December 18, 2012, 23:11: target at 600A(593A/7.35V Panel reading), vacuum was up to 1.7E-6T, now 1.34E-6T. temperature reading was 405C which is quite away from glowing. Nevertheless, the center block of the target is visibly colder than the legs, while the center support is still way colder then the block. Thermocouple readback removed from HV cage. since the is a short cut the target (thermocouple?) the RFQ can be biased to 18V for suppression. everything locked up and stat HV test.
Wednesday, December 19, 2012, 00:14: target at 600A(593A/7.35V Panel reading), vacuum at 8.5E-7T, first HV test done, up to 30kV some occasional sparks. RFQ (1MHz , 40Vpp) without bias--> no signal, RFQ -9V biased --> 1.5E-11 on TMS:FC0
Wednesday, December 19, 2012, 01:17 : vacuum at7.7E-7T, start cooling down, was ~ 2.5h at max current. |
|
252
|
Tuesday, December 18, 2012, 12:51 |
Sebastian Raeder | | | | | | | | Anode powersupply connected to HV-common | The anode PS is turned off and connected to HV common.
the Target is connected to a -18V PS at the center support (Feed through A) for a on/off test of ion suppression
NOTE: there is a shortcut target <--> HV gnd, most propably due to the thermocouple touching something after pumping.
workaround to obtain suppression for today is to put in a differnt driver for the RFQ which can be biased to positive potential. |
|
251
|
Monday, December 17, 2012, 22:35 |
Sebastian Raeder | RFQ empty | | | | | | | wire connection for RFQ test | Overview over the connections of the new 9Pin connector inside the vacuum and in the HV cage
1&2 : RFQ rods in the vacuum, RFQ Driver in HV cage
4: Repeller electrode, grounded in HV cage
5: Exit electrode , grounded in HV cage
6&7: thermocouple at the center block, w/o HV to OMEGA thermocouple display, with HV should be connected to GND with 1k-10kOhm (to allow a shift of the target)
8&9: not connected, grounded in HV cage
View on top of the feedthrough and the connector on the source tray (male connectors)
__________________
\ 1 2 3 4 5 /
\ 6 7 8 9 /
----------------------
1to1 connection for pins 1,2,4-9
Pin 3 is NOT CONNECTED
The pin pairs 1&2, 4&5, 6&7, 8&9 each use a line of twisted pairs |
|
250
|
Friday, December 14, 2012, 20:34 |
Sebastian Raeder | RFQ empty | | | | | | Done | pumping down | Friday, December 14, 2012, ~ 17:00: start roughing pumps
Friday, December 14, 2012, 20:33: start turbo pumps
Friday, December 14, 2012, 20:42 : turbos at speed
Friday, December 14, 2012, 20:43 : vacuum at 7.32E-6T
Monday, December 17, 2012, 12:53 vacuum at 1.77E-7T |
|
249
|
Friday, December 14, 2012, 15:28 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting |
Sebastian Raeder wrote: |
Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target
|
Friday, December 14, 2012, 15:27 : Venting |
|
248
|
Friday, December 14, 2012, 14:24 |
Sebastian Raeder | RFQ empty | | | | | | | Venting | Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target |
|
247
|
Thursday, December 13, 2012, 14:38 |
Anders Mjos | | | | | | | | Pumping down empty chamber | Thursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56 : Starting turbos
Thursday, December 13, 2012, 15:05 : turbos at speed
Thursday, December 13, 2012, 15:06 : vacuum at 2.3E-5 T
|
|
246
|
Thursday, December 13, 2012, 08:40 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting | Thursday, December 13, 2012, 08:38: TBHT and TGHT off
Thursday, December 13, 2012, 08:38 : Vacuum at 1.8E-7 T
Thursday, December 13, 2012, 08:38 : Turbos off
Thursday, December 13, 2012, 11:19: Venting
Thursday, December 13, 2012, 11:30: Water lines purged
Thursday, December 13, 2012, 11:41: Target removed for inspection. |
|
245
|
Tuesday, December 11, 2012, 13:40 |
Sebastian Raeder | RFQ empty | | | | | | Done | Heating test for Ion guide Laser ion source | new ion guide laser ion source installed. Pure target container without targetmaterial and without surface ion source.
Heat up to 580A for heat test of all components. Distance between target and repeller < 1mm
13:15 start heating TGHT, 1A per 30sec vacuum below 2E-7T
14:50 reached 200A at TGHT (1.5V readback same as frontpanel), vacuum now 2.9E-7T, proceed on to 400A
16:10 TGHT 350 A (setpoint, readback stopped at 269A) and 3.4V readback, sudden increase in vacuum from 4E-7T to 5.5E-7T and larger fluctuations, give it 10min
16:22 vacuum back to 4.4E-7T but some occasional vacuum spikes , proceed to 400A
17:00 at 400A / 4.13V, vacuum hit 2E-6T in between which delayed the heating, now decreasing, will goto 410A for half an hour and then 385A over night
Dec 12th
8:30 3.3E-7T Vac at 385A, goto 420A
8:50 7.5E-7T Vac at 420A, goto 450A
9:20 1.7E-6T Vac at 450A, goto 470A
10:00 1.5E-6T Vac at 470A / 4.5V
11:30 1.1E-6T at 520A/4.56V
Wednesday, December 12, 2012, 11:46 1.7E-6T at 550A/4.58V
Wednesday, December 12, 2012, 14:31
580A reached, Vacuum dropped from 1.8E-6T to 5.8E-7T in 2h
voltage read back is wrong as well Panel readings are 572A/6.99V (read back values in EPICS are 248A/ 4.6V)
Wednesday, December 12, 2012, 14:47 6.5E-7T at 592A/ 7.31V (Panel readings)
Wednesday, December 12, 2012, 15:01 there is no contact of the target to HV GND (especially the repeller), the target can still be biased to 5V
Wednesday, December 12, 2012, 19:48 5.9E-7Tvacuum is slowly going down now
Thursday, December 13, 2012, 00:23 5.5E-7T, start cooling down
Short summary on results of first heating teest with the Ion Guide Ion source:
The Ion source is still in good shape, nothing was effected by the heat. Just some deposition in the repellers and the exit electrode
The capton wires used for wiring the electrodes had some problem with heat and went black and got brittle - for the next test we will ad a Ta schield at the side of the source to prevent radiation inside the source. |
|