  55   Tuesday, March 06, 2012, 15:25 Pierre Bricault       ISAC test standTurbos at full speed. P = 1.5E-05 T   
  108   Thursday, June 28, 2012, 11:04 Pierre BricaultTest FEBIADLP-FEBIAD    In progressReady to bias the high voltage.    
  109   Thursday, June 28, 2012, 11:13 Pierre Bricault LP-FEBIAD     ISAC test stand ready for cathode heatingThe ISAC test stand is ready for cathode
heating.
Bias voltage: 30000 V
  
  110   Thursday, June 28, 2012, 11:19 Pierre Bricault LP-FEBIAD    In progressCathode ramping to 230 A in progress    
  111   Thursday, June 28, 2012, 11:27 Pierre Bricault LP-FEBIAD    In progressCathode heating in progress, pressure 8.3e-7 T    
  112   Thursday, June 28, 2012, 11:29 Pierre Bricault LP-FEBIAD    In progressLost all cnntrol interface, complete whiteout of the epics system.    
  114   Thursday, June 28, 2012, 17:00 Pierre Bricault LP-FEBIAD    In progressCathode heater reached its value of 230 A and stoped. good test.Now ramp cathode current up to 290 A. The
total current out is 1.e-7 A.
 
  
  115   Thursday, June 28, 2012, 17:18 Pierre Bricault LP-FEBIAD    In progressLeave the cathode heater at 275 A overninght.    
  116   Friday, June 29, 2012, 08:57 Pierre Bricault LP-FEBIAD    In progressContinue cathode heating This morning the pressure was 3.5E-7
T. Current at 275 A is 30nA.
Continue cathode heating to 290 A
  
  155   Thursday, August 09, 2012, 13:08 Pierre Bricault       Test FEBIADWaiting Rick for the fitting on the vacuum
pump.
  
  156   Friday, August 10, 2012, 11:29 Pierre BricaultNA   N ANAIn progressTest FEBIADThe helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out
  
  157   Friday, August 10, 2012, 12:44 Pierre BricaultNALP-FEBIAD  NANAIn progressFEBIAD testRick put the helium bottle back in the
rack.
Waiting for status of the gas lines.
  
  160   Friday, August 10, 2012, 15:29 Pierre BricaultNALP-FEBIAD  NANA finishing the gas installation and its pump1524H Start small pump.
1529H stop the pump.
 
  
  161   Friday, August 10, 2012, 15:57 Pierre Bricault        Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok
  
  162   Saturday, August 11, 2012, 13:34 Pierre BricaultNALP-FEBIAD  NANAIn progressTest FEBIAD anode bias 120 V    
  163   Saturday, August 11, 2012, 16:18 Pierre Bricault       Test FEBIAD anode biased at 120 VThe ramp up finished.
I have 3.35E-6 Amp out of the source
on FC0.
  
  164   Sunday, August 12, 2012, 21:50 Pierre Bricault      In progressTest FEBIADLost communication with EPICS. Came in
reset the ...
So far no luck.
  
  165   Sunday, August 12, 2012, 22:07 Pierre Bricault      In progressFBIAD testThe reset restored the control.
But magnet supply does not put any
amperage out.
  
  167   Monday, August 13, 2012, 10:59 Pierre Bricault      Problems/SolutionsTest FEBIADThis morning I try to contact PS group
no one answer. Dan Louie is in vacation.
I went into the can diagnostics panel
  
  168   Monday, August 13, 2012, 14:26 Pierre Bricault      In progressFEBIAD testI am done with the FEBIAD test (anode biased)
We will swap the bias now to the
cathode and change the polarity to negative.
  