Entry  Tuesday, March 06, 2012, 15:25, Pierre Bricault, , , , , , , , ISAC test stand 
Turbos at full speed. P = 1.5E-05 T
Entry  Thursday, June 28, 2012, 11:04, Pierre Bricault, Test FEBIAD, LP-FEBIAD, , , , , In progress, Ready to bias the high voltage. 
 
Entry  Thursday, June 28, 2012, 11:13, Pierre Bricault, , LP-FEBIAD, , , , , , ISAC test stand ready for cathode heating 
The ISAC test stand is ready for cathode heating.
Bias voltage: 30000 V
Bias current: 37 microAmp
Entry  Thursday, June 28, 2012, 11:19, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode ramping to 230 A in progress 
 
Entry  Thursday, June 28, 2012, 11:27, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heating in progress, pressure 8.3e-7 T 
 
Entry  Thursday, June 28, 2012, 11:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Lost all cnntrol interface, complete whiteout of the epics system. 
 
Entry  Thursday, June 28, 2012, 17:00, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heater reached its value of 230 A and stoped. good test. 
Now ramp cathode current up to 290 A. The total current out is 1.e-7 A.
 
Entry  Thursday, June 28, 2012, 17:18, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Leave the cathode heater at 275 A overninght. 
 
Entry  Friday, June 29, 2012, 08:57, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Continue cathode heating 
 This morning the pressure was 3.5E-7 T. Current at 275 A is 30nA.
Continue cathode heating to 290 A during meeting.
Start seeing some electron current from the cathode around 275 A.
Entry  Thursday, August 09, 2012, 13:08, Pierre Bricault, , , , , , , , Test FEBIAD 
Waiting Rick for the fitting on the vacuum pump.
Entry  Friday, August 10, 2012, 11:29, Pierre Bricault, NA, , , , N A, NA, In progress, Test FEBIAD 
The helium bottle was found empty.
Rick will refill it and hook the leak detector on the system to find out
if we have a leak on the line.
Entry  Friday, August 10, 2012, 12:44, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, In progress, FEBIAD test 
Rick put the helium bottle back in the rack.
Waiting for status of the gas lines.
 
Entry  Friday, August 10, 2012, 15:29, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, , finishing the gas installation and its pump 
1524H Start small pump.
1529H stop the pump.
 
Entry  Friday, August 10, 2012, 15:57, Pierre Bricault, , , , , , , ,  
Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok
Entry  Saturday, August 11, 2012, 13:34, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, In progress, Test FEBIAD anode bias 120 V 
 
Entry  Saturday, August 11, 2012, 16:18, Pierre Bricault, , , , , , , , Test FEBIAD anode biased at 120 V 
The ramp up finished.
I have 3.35E-6 Amp out of the source on FC0.
Vacuum  4.3 E-7 T increase Coil current to 40 A. No effect on vac.
Entry  Sunday, August 12, 2012, 21:50, Pierre Bricault, , , , , , , In progress, Test FEBIAD 
Lost communication with EPICS. Came in reset the ...
So far no luck.
 
Entry  Sunday, August 12, 2012, 22:07, Pierre Bricault, , , , , , , In progress, FBIAD test 
The reset restored the control.
But magnet supply does not put any amperage out.
Try turning it off and on. No chance.
Entry  Monday, August 13, 2012, 10:59, Pierre Bricault, , , , , , , Problems/Solutions, Test FEBIAD 
This morning I try to contact PS group no one answer. Dan Louie is in vacation.
I went into the can diagnostics panel and reconfigure MB1 power supply.
This worked.
Entry  Monday, August 13, 2012, 14:26, Pierre Bricault, , , , , , , In progress, FEBIAD test 
I am done with the FEBIAD test (anode biased)
We will swap the bias now to the cathode and change the polarity to negative.