Entry  Tuesday, June 06, 2017, 09:22, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Tuesday, June 06, 2017, 09:21: roughing.

Friday, June 09, 2017, 08:50: Ion gauge off. Turbo pumps off.
Friday, June 09, 2017, 10:46: Venting.
Entry  Wednesday, June 07, 2017, 12:49, Aaron Schmidt, , , , , , , , Gas bottles 
 Gas bottles for FEBIAD testing were exchanged yesterday around 1:30. One Neon & one Argon bottle were removed.
Two Neon bottles were added.
Entry  Friday, June 16, 2017, 11:23, Aaron Schmidt, , , , , , , , Pump down empty chamber. 
Friday, June 16, 2017, 11:22: roughing.
Friday, June 16, 2017, 14:28: Turbo pumps on

Friday, June 30, 2017, 10:37: Ion gauge, turbos off.
Entry  Wednesday, July 19, 2017, 09:13, Aaron Schmidt, Ta Targets, , , , , , Done, Ion Peaks Magnet_peaks.xlsx
Attached is a recent list of Ta targets with their extracted ions peaks.
Entry  Thursday, August 03, 2017, 17:00, Anders Mjos, , , , , , , Problems/Solutions, Vacuum system tripped on power interruption 
 Thursday, August 03, 2017, 17:00: Restarted TPs
Entry  Thursday, August 17, 2017, 12:45, Anders Mjos, , , , , , , Problems/Solutions, TBHT power supply removed  
 The Xantrex 10V 600 A power supply for the TBHT has been moved to ITE to replace the failed TGHT power supply
    Reply  Monday, August 21, 2017, 16:20, Anders Mjos, , , , , , , Problems/Solutions, TBHT power supply removed  


    
        
            Anders Mjos wrote:
        
        
            
             The Xantrex 10V 600 A power supply for the TBHT has been moved to ITE to replace the failed TGHT
Entry  Monday, September 25, 2017, 14:10, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Monday, September 25, 2017, 14:10: Roughing.

Wednesday, September 27, 2017, 08:23: Turbo pumps on

Friday, October 06, 2017, 09:04: Ion gauge off. Turbos off.
Entry  Tuesday, October 10, 2017, 13:10, Aaron Schmidt, , , , , , , , Gas bottles 
Tuesday, October 10, 2017, 09:30:  Install/swap gas bottles. Elog.
Removed smallest Neon leak. Neon Bottle Serial #11231. Leak rate calibrated @ 1.59e-07 atm*CC/sec (02/09/2016)
In use:
Entry  Tuesday, October 10, 2017, 14:56, Aaron Schmidt, , , , , , , In progress, FEBIAD Anode bias configuration 
Unable to hold Anode voltage after power supply change out.
Tuesday, October 10, 2017, 14:55: The Test Stand has been configured for Anode bias and the electrical connections have been wired according  to ISK4523D
REV 6.
Entry  Monday, October 16, 2017, 11:46, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber Test EE 
Monday, October 16, 2017, 11:45: Roughing.
Monday, October 16, 2017, 12:05: Turbo pumps started.
Monday, October 16, 2017, 12:10; Ion gauge on.
Entry  Tuesday, October 24, 2017, 11:38, Anders Mjos, , , , , , , , FEBIAD coil magnetic field measurment FEBIAD_Coil_Field_Measurement_2017-10-25.xlsx171025-First-Run.xlsx
with Fernando
Tuesday, October 24, 2017: Testing setup with triple coil
Wednesday, October 25, 2017: Field mapping at 70 A and current/field measurements on triple coil.
Entry  Monday, October 30, 2017, 08:54, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP6 shut down due to high noise 
The turbo pump will need replacement.
Entry  Wednesday, November 15, 2017, 10:56, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:TP6 replacement 
Turbo pump TP6 requires replacement.
Wednesday, November 15, 2017, 09:55: Turbo (TP2) off. Ion gauge off.
Wednesday, November 15, 2017, 10:55: Venting
Entry  Monday, December 04, 2017, 08:29, Aaron Schmidt, , , , , , , Problems/Solutions, Power outage 20171205_103324.jpg
Power outage over the weekend. Reboot PLC and systems.
Monday, December 04, 2017, 08:22: Turbo pumps TMS:TP6 & TP2 Restarted.
Monday, December 04, 2017, 08:28: Time out on turbo pump TP1B.
Entry  Thursday, December 21, 2017, 15:12, Anders Mjos, , , , , , , , Powered down devices 
Powered down vacuum gauge and turbo pump controllers
Entry  Tuesday, January 02, 2018, 09:18, Anders Mjos, , , , , , , Problems/Solutions, Starting system 
Tuesday, January 02, 2018
Cycled power for TCSIOC and PLCIOC
TP2 and TP6 started
Entry  Monday, January 22, 2018, 09:04, Aaron Schmidt, , , , , , , Done, Power outage & Controller replacement. 
Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00: ISAC PLC TLCIOC Restarted. 
Turbo pumps restarted.
Entry  Friday, January 26, 2018, 11:10, Aaron Schmidt, , , , , , , Done, Helium tank replacement 
Friday, January 26, 2018, 11:08: New Helium tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank was not opened.
-The old tank was placed beside the Test Stand beneath/beside the power switch.
Entry  Monday, February 05, 2018, 09:17, Aaron Schmidt, , , , , , , Problems/Solutions, Epics loss 
Monday, February 05, 2018, 09:10: the epics program was in 'White-out'. Turbo pumps tripped.
Unplug, re-plug PLC.
Monday, February 05, 2018, 09:16: Restart Turbo pumps on chamber & beamline.