Monday, January 14, 2013, 13:51, Sebastian Raeder, RFQ empty, , , , , , In progress, heating
|
Started heating the target, now Silica sleevings are installed for wire insulation and the gap target -- repeller is now 0.6mm (was 0.25mm) |
Friday, January 11, 2013, 11:02, Anders Mjos, RFQ empty, , , , , , , Target installed, pumping down
|
Target installed with 120 in lbs torque on target legs and on central support.
Friday, January 11, 2013, 11:01: Roughing
Friday, January 11, 2013, 11:25: Start turbos - SR |
Friday, January 11, 2013, 08:37, Anders Mjos, Empty, , , , , , In progress, Venting
|
Friday, January 11, 2013, 08:36: Venting for installation of RFQ test target later today |
Wednesday, January 09, 2013, 14:13, Anders Mjos, Empty, , , , , , , Rouging
|
Wednesday, January 09, 2013, 14:12: Roughing empty chamber |
Wednesday, January 09, 2013, 10:39, Anders Mjos, RFQ empty, , , , , , In progress, Venting
|
Wednesday, January 09, 2013, 10:38: Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24 : Venting with nitgogen
Wednesday, January 09, 2013, 14:12: Target removed |
Monday, January 07, 2013, 14:52, Sebastian Raeder, RFQ empty, , , , , , , heating target
|
heating target for RFQ tests. Now the wiring is insulated with alumina beats and tubing and the target has the standard Ta alkali element mixture
Unfortunately I deleted some entries, so here a short summary in combination with a screenshot of the striptool |
Friday, January 04, 2013, 15:07, Anders Mjos, RFQ empty, , , , , , In progress, Pumping down
|
Friday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24: Starting turbos
Friday, January 04, 2013, 15:33 : Turbos at speed |
Friday, January 04, 2013, 10:52, Anders Mjos, , , , , , , In progress, Preparing for venting
|
Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52: Turbos stopped
Friday, January 04, 2013, 13:50: Venting |
Thursday, January 03, 2013, 11:39, Anders Mjos, , , , , , , Problems/Solutions, Starting pumps after holiday shut down - TMSRP2 replaced
|
Thursday, January 03, 2013, 11:28: TMSRP2 is noisy. Stopped.
Roughing pump inspected by Vacuum group. Will be replaced later today. See e-fault 6516
Thursday, January 03, 2013, 11:29: TSGRP1 Started |
Thursday, January 03, 2013, 08:33, Anders Mjos, , , , , , , Problems/Solutions, Started archivers after holiday shut down
|
Started archivers. Controls whited out. |
Thursday, December 20, 2012, 14:19, Anders Mjos, , , , , , , , Power down for holidays
|
|
Wednesday, December 19, 2012, 16:22, Sebastian Raeder, , , , , , , Problems/Solutions, status after power outage
|
Wednesday, December 19, 2012, 16:24:
After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only
TSGTP1B could be reset, while TMSTP2 is still showing this fault |
Wednesday, December 19, 2012, 11:24, Anders Mjos, , , , , , , Problems/Solutions, Restarted turbos in TMS section after power bump
|
Sources arch restared |
Wednesday, December 19, 2012, 09:44, Sebastian Raeder, , , , , , , In progress, venting
|
venting and inspect the target
Wednesday, December 19, 2012, 09:43: vqacuum at 1.9E-7T, stop turbos |
Tuesday, December 18, 2012, 16:00, Sebastian Raeder, RFQ empty, , , , , , Done, target heating
|
Tuesday, December 18, 2012, ~ 13:00 start ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56: @ 250A, target is glowing, center block is cooler (can be inspected with a new hole in the heatshield lid),
thermocouple is reading 224C, which is definitely colder than the temp from visual insepection, reading may be corrupted from contact to Heatschield |
Tuesday, December 18, 2012, 12:51, Sebastian Raeder, , , , , , , , Anode powersupply connected to HV-common
|
The anode PS is turned off and connected to HV common.
the Target is connected to a -18V PS at the center support (Feed through A) for a on/off test of ion suppression
NOTE: there is a shortcut target <--> HV gnd, most propably due to the thermocouple touching something after pumping. |
Monday, December 17, 2012, 22:35, Sebastian Raeder, RFQ empty, , , , , , , wire connection for RFQ test
|
Overview over the connections of the new 9Pin connector inside the vacuum and in the HV cage
1&2 : RFQ rods in the vacuum, RFQ Driver in HV cage
4: Repeller electrode, grounded in HV cage |
Friday, December 14, 2012, 20:34, Sebastian Raeder, RFQ empty, , , , , , Done, pumping down
|
Friday, December 14, 2012, ~ 17:00: start roughing pumps
Friday, December 14, 2012, 20:33: start turbo pumps
Friday, December 14, 2012, 20:42 : turbos at speed |
Friday, December 14, 2012, 14:24, Sebastian Raeder, RFQ empty, , , , , , , Venting
|
Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target |
Friday, December 14, 2012, 15:28, Anders Mjos, RFQ empty, , , , , , In progress, Venting
|
Sebastian Raeder wrote:
Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target |
Thursday, December 13, 2012, 14:38, Anders Mjos, , , , , , , , Pumping down empty chamber
|
Thursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56 : Starting turbos
Thursday, December 13, 2012, 15:05 : turbos at speed |
|