473
|
Thursday, October 15, 2015, 11:19 |
Anders Mjos | | | | | | | Problems/Solutions | Right side TGHT connector block removed | The keensert has been worn out and will be replaced.
The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged). |
Attachment 1: Photo_2015-10-16_11_57_45_AM.jpg
|
|
Attachment 2: Photo_2015-10-16_11_57_51_AM.jpg
|
|
|
474
|
Friday, October 16, 2015, 12:26 |
Anders Mjos | Target tube only | | | | | 41120-4 | In progress | Conditioning HS for UC#14 | Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06: Started turbos.
Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T
IG1 filament beeing replaced.
Thursday, October 22, 2015, 13:56: Leak on water lines (pressurized all lines except HS line with helium)
Thursday, October 22, 2015, 13:57: Stopping turbos. RGA off.
Thursday, October 22, 2015, 15:02: Venting
Re-tightened all newly installed fittings.
Thursday, October 22, 2015, 15:41: Roughing
Thursday, October 22, 2015, 16:12: Turbos started.
Thursday, October 22, 2015, 16:22: Turbos at speed. Vacuum at 1.2 E-5 T. RGA on
Monday, October 26, 2015, 08:42: Stopped turbos. Water leak still present. RGA off.
Tuesday, October 27, 2015, 08:57: Venting
Tuesday, October 27, 2015, 14:25: roughing
Tuesday, October 27, 2015, 15:03: Turbos started.
Water can still be seen on the RGA when the TGHT cooling lines are pressurized.
Thursday, October 29, 2015, 14:00: Stopped turbos. RGA off.
Monday, November 02, 2015, 08:30: Venting |
Attachment 1: 2015-10-22_TS_Leak.docx
|
|
475
|
Monday, October 19, 2015, 09:45 |
Anders Mjos | | | | | | | Problems/Solutions | IG1 filament dead | Will went chamber to replace the filament.
See e-fault 8501
Monday, October 19, 2015, 09:43: turbos stopped
Monday, October 19, 2015, 10:19: Venting
Monday, October 19, 2015, 15:36: Gauge replaced by Anthony.
Monday, October 19, 2015, 15:36: Roughing
Monday, October 19, 2015, 16:05: Turbos started
Monday, October 19, 2015, 16:13: Turbos at speed. Vacuum does not display correct value (1E-11 T)
Tuesday, October 20, 2015, 08:14: Switched on controller. Gauge seem to operate fine. |
|
476
|
Monday, October 19, 2015, 15:39 |
Anders Mjos | | | | | | | Problems/Solutions | Exhaust came off the new RP2 |
Anders Mjos wrote: |
by vacuum group. The pump was making more noise than usual.
|
It seems the exhaust line is blocked which caused pressure to build up and eventually forced the exhaust tube off RP2 as RP1 was roughing down the vacuum chamber.
Vacuum group has been notified and will ask plant group to investigate.
Plant group has removed the blockage. Exhaust lines are reconnected to the roughing pumps. |
|
477
|
Monday, November 02, 2015, 12:47 |
Anders Mjos | | | | | | | Problems/Solutions | Removed Swagelok T from rioght TGHT water lines | Mico replaced the T's with copper tube and leak checked.
Monday, November 02, 2015, 12:46: Roughing
Monday, November 02, 2015, 13:19: Starting turbos
Monday, November 02, 2015, 13:27: Turbos at speed. Vacuum at 2.6E-5 T. RGA on
Tuesday, November 03, 2015, 08:23: Pressurized TGHT line with 70 psi He. No response on vacuum or RGA.
Tuesday, November 03, 2015, 08:38: Opened water supply all lines. Vacuum stable at 6.8E-7 T. No response on RGA |
|
478
|
Tuesday, November 03, 2015, 09:00 |
Anders Mjos | Target tube only | | | | | 41120-4 | In progress | Conditioning HS for UC#14 | Tuesday, November 03, 2015, 08:59: Starting TGHT ramping to 580 A at 1 A/min
Thursday, November 05, 2015, 16:39 : Ramping down
Monday, November 09, 2015, 08:13: Turbos stopped
Monday, November 16, 2015, 10:24: Venting |
|
479
|
Monday, November 16, 2015, 14:52 |
Anders Mjos | | | | | | | In progress | Current measurement | Installed Cu-shunts on TGHT and TBHT terminals. HS water looped.
Monday, November 16, 2015, 14:43: Roughing
Monday, November 16, 2015, 15:21: Turbos started.
Monday, November 16, 2015, 15:30: turbos at speed. Vacuum at 1.7E-5 T
Tuesday, November 17, 2015, 11:27: finished high current test.
Wednesday, December 02, 2015, 09:47: Turbos stopped.
Wednesday, December 02, 2015, 13:49: Venting |
Attachment 1: 2015-11-17_High_Current_Test.png
|
|
Attachment 2: 2015-11-17_Current_vs_Voltage_TGHT_and_TBHT.xlsx
|
|
480
|
Tuesday, November 17, 2015, 11:27 |
Anders Mjos | | | | | | | Problems/Solutions | Ran RP2 with gas ballast for 15 min | To recover performance |
Attachment 1: 2015-11-17_RP2_performance.png
|
|
|
481
|
Wednesday, December 02, 2015, 14:50 |
Anders Mjos | | | | | | | Problems/Solutions | Nitrogen supply for venting temporarely from bottle | No supply of N through the piping due to work on the N tanks. Confirmed with Geoff Hodgson. ISIS supply is shut off. Using a bottle until the supply is returned.
Monday, January 11, 2016
Nitrogen supply from ISIS restored and reconnected. |
|
483
|
Friday, December 18, 2015, 11:44 |
Anders Mjos | | | | | | | Problems/Solutions | IG6 not reading correctly | The new controller (XGS-600) installed for IG6 use a different voltage to pressure conversion than the previous models. This causes a discrepancy between values in EPICS and the value displayed on the controller. An e-fault has been submitted.
Friday, December 18, 2015, 14:40: EPICS updated and restarted. |
|
484
|
Wednesday, January 06, 2016, 09:28 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak fixed on flow sensor for HS circuit | The Swagelok fitting on the return side of the flow sensor for the HS circuit was tightened to stop the leak. See e-fault 8650 |
|
485
|
Monday, January 11, 2016, 09:02 |
Anders Mjos | | | | | | | | Venting | Monday, January 11, 2016, 09:02: Turbos stopped.
Monday, January 11, 2016, 12:58: Venting
Roughed down yesterday due to change of plans.
Tuesday, January 12, 2016, 09:58: Turbos started.
Thursday, January 14, 2016, 11:44: Turbos stopped. |
|
486
|
Monday, January 18, 2016, 08:41 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 nor performing | The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today |
|
487
|
Monday, January 18, 2016, 15:38 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping. |
Attachment 1: 2016-01-18_Pumping_on_Ta46Clone_(leak_at_Lid-Base_HS).png
|
|
|
488
|
Tuesday, January 19, 2016, 18:34 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway. |
|
489
|
Wednesday, January 20, 2016, 14:26 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A. |
|
490
|
Wednesday, January 20, 2016, 19:11 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF. |
|
491
|
Thursday, January 21, 2016, 13:04 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK. |
|
492
|
Friday, January 22, 2016, 11:07 |
Anders Mjos | | | | | | | In progress | Venting | Friday, January 22, 2016, 11:07: Stopped turbos |
|
493
|
Friday, January 22, 2016, 13:35 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK.
|
Temperature measurements ended on Thursday, January 21, followed by cool down over night. |
|