  473   Thursday, October 15, 2015, 11:19 Anders Mjos      Problems/SolutionsRight side TGHT connector block removed

The keensert has been worn out and will be replaced.

The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged).

Attachment 1: Photo_2015-10-16_11_57_45_AM.jpg
Photo_2015-10-16_11_57_45_AM.jpg
Attachment 2: Photo_2015-10-16_11_57_51_AM.jpg
Photo_2015-10-16_11_57_51_AM.jpg
  474   Friday, October 16, 2015, 12:26 Anders MjosTarget tube only    41120-4In progressConditioning HS for UC#14

Friday, October 16, 2015, 12:20: Roughing.

Friday, October 16, 2015, 13:06: Started turbos.

Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T


IG1 filament beeing replaced.


 Thursday, October 22, 2015, 13:56: Leak on water lines (pressurized all lines except HS line with helium)

Thursday, October 22, 2015, 13:57: Stopping turbos. RGA off.

Thursday, October 22, 2015, 15:02: Venting

Re-tightened all newly installed fittings.

Thursday, October 22, 2015, 15:41: Roughing

Thursday, October 22, 2015, 16:12: Turbos started.

Thursday, October 22, 2015, 16:22: Turbos at speed. Vacuum at 1.2 E-5 T. RGA on


Monday, October 26, 2015, 08:42: Stopped turbos. Water leak still present. RGA off.


Tuesday, October 27, 2015, 08:57: Venting

Tuesday, October 27, 2015, 14:25: roughing

Tuesday, October 27, 2015, 15:03: Turbos started.


Water can still be seen on the RGA when the TGHT cooling lines are pressurized.

Thursday, October 29, 2015, 14:00: Stopped turbos. RGA off.


Monday, November 02, 2015, 08:30: Venting

Attachment 1: 2015-10-22_TS_Leak.docx
  475   Monday, October 19, 2015, 09:45 Anders Mjos      Problems/SolutionsIG1 filament dead

Will went chamber to replace the filament.

See e-fault 8501 

Monday, October 19, 2015, 09:43: turbos stopped

Monday, October 19, 2015, 10:19: Venting

Monday, October 19, 2015, 15:36: Gauge replaced by Anthony.

Monday, October 19, 2015, 15:36: Roughing

Monday, October 19, 2015, 16:05: Turbos started

Monday, October 19, 2015, 16:13: Turbos at speed. Vacuum does not display correct value (1E-11 T)


Tuesday, October 20, 2015, 08:14: Switched on controller. Gauge seem to operate fine.

  476   Monday, October 19, 2015, 15:39 Anders Mjos      Problems/SolutionsExhaust came off the new RP2

Anders Mjos wrote:

 by vacuum group. The pump was making more noise than usual.

 It seems the exhaust line is blocked which caused pressure to build up and eventually forced the exhaust tube off RP2 as RP1 was roughing down the vacuum chamber.

Vacuum group has been notified and will ask plant group to investigate.


Plant group has removed the blockage. Exhaust lines are reconnected to the roughing pumps.

  477   Monday, November 02, 2015, 12:47 Anders Mjos      Problems/SolutionsRemoved Swagelok T from rioght TGHT water lines

Mico replaced the T's with copper tube and leak checked.

Monday, November 02, 2015, 12:46: Roughing

Monday, November 02, 2015, 13:19: Starting turbos

Monday, November 02, 2015, 13:27: Turbos at speed. Vacuum at 2.6E-5 T. RGA on


Tuesday, November 03, 2015, 08:23: Pressurized TGHT line with 70 psi He. No response on vacuum or RGA.

Tuesday, November 03, 2015, 08:38: Opened water supply all lines. Vacuum stable at 6.8E-7 T. No response on RGA

  478   Tuesday, November 03, 2015, 09:00 Anders MjosTarget tube only    41120-4In progressConditioning HS for UC#14

Tuesday, November 03, 2015, 08:59: Starting TGHT ramping to 580 A at 1 A/min


Thursday, November 05, 2015, 16:39 : Ramping down


Monday, November 09, 2015, 08:13: Turbos stopped


Monday, November 16, 2015, 10:24: Venting

  479   Monday, November 16, 2015, 14:52 Anders Mjos      In progressCurrent measurement

Installed Cu-shunts on TGHT and TBHT terminals. HS water looped.

 Monday, November 16, 2015, 14:43: Roughing

Monday, November 16, 2015, 15:21: Turbos started.

Monday, November 16, 2015, 15:30: turbos at speed. Vacuum at 1.7E-5 T


Tuesday, November 17, 2015, 11:27: finished high current test.


Wednesday, December 02, 2015, 09:47: Turbos stopped.

Wednesday, December 02, 2015, 13:49: Venting

Attachment 1: 2015-11-17_High_Current_Test.png
2015-11-17_High_Current_Test.png
Attachment 2: 2015-11-17_Current_vs_Voltage_TGHT_and_TBHT.xlsx
  480   Tuesday, November 17, 2015, 11:27 Anders Mjos      Problems/SolutionsRan RP2 with gas ballast for 15 min

To recover performance

Attachment 1: 2015-11-17_RP2_performance.png
2015-11-17_RP2_performance.png
  481   Wednesday, December 02, 2015, 14:50 Anders Mjos      Problems/SolutionsNitrogen supply for venting temporarely from bottle

No supply of N through the piping due to work on the N tanks. Confirmed with Geoff Hodgson. ISIS supply is shut off. Using a bottle until the supply is returned.


Monday, January 11, 2016

Nitrogen supply from ISIS restored and reconnected.

  483   Friday, December 18, 2015, 11:44 Anders Mjos      Problems/SolutionsIG6 not reading correctly

The new controller (XGS-600) installed for IG6 use a different voltage to pressure conversion than the previous models. This causes a discrepancy between values in EPICS and the value displayed on the controller. An e-fault has been submitted.

Friday, December 18, 2015, 14:40: EPICS updated and restarted.

  484   Wednesday, January 06, 2016, 09:28 Anders Mjos      Problems/SolutionsWater leak fixed on flow sensor for HS circuit

 The Swagelok fitting on the return side of the flow sensor for the HS circuit was tightened to stop the leak. See e-fault 8650

  485   Monday, January 11, 2016, 09:02 Anders Mjos       Venting

Monday, January 11, 2016, 09:02: Turbos stopped.

Monday, January 11, 2016, 12:58: Venting


Roughed down yesterday due to change of plans.

Tuesday, January 12, 2016, 09:58: Turbos started.


Thursday, January 14, 2016, 11:44: Turbos stopped.

  486   Monday, January 18, 2016, 08:41 Anders Mjos      Problems/SolutionsTSG:RP1 nor performing

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

  487   Monday, January 18, 2016, 15:38 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

Attachment 1: 2016-01-18_Pumping_on_Ta46Clone_(leak_at_Lid-Base_HS).png
2016-01-18_Pumping_on_Ta46Clone_(leak_at_Lid-Base_HS).png
  488   Tuesday, January 19, 2016, 18:34 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Aurelia Laxdal wrote:

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

 Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.

  489   Wednesday, January 20, 2016, 14:26 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

 Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.

Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.

  490   Wednesday, January 20, 2016, 19:11 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

 Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.

Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.

Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.

  491   Thursday, January 21, 2016, 13:04 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

 Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.

Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.

Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.

 Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK.

  492   Friday, January 22, 2016, 11:07 Anders Mjos      In progressVenting

 Friday, January 22, 2016, 11:07: Stopped turbos

  493   Friday, January 22, 2016, 13:35 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

 Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.

Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.

Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.

 Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK.

 Temperature measurements ended on Thursday, January 21, followed by cool down over night.