ID Date Author Target/No.# Source Station Moduledown Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  601   Thursday, August 03, 2017, 17:00 Anders Mjos      Problems/SolutionsVacuum system tripped on power interruption Thursday, August 03, 2017, 17:00:
Restarted TPs
  
  602   Tuesday, August 15, 2017, 08:41 Aaron SchmidtTa#55LP-SIS  42218-1142738-2In progressTBHT sight in testHeat TGHT to 580 A & TGHT to 
200 A for view port test.
Tuesday, August 15, 2017, 08:40:
  
  603   Thursday, August 17, 2017, 12:45 Anders Mjos      Problems/SolutionsTBHT power supply removed  The Xantrex 10V 600 A power supply
for the TBHT has been moved to ITE to replace
the failed TGHT power supply
  
  604   Monday, August 21, 2017, 16:20 Anders Mjos      Problems/SolutionsTBHT power supply removed


   
        
            
  
  606   Monday, September 25, 2017, 14:10 Aaron Schmidt       Pump down empty chamberMonday, September 25, 2017, 14:10: Roughing.

Wednesday, September 27,
2017, 08:23: Turbo pumps on
  
  608   Tuesday, October 10, 2017, 13:10 Aaron Schmidt       Gas bottlesTuesday, October 10, 2017, 09:30: 
Install/swap gas bottles. Elog.
Removed smallest Neon leak. Neon
  
  609   Tuesday, October 10, 2017, 14:56 Aaron Schmidt      In progressFEBIAD Anode bias configurationUnable to hold Anode voltage after power
supply change out.
Tuesday, October 10, 2017, 14:55:
  
  611   Monday, October 16, 2017, 11:46 Aaron Schmidt      In progressPump down empty chamber Test EEMonday, October 16, 2017, 11:45: Roughing.
Monday, October 16, 2017, 12:05:
Turbo pumps started.
  
  612   Tuesday, October 24, 2017, 11:38 Anders Mjos       FEBIAD coil magnetic field measurmentwith Fernando
Tuesday, October 24, 2017: Testing
setup with triple coil
 FEBIAD_Coil_Field_Measurement_2017-10-25.xlsx171025-First-Run.xlsx 
  613   Monday, October 30, 2017, 08:54 Anders Mjos      Problems/SolutionsTMS:TP6 shut down due to high noiseThe turbo pump will need replacement.   
  614   Wednesday, November 15, 2017, 10:56 Aaron Schmidt      Problems/SolutionsTMS:TP6 replacementTurbo pump TP6 requires replacement.
Wednesday, November 15, 2017, 09:55:
Turbo (TP2) off. Ion gauge off.
  
  615   Friday, December 01, 2017, 14:31 Aaron Schmidt LP-SIS  (Blank)42752-3In progressSilver plated bolts test / Outgas TSChamber 'open state, no turbos' 2 weeks.
Testing Silver plated 3/8"-16x1"
(SCR, SHC, 18-8, AG) bolt on the TBHT.
 1st_silver_bolts_test.docxTS-2017-12-05-08-10.rga 
  616   Monday, December 04, 2017, 08:29 Aaron Schmidt      Problems/SolutionsPower outagePower outage over the weekend. Reboot PLC
and systems.
Monday, December 04, 2017, 08:22:
 20171205_103324.jpg 
  617   Tuesday, December 12, 2017, 08:32 Aaron Schmidt LP-SIS  (Blank)42752-3DonePump down w/ possible outgasCheck achievable vacuum. Watch for spikes
on RGA. Silver bolts removed from the chamber.
Vented steel screws in.
 Empty_Chamber_-_Silver_bolts_removed.docxTS-2017-12-12-09-00.rgaTS-2017-12-13-06-50.rga 
  618   Wednesday, December 20, 2017, 09:11 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHoliday Shut DownPower/sources already off. The water cooling
is currently left on.
Wednesday, December 20, 2017, 09:07:
  
  619   Thursday, December 21, 2017, 15:12 Anders Mjos       Powered down devicesPowered down vacuum gauge and turbo pump
controllers
  
  620   Tuesday, January 02, 2018, 09:18 Anders Mjos      Problems/SolutionsStarting systemTuesday, January 02, 2018
Cycled power for TCSIOC and PLCIOC
TP2 and TP6 started
  
  621   Monday, January 22, 2018, 09:04 Aaron Schmidt      DonePower outage & Controller replacement.Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00:
ISAC PLC TLCIOC Restarted. 
  
  622   Friday, January 26, 2018, 11:10 Aaron Schmidt      DoneHelium tank replacementFriday, January 26, 2018, 11:08: New Helium
tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank
  
  623   Friday, January 26, 2018, 13:59 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHV test 1Friday, January 26, 2018, 14:00: BIAS/EZL/EE
ramp up.
Friday, January 26, 2018, 14:06:
 2018_HV_test_1.docx 