604
|
Monday, August 21, 2017, 16:20 |
Anders Mjos | | | | | | | Problems/Solutions | TBHT power supply removed |
|
|
612
|
Tuesday, October 24, 2017, 11:38 |
Anders Mjos | | | | | | | | FEBIAD coil magnetic field measurment | with Fernando
Tuesday, October 24, 2017: Testing
setup with triple coil |
|
613
|
Monday, October 30, 2017, 08:54 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP6 shut down due to high noise | The turbo pump will need replacement. |
|
619
|
Thursday, December 21, 2017, 15:12 |
Anders Mjos | | | | | | | | Powered down devices | Powered down vacuum gauge and turbo pump
controllers |
|
620
|
Tuesday, January 02, 2018, 09:18 |
Anders Mjos | | | | | | | Problems/Solutions | Starting system | Tuesday, January 02, 2018
Cycled power for TCSIOC and PLCIOC
TP2 and TP6 started |
|
661
|
Tuesday, May 22, 2018, 08:48 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:TP1A not running | Pump found off on Tuesday morning.
Tuesday, May 22, 2018, 08:40: Starting
TP1A |
|
662
|
Thursday, May 24, 2018, 08:38 |
Anders Mjos | | | | | | | Problems/Solutions | Venting beamline for IG6 replacement | Thursday, May 24, 2018, 08:38: TPs stopped
Thursday, May 24, 2018, 09:18: Venting
Thursday, May 24, 2018, 14:30: IG6 |
|
663
|
Thursday, May 24, 2018, 15:28 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured FEBIAD coil for testing new source tray | Thursday, May 24, 2018: Configured coil
to be (-) E&F, (+) G&H. Water should
be supplied to both terminals in either configuration. |
|
665
|
Monday, June 04, 2018, 16:02 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 timeout | Mass separator magnet timed out. Tried
reconfigure. Called Kyle from controls who
power cycled the CANbus card. This resolved |
|
670
|
Thursday, June 21, 2018, 16:32 |
Anders Mjos | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Heating target | Thursday, June 21, 2018, 16:30: Short between
ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping |
|
679
|
Tuesday, August 21, 2018, 12:54 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connection configuration | Pin configuration between top 9-pin connector
on Source Tray and terminal in high voltage
rack. Measured 2018-08-21 by Aaron and Anders |
|
720
|
Friday, May 03, 2019, 08:30 |
Anders Mjos | | | | | | | In progress | Training | Training: Venting and pump down
Friday, May 03, 2019, 08:30: Turbo
pumps stopped. |
|
764
|
Friday, October 25, 2019, 12:04 |
Anders Mjos | | | | | | | Problems/Solutions | ISG:TP1A found stopped | Restarted TP. Note that CG1A is above 50
mTorr. CG1B shows 15 mTorr |
|
776
|
Friday, January 03, 2020, 11:56 |
Anders Mjos | | | | | | | Problems/Solutions | Upgrading BIAS Power Supply | A new power supply was installed today
by John Chow. Due to differences in pin configuration
of the controls, a change to the cabling |
|
779
|
Thursday, January 23, 2020, 16:05 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum tripped due to PLC/EPICS for for the new BIAS | Thursday, January 23, 2020, 16:05: Restarting
vacuum and TPs |
|
780
|
Friday, January 24, 2020, 16:01 |
Anders Mjos | | | | | | | Problems/Solutions | Upgrading BIAS Power Supply |
|
|
792
|
Tuesday, April 07, 2020, 10:53 |
Anders Mjos | | | | | | | | Vacuum loss / spike / Shutdown |
|
|
871
|
Monday, April 19, 2021, 14:58 |
Anders Mjos | | P2N-SIS | | | | | Problems/Solutions | Water leak on coil neg (H and F) | Determined on Friday April 16th that the
water leak was on the coil negative circuit.
This was determined by circulating water |
|
828
|
Friday, December 04, 2020, 13:39 |
Alexander Shkuratoff | | | | | | | Done | TM3 service tray prototype preparatory HV tests | Friday, December 04, 2020, 13:34
Vacuum is at 3.6e-6 Torr and possibly
still dropping. Starting HV tests with just |
|
831
|
Monday, December 14, 2020, 11:50 |
Alexander Shkuratoff | | | | | | | In progress | TM3 service tray prototype HV tests | Monday, December 14, 2020, 11:30
Switched off all breakers in HV cage.
Started HV testing of TM3 prototype. |
|