  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  153   Thursday, July 19, 2012, 11:32 Anders Mjos      DonePumping downThursday, July 19, 2012, 11:29: roughing
Thursday, July 19, 2012, 11:49: starting
turbos
  
  177   Friday, August 17, 2012, 12:53 Pierre Bricault      Done Test completed.
exel file on My Documents in folder
FEBIAD Test Aout2012/TestFEBIAD
 TestFEBIAD.xlsx 
  182   Friday, August 24, 2012, 08:28 Anders MjosNiO#1HP-FEBIADITETM4  DoneNiO#1 installed

    

       
            
  
  190   Friday, August 31, 2012, 11:12 Aurelia Laxdal HP-FEBIADITETM4  DoneFinished testing NiO#1Turned off the HV and the optics in the
first section. Couldn't turn off the optics
in the second section: left a message for
  
  191   Friday, August 31, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  DoneVenting vacuum chamber - source changeFriday, August 31, 2012, 11:39: Stopped
turbos.
Friday, August 31, 2012, 13:06: Venting.
  
  193   Tuesday, September 04, 2012, 08:11 Anders MjosNb#7LP-SISITWTM1  DoneNb#7 installed

    

       
            
  
  196   Friday, September 07, 2012, 13:10 Friedhelm AmesNb#7     Donemass scan finishedmass scan is finished saved as 
 
  Normal

 0
  
  
  199   Tuesday, September 11, 2012, 19:48 Friedhelm AmesNB#7HP-SIS    Donecool down finished, all source power supplies off.    
  204   Friday, September 14, 2012, 15:27 Anders MjosNb#7LP-SISITWTM1  DoneVentingTarget cooled down. Power supplies off.
Friday, September 14, 2012, 15:27:
Turbos off.
  
  212   Monday, September 24, 2012, 15:25 Anders Mjos      DoneTMS RP and TP started    
  214   Tuesday, September 25, 2012, 13:25 Anders Mjos      DoneStarted turbos after replaced roughing pump    
  224   Friday, October 26, 2012, 08:29 Anders MjosTiC#3LP-SISITWTM1  DoneTarget ready for conditioning

    

       
            
  
  228   Friday, November 02, 2012, 15:40 Aurelia Laxdal LP-SISITWTM1  DoneSiC#3 cooldown startedStarted the cooldown for SiC#3.   
  229   Monday, November 05, 2012, 09:47 Aurelia Laxdal LP-SISITWTM1  DoneTPS optics cannot be turned off. All TPS optics, with the exception of TPS:Q4
cannot be turned off. E-Fault#6395 for Controls.
Same for the TSG optics: CB1, VCB1
  
  230   Monday, November 05, 2012, 13:26 Aurelia Laxdal LP-SISITWTM1  DoneVenting the Test StandVenting the Test Stand.
TiC#3 will be ready to be removed
in few minutes. 
  
  231   Monday, November 05, 2012, 14:41 Anders MjosTiC#3LP-SISITWTM1  DoneTarget RemovedTarget looks OK. The right leg was a bit
much out of center and will be adjusted in
the lab.
  
  232   Monday, November 05, 2012, 14:42 Anders MjosTest SiCHP-FEBIAD    DonePumping downMonday, November 05, 2012, 14:41: Roughing
Monday, November 05, 2012, 14:58:
Started turbos
  
  245   Tuesday, December 11, 2012, 13:40 Sebastian RaederRFQ empty     DoneHeating test for Ion guide Laser ion sourcenew ion guide laser ion source installed.
Pure target container without targetmaterial
and without surface ion source.
 heatint_rfq_dec11_2012.PNGheatint_rfq_dec12_2012.PNG 
  250   Friday, December 14, 2012, 20:34 Sebastian RaederRFQ empty     Donepumping downFriday, December 14, 2012, ~ 17:00: start
roughing pumps
Friday, December 14, 2012, 20:33:
  
  253   Tuesday, December 18, 2012, 16:00 Sebastian RaederRFQ empty     Donetarget heatingTuesday, December 18, 2012, ~ 13:00 start
ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56:
 heatint_rfq_dec18_2012.PNGheatint_rfq_dec18_2012_detail.PNG 