Entry  Thursday, July 19, 2012, 11:32, Anders Mjos, , , , , , , Done, Pumping down 

Thursday, July 19, 2012, 11:29: roughing

Thursday, July 19, 2012, 11:49: starting turbos

Thursday, July 19, 2012, 11:54: TP1B at speed

Thursday, July 19, 2012, 11:58: TP1A timed out

Thursday, July 19, 2012, 11:58 TP1A restarted. at speed.

Thursday, July 19, 2012, 11:59: both turbos at speed. Vacuum. 2E-5

 

 

 

Entry  Friday, August 17, 2012, 12:53, Pierre Bricault, , , , , , , Done,  TestFEBIAD.xlsx

Test completed.

exel file on My Documents in folder FEBIAD Test Aout2012/TestFEBIAD

 Edited by Anders 2012-09-19, file attached.

    Reply  Friday, August 24, 2012, 08:28, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, NiO#1 installed 

Anders Mjos wrote:

Thursday, August 23, 2012, 11:38: NiO#1 installed.

Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.

Thursday, August 23, 2012, 11:54: Roughing.

Thursday, August 23, 2012, 12:12 : Starting turbos.

Thursday, August 23, 2012, 12:16 : TP1B at speed.

Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.

Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5

Thursday, August 23, 2012, 12:22: Vacuum at 2E-5

Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7

 Friday, August 24, 2012, 08:28: Opened water lines. No response in vacuum. Stable at 3.1E-7

Entry  Friday, August 31, 2012, 11:12, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , Done, Finished testing NiO#1 

Turned off the HV and the optics in the first section. Couldn't turn off the optics in the second section: left a message for Evgeniy.

Also TMS:RP2 is very noisy. Talked to Edi D. from vacuum group. He would work on it this afternoon. E-Fault#6282

Entry  Friday, August 31, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, Venting vacuum chamber - source change 

Friday, August 31, 2012, 11:39: Stopped turbos.

Friday, August 31, 2012, 13:06: Venting.

Friday, August 31, 2012, 13:23: Water lines purged.

Friday, August 31, 2012, 13:25 : Vented

    Reply  Tuesday, September 04, 2012, 08:11, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Done, Nb#7 installed 

Anders Mjos wrote:

Friday, August 31, 2012, 15:19: roughing

Friday, August 31, 2012, 15:39 : starting turbos

Friday, August 31, 2012, 15:44 : TP1B at speed

Friday, August 31, 2012, 15:48 : TP1A timed out

Friday, August 31, 2012, 15:48 : TP1A restarted. at speed.

Friday, August 31, 2012, 15:49 : both turbos at speed. Vacuum @2.7E-5

 Tuesday, September 04, 2012, 08:10: Opened cooling water. Vacuum stable @ 2.2E-7

Entry  Friday, September 07, 2012, 13:10, Friedhelm Ames, Nb#7, , , , , , Done, mass scan finished 

mass scan is finished saved as

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/plotdump-local-clean.txt_Sep7_12_13-01-51.txt

Entry  Tuesday, September 11, 2012, 19:48, Friedhelm Ames, NB#7, HP-SIS, , , , , Done, cool down finished, all source power supplies off. 
 
Entry  Friday, September 14, 2012, 15:27, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Done, Venting 

Target cooled down. Power supplies off.

Friday, September 14, 2012, 15:27: Turbos off.

Friday, September 14, 2012, 15:32: Water purged.

 Friday, September 14, 2012, 16:00: Venting

Friday, September 14, 2012, 16:26: Vented

Entry  Monday, September 24, 2012, 15:25, Anders Mjos, , , , , , , Done, TMS RP and TP started 
 
Entry  Tuesday, September 25, 2012, 13:25, Anders Mjos, , , , , , , Done, Started turbos after replaced roughing pump 
 
    Reply  Friday, October 26, 2012, 08:29, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , Done, Target ready for conditioning 

Anders Mjos wrote:

Thursday, October 25, 2012, 13:00: Roughing

Thursday, October 25, 2012, 13:19 : Turbos on

Thursday, October 25, 2012, 13:28 : Turbos at speed

Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T

 Friday, October 26, 2012, 08:29: Opened water. Vacuum stable at 1.8E-7 T

Entry  Friday, November 02, 2012, 15:40, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, SiC#3 cooldown started 

Started the cooldown for SiC#3.

Entry  Monday, November 05, 2012, 09:47, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, TPS optics cannot be turned off.  

All TPS optics, with the exception of TPS:Q4 cannot be turned off. E-Fault#6395 for Controls.

Same for the TSG optics: CB1, VCB1 and CBC.

Talked to Evgeniy and Kazuya. Optics are OFF now.

Entry  Monday, November 05, 2012, 13:26, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, Venting the Test Stand 

Venting the Test Stand.

TiC#3 will be ready to be removed in few minutes. 

Please note: water is still ON.

Entry  Monday, November 05, 2012, 14:41, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , Done, Target Removed 

Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.

The torque required to loosen the bolts were measured (from left to right):

Target legs: 48 and 30 in lbs

Tube htr: 25, 30 and 25 in lbs

Entry  Monday, November 05, 2012, 14:42, Anders Mjos, Test SiC, HP-FEBIAD, , , , , Done, Pumping down 

Monday, November 05, 2012, 14:41: Roughing

Monday, November 05, 2012, 14:58: Started turbos

Monday, November 05, 2012, 15:06 : Turbos at speed

Monday, November 05, 2012, 15:068: Vacuum at 2.2E-5 T

Wednesday, November 07, 2012, 08:26: Cooling water open. Vacuum stable at 1.8E-7 T

Entry  Tuesday, December 11, 2012, 13:40, Sebastian Raeder, RFQ empty, , , , , , Done, Heating test for Ion guide Laser ion source heatint_rfq_dec11_2012.PNGheatint_rfq_dec12_2012.PNG

new ion guide laser ion source installed. Pure target container without targetmaterial and without surface ion source.

Heat up to 580A for heat test of all components. Distance between target and repeller < 1mm

 

13:15 start heating TGHT, 1A per 30sec vacuum below 2E-7T

14:50 reached 200A at TGHT (1.5V readback same as frontpanel), vacuum now 2.9E-7T, proceed on to 400A

16:10 TGHT 350 A (setpoint, readback stopped at 269A) and 3.4V readback, sudden increase in vacuum from 4E-7T to 5.5E-7T and larger fluctuations, give it 10min

16:22 vacuum back to 4.4E-7T but some occasional vacuum spikes , proceed to 400A

17:00 at 400A / 4.13V, vacuum hit 2E-6T in between which delayed the heating, now decreasing, will goto 410A for half an hour and then 385A over night

Dec 12th

8:30 3.3E-7T Vac at 385A, goto 420A

8:50 7.5E-7T Vac at 420A, goto 450A

9:20 1.7E-6T Vac at 450A, goto 470A

10:00 1.5E-6T Vac at 470A / 4.5V

11:30 1.1E-6T at 520A/4.56V

Wednesday, December 12, 2012, 11:46   1.7E-6T at 550A/4.58V

Wednesday, December 12, 2012, 14:31 

     580A reached,  Vacuum dropped from 1.8E-6T to 5.8E-7T in 2h

     voltage read back is wrong as well Panel readings are 572A/6.99V (read back values in EPICS are 248A/ 4.6V) 

Wednesday, December 12, 2012, 14:47 6.5E-7T at 592A/ 7.31V (Panel readings)

Wednesday, December 12, 2012, 15:01 there is no contact of the target to HV GND (especially the repeller), the target can still be biased to 5V

Wednesday, December 12, 2012, 19:48     5.9E-7Tvacuum is slowly going down now

Thursday, December 13, 2012, 00:23   5.5E-7T, start cooling down

 

Short summary on results of first heating teest with the Ion Guide Ion source:

 

The Ion source is still in good shape, nothing was effected by the heat. Just some deposition in the repellers and the exit electrode

The capton wires used for  wiring the electrodes had some problem with heat and went black and got brittle - for the next test we will ad a Ta schield at the side of the source to prevent radiation inside the source.

Entry  Friday, December 14, 2012, 20:34, Sebastian Raeder, RFQ empty, , , , , , Done, pumping down 

Friday, December 14, 2012, ~ 17:00: start roughing pumps

Friday, December 14, 2012, 20:33: start turbo pumps

Friday, December 14, 2012, 20:42 : turbos at speed

Friday, December 14, 2012, 20:43 :  vacuum at 7.32E-6T

Monday, December 17, 2012, 12:53 vacuum at 1.77E-7T

Entry  Tuesday, December 18, 2012, 16:00, Sebastian Raeder, RFQ empty, , , , , , Done, target heating heatint_rfq_dec18_2012.PNGheatint_rfq_dec18_2012_detail.PNG

Tuesday, December 18, 2012, ~ 13:00 start ramping the TGHT current, vacuum at 1.7E-7T

Tuesday, December 18, 2012, 15:56: @ 250A, target is glowing, center block is cooler (can be inspected with a new hole in the heatshield lid), thermocouple is reading 224C, which is definitely colder than the temp from visual insepection, reading may be corrupted from contact to Heatschield

Tuesday, December 18, 2012, 23:11: target at 600A(593A/7.35V Panel reading), vacuum was up to 1.7E-6T, now 1.34E-6T. temperature reading was 405C which is quite away from glowing. Nevertheless, the center block of the target is visibly colder than the legs, while the center support is still way colder then the block. Thermocouple readback removed from HV cage. since the is a short cut the target (thermocouple?) the RFQ can be biased to 18V for suppression. everything locked up and stat HV test.

Wednesday, December 19, 2012, 00:14: target at 600A(593A/7.35V Panel reading), vacuum at 8.5E-7T, first HV test done, up to 30kV some occasional sparks. RFQ (1MHz , 40Vpp) without bias--> no signal, RFQ -9V biased --> 1.5E-11 on TMS:FC0

Wednesday, December 19, 2012, 01:17 : vacuum at7.7E-7T, start cooling down, was ~ 2.5h at max current.