ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
137
|
Monday, July 09, 2012, 12:57 |
Anders Mjos | | | | | | | Done | Vented | |
143
|
Thursday, July 12, 2012, 12:23 |
Anders Mjos | | | | | | | Done | TSH:SV5 bypass on | Thursday, July 12, 2012, 15:48: bypass removed |
144
|
Thursday, July 12, 2012, 13:41 |
Anders Mjos | | | | | | | Done | purging gas lines with air |
- gas lines purged with air for 60 min (through TSHUHV1 and TSHSV4).
- gas line allowed to fill with nitrogen to 300 torr and evacuated. repeated 3 times.
|
151
|
Thursday, July 19, 2012, 09:35 |
Anders Mjos | | | | | | | Done | Venting to investigate leak on front door | Thursday, July 19, 2012, 09:35: Switched off both turbos.
Thursday, July 19, 2012, 10:23: Venting
|
153
|
Thursday, July 19, 2012, 11:32 |
Anders Mjos | | | | | | | Done | Pumping down | Thursday, July 19, 2012, 11:29: roughing
Thursday, July 19, 2012, 11:49: starting turbos
Thursday, July 19, 2012, 11:54: TP1B at speed
Thursday, July 19, 2012, 11:58: TP1A timed out
Thursday, July 19, 2012, 11:58 TP1A restarted. at speed.
Thursday, July 19, 2012, 11:59: both turbos at speed. Vacuum. 2E-5
|
177
|
Friday, August 17, 2012, 12:53 |
Pierre Bricault | | | | | | | Done | | Test completed.
exel file on My Documents in folder FEBIAD Test Aout2012/TestFEBIAD
Edited by Anders 2012-09-19, file attached. |
182
|
Friday, August 24, 2012, 08:28 |
Anders Mjos | NiO#1 | HP-FEBIAD | ITE | TM4 | | | Done | NiO#1 installed |
Anders Mjos wrote: |
Thursday, August 23, 2012, 11:38: NiO#1 installed.
Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.
Thursday, August 23, 2012, 11:54: Roughing.
Thursday, August 23, 2012, 12:12 : Starting turbos.
Thursday, August 23, 2012, 12:16 : TP1B at speed.
Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.
Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5
Thursday, August 23, 2012, 12:22: Vacuum at 2E-5
Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7
|
Friday, August 24, 2012, 08:28: Opened water lines. No response in vacuum. Stable at 3.1E-7 |
190
|
Friday, August 31, 2012, 11:12 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | Done | Finished testing NiO#1 | Turned off the HV and the optics in the first section. Couldn't turn off the optics in the second section: left a message for Evgeniy.
Also TMS:RP2 is very noisy. Talked to Edi D. from vacuum group. He would work on it this afternoon. E-Fault#6282 |
191
|
Friday, August 31, 2012, 11:39 |
Anders Mjos | NiO#1 | HP-FEBIAD | ITE | TM4 | | | Done | Venting vacuum chamber - source change | Friday, August 31, 2012, 11:39: Stopped turbos.
Friday, August 31, 2012, 13:06: Venting.
Friday, August 31, 2012, 13:23: Water lines purged.
Friday, August 31, 2012, 13:25 : Vented |
193
|
Tuesday, September 04, 2012, 08:11 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | Done | Nb#7 installed |
Anders Mjos wrote: |
Friday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 : starting turbos
Friday, August 31, 2012, 15:44 : TP1B at speed
Friday, August 31, 2012, 15:48 : TP1A timed out
Friday, August 31, 2012, 15:48 : TP1A restarted. at speed.
Friday, August 31, 2012, 15:49 : both turbos at speed. Vacuum @2.7E-5
|
Tuesday, September 04, 2012, 08:10: Opened cooling water. Vacuum stable @ 2.2E-7 |
196
|
Friday, September 07, 2012, 13:10 |
Friedhelm Ames | Nb#7 | | | | | | Done | mass scan finished | mass scan is finished saved as
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/plotdump-local-clean.txt_Sep7_12_13-01-51.txt

|
199
|
Tuesday, September 11, 2012, 19:48 |
Friedhelm Ames | NB#7 | HP-SIS | | | | | Done | cool down finished, all source power supplies off. | |
204
|
Friday, September 14, 2012, 15:27 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | Done | Venting | Target cooled down. Power supplies off.
Friday, September 14, 2012, 15:27: Turbos off.
Friday, September 14, 2012, 15:32: Water purged.
Friday, September 14, 2012, 16:00: Venting
Friday, September 14, 2012, 16:26: Vented |
212
|
Monday, September 24, 2012, 15:25 |
Anders Mjos | | | | | | | Done | TMS RP and TP started | |
214
|
Tuesday, September 25, 2012, 13:25 |
Anders Mjos | | | | | | | Done | Started turbos after replaced roughing pump | |
224
|
Friday, October 26, 2012, 08:29 |
Anders Mjos | TiC#3 | LP-SIS | ITW | TM1 | | | Done | Target ready for conditioning |
Anders Mjos wrote: |
Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19 : Turbos on
Thursday, October 25, 2012, 13:28 : Turbos at speed
Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T
|
Friday, October 26, 2012, 08:29: Opened water. Vacuum stable at 1.8E-7 T |
228
|
Friday, November 02, 2012, 15:40 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | SiC#3 cooldown started | Started the cooldown for SiC#3. |
229
|
Monday, November 05, 2012, 09:47 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | TPS optics cannot be turned off. | All TPS optics, with the exception of TPS:Q4 cannot be turned off. E-Fault#6395 for Controls.
Same for the TSG optics: CB1, VCB1 and CBC.
Talked to Evgeniy and Kazuya. Optics are OFF now. |
230
|
Monday, November 05, 2012, 13:26 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | Venting the Test Stand | Venting the Test Stand.
TiC#3 will be ready to be removed in few minutes.
Please note: water is still ON. |
231
|
Monday, November 05, 2012, 14:41 |
Anders Mjos | TiC#3 | LP-SIS | ITW | TM1 | | | Done | Target Removed | Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.
The torque required to loosen the bolts were measured (from left to right):
Target legs: 48 and 30 in lbs
Tube htr: 25, 30 and 25 in lbs |
|