  887   Tuesday, July 27, 2021, 12:57 Fernando Maldonado LP-FEBIAD  41790-1044378-5FailedFEBIAD parameter scan - efficiency measurementsAssembly has new gas tube to the
target for better fit and clearance to the
HS.
  
  888   Wednesday, July 28, 2021, 08:48 Fernando Maldonado LP-FEBIAD  41790-1044378-5FailedFEBIAD parameter scan - efficiency measurementsModified spiral tube from VCR to
counteract torque towards the HS. Now points
towards TBHT.
  
  889   Friday, July 30, 2021, 15:34 Carla Babcock      FailedTSG:RP1 failureTP1A tripped off on Fernando, seems the
backing pressure got too high. Even with
PV1 closed the RP1 pump could not get below
  
  960   Wednesday, March 29, 2023, 12:22 Aaron SchmidtTiC#5LP-FEBIADITETM444692-745235-20FailedConditioning TiC#5Wednesday, March 29, 2023, 09:15: Roughing.
Wednesday, March 29, 2023, 12:22:
TP1B on.
 TiC#5_conditioning.docx 
  8   Tuesday, September 20, 2011, 19:00 Aurelia LaxdalTaC#1LP-SISITETM138634-636833-6DoneFinished testing TaC#1Tuesday, September 20, 2011:
Did another mass scan today at 5:40.
Saved as: plotdump-local-clean.txt Sept 20
  
  17   Friday, September 30, 2011, 18:03 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8DoneFinished testing SiC#26 at the Test StandToday, did a did a mass scan: plotdump-local-clean.txt
Sep30 11 12-20-08.txt
Optimized a bit the tune with Friedhelm,
  
  18   Monday, October 03, 2011, 10:53 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8DoneTarget is ready to be removed. Turned off the HV and locked up the transformer.
Isolated the ion source box. The target is
under vacuum and the water is still on.
  
  19   Monday, October 03, 2011, 13:56 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneVenting

    

       
            
  
  20   Monday, October 03, 2011, 14:46 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget stored under vacuum

    

       
            
  
  21   Wednesday, October 12, 2011, 13:14 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget removed

    

       
            
  
  34   Friday, February 17, 2012, 10:27 Aurelia Laxdal      DoneStarted the ArchiversStarted both ISACT and SOURCES Archivers.   
  57   Wednesday, March 07, 2012, 09:27 Friedhelm AmesNb#6     Donewater cooling startedwater cooling line valves opened. No response
on vacuum TSG:IG1 3.5e-7 T
  
  96   Thursday, May 17, 2012, 08:36 Anders MjosSiC#27HP-SISITETM4  DoneTarget removedThursday, May 17, 2012, 08:36: Turbo pumps
switched off in preparation of target removal.
Thursday, May 17, 2012, 08:51: Purging
  
  103   Monday, June 04, 2012, 10:51 Anders MjosTa#38LP-SISITWTM1  DoneVenting chamber

    

       
            
  
  105   Tuesday, June 26, 2012, 16:06 Anders Mjos      DoneVented

    

       
            
  
  135   Friday, July 06, 2012, 15:36 Friedhelm Ames      Doneswitched everything offswitched everything off to prepare for
scheduled power outage on Monday
  
  137   Monday, July 09, 2012, 12:57 Anders Mjos      DoneVented    
  143   Thursday, July 12, 2012, 12:23 Anders Mjos      DoneTSH:SV5 bypass onThursday, July 12, 2012, 15:48: bypass
removed
  
  144   Thursday, July 12, 2012, 13:41 Anders Mjos      Donepurging gas lines with air
    gas lines purged with air for
60 min (through TSHUHV1 and TSHSV4).

   gas line allowed to fill with nitrogen
  
  151   Thursday, July 19, 2012, 09:35 Anders Mjos      DoneVenting to investigate leak on front doorThursday, July 19, 2012, 09:35: Switched
off both turbos.
Thursday, July 19, 2012, 10:23: Venting
  