Thursday, November 04, 2021, 11:55, Fernando Maldonado, , , , , , , Done, Opening vacuum chamber for thesis pictures :p
|
Thursday, November 04, 2021, 11:54: Venting
water loop removed
Thursday, November 04, 2021, 13:39: Roughing |
Thursday, December 06, 2012, 08:41, Anders Mjos, , , , , , , , Opened cooling water
|
Vacuum stable at 2.8E-7 T |
Tuesday, February 19, 2013, 08:28, Anders Mjos, , , , , , , Problems/Solutions, Opened all backing valves after scheduled site wide air outage
|
|
Wednesday, April 18, 2012, 12:19, Anders Mjos, , , , , , , Problems/Solutions, Noise from roughing pump TSGRP1
|
Wednesday, April 18, 2012, 12:15: Blanked off cooling lines. Chamber ready to be pumped down.
Wednesday, April 18, 2012, 12:16: TSGRP1 makes unusual noise when attempting to pump down vacuum chamber. Roughing aborted for now. Edi Dalla Valle
is informed. He will have a look at it after lunch. |
Wednesday, April 18, 2012, 13:09, Anders Mjos, , , , , , , Problems/Solutions, Noise from roughing pump TSGRP1
|
Wednesday, April 18, 2012, 13:08 Anders Mjos wrote:
Wednesday, April 18, 2012, 12:15: Blanked off cooling lines. Chamber ready to be |
Thursday, April 09, 2015, 11:21, Anders Mjos, , , , , , , Problems/Solutions, No RGA communcations
|
RGA stopped working. Likely after a spark yesterday. |
Wednesday, December 02, 2015, 14:50, Anders Mjos, , , , , , , Problems/Solutions, Nitrogen supply for venting temporarely from bottle
|
No supply of N through the piping due to work on the N tanks. Confirmed with Geoff Hodgson. ISIS supply is shut off. Using a bottle until the supply
is returned.
Monday, January 11, 2016 |
Friday, November 08, 2019, 14:21, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-9, In progress, Nitrogen Bottle leak test
|
Friday, November 01, 2019, 14:00: Nitrogen bottle installed. Purged waterlines HS / FS#5. Purge done in conjunction with SiC#38
4.8 Purity
35-40 PSI pressure. |
Thursday, August 30, 2012, 14:34, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 updates
|
Normal
0
false
false
false
EN-US
X-NONE
X-NONE
|
Thursday, August 23, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 installed
|
Thursday, August 23, 2012, 11:38: NiO#1 installed.
Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.
Thursday, August 23, 2012, 11:54: Roughing. |
Friday, August 24, 2012, 08:28, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, NiO#1 installed
|
Anders Mjos wrote:
Thursday, August 23, 2012, 11:38: NiO#1 installed. |
Wednesday, August 29, 2012, 11:34, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 heating startup & few checks
|
Friedhelm checked the voltage across R4 from ISK4563D-rev2.pdf. It shows 50 kOhms with the power supplies off and everything connected according to the
drawing. With the Anode PS On and set at 20V, we could see the same readback on EPICS and on the meter.
Then started the heater ramping: auto ramp 2A/min. |
Thursday, August 30, 2012, 16:51, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 cooldown started
|
Started the cooldown. |
Tuesday, September 01, 2020, 14:01, Aaron Schmidt, , , , , , , Done, New tubing installed on loops
|
Tuesday, September 01, 2020, 14:00:
New tubing installed.
Blue on FS#4 loop (A)(B) |
Monday, September 30, 2013, 15:19, Anders Mjos, , , , , , , Problems/Solutions, New purging valves installed on Heat Shield water circuit
|
The Heat Shield circuit can now be separately purged for water. Use valves on heat shield circuit to purge the lines for target exchanges from now on.
All paddle wheels have been rotated to allow trapped air to escape the system more easily. |
Thursday, September 17, 2015, 14:05, Anders Mjos, Test Target, LP-SIS, , , , , In progress, New centre block test
|
T1
Probe Inside Target
Left
T2
Centre block attached outside
|
Wednesday, September 30, 2015, 16:28, Anders Mjos, Test Target wrapped with heat shields, LP-SIS, , , , , In progress, New centre block test
|
T1
Probe Inside Target Left
T2
|
Wednesday, December 02, 2015, 15:30, Anders Mjos, , LP-SIS, , , , , , New centre block test
|
New 2x 9-pin connector grounding tool with gripper installed.
Wednesday, December 02, 2015, 15:30: Roughing
Wednesday, December 02, 2015, 17:14: Starting turbos |
Tuesday, December 06, 2022, 11:20, Aaron Schmidt, , HP-FEBIAD-CTL, , , 43104-2, 45235-12, In progress, New anode routed FEBIAD Tests
|
Thermocouples installed:
O - O
O - Anode |
Friday, December 16, 2022, 10:32, Aaron Schmidt, , HP-FEBIAD-CTL, , , 43104-2, 45235-12, In progress, New anode routed FEBIAD Test - 3
|
Thermocouples installed (X):
O - O
O - Anode |
|