  9   Friday, September 23, 2011, 15:38 Rick Maharaj       test stand ventedTest stand vented   
  22   Thursday, October 13, 2011, 12:33 Rick MaharajTraining       Test stand ventedtest stand vented   
  85   Tuesday, May 15, 2012, 07:39 Rick MaharajSic #27HP-SISITETM4  In progressWater on at test standThe vacuum on TSGIG1 reads 2.85e-07. Turing
on water on teststand and observing any changes
in vacuum pressure.
  
  86   Tuesday, May 15, 2012, 08:08 Rick Maharajsic#27      Turbos offTarget needs to be removed form teststand
to remove heatshielding around target oven.
The chamber will be vented, water circuits
  
  87   Tuesday, May 15, 2012, 08:15 Rick Maharaj       Test Stand chamber venting    
  88   Tuesday, May 15, 2012, 08:16 Rick Maharaj       Water circuits flushed    
  89   Tuesday, May 15, 2012, 08:42 Rick Maharaj       target removed    
  90   Tuesday, May 15, 2012, 09:46 Rick Maharaj       target reinstalled pumping started    
  159   Friday, August 10, 2012, 14:08 Rick Maharaj       Gas line pumpGas line vacuum pump reinstalled after
fitting was modified to receive a standard
swagelok connector. The vacuum line was plumbed
  
  300   Tuesday, May 21, 2013, 10:09 Rick Maharaj       Test stand VentedTurbos stopped, waterlines flushed, chamber
vented
  
  301   Tuesday, May 21, 2013, 14:58 Rick MaharajCTL Febiad      CTL Febiad InstalledCeramic coated coil development target
removed. CTL Febiad target installed.
Roughing chamber.
  
  302   Tuesday, May 21, 2013, 15:14 Rick MaharajCTL Febiad      Turbos StartedTurbos started   
  303   Tuesday, May 21, 2013, 15:50 Rick MaharajCTL Febiad      Cooling Water Turned OnCooling water turned on when vacuum reading
5.54e-06 T. Vacuum steadily increasing. Ion
gauge reading steadily decreasing now reading
  
  342   Tuesday, October 22, 2013, 15:20 Rick Maharaj      Problems/SolutionsTarget Heater Conductor Block Insulators ReplacedThe Conductor insulating blocks - ITD053C
and ITD054C - that secure the target heater
and coil conductor blocks were replaced.
 Source_Tray_TGHT_and_COIL_insulators_replaced_2013-10.pdf 
  363   Wednesday, March 12, 2014, 10:20 Rick Maharaj      Donereplace heatshield waterline loopA new Heatshield waterline loop was manufactured
and installed to replace the old one which
had a leak.
  
  371   Friday, April 04, 2014, 17:01 Rick MaharajUC#9LP-SISITWTM1 39230-3DoneConditioning Heatshield for UCx#9Friday, April 04, 2014, 16:26: Heatshield/Ionsource
assembly for UC LP SIS  installed in
test stand with Ta tube as heat load.
  
  36   Tuesday, February 28, 2012, 10:29 Pierre Bricault LP-FEBIAD    In progressTest FEBIAD at ISAC test statnd    
  37   Tuesday, February 28, 2012, 11:04 Pierre Bricault         Calibrating the gas valve   
  53   Tuesday, March 06, 2012, 15:15 Pierre Bricault HP-SIS     ISAC test stand two turbos replacedVac group has replaced the two turbo pumps.   
  54   Tuesday, March 06, 2012, 15:17 Pierre Bricault       ISAC test standStart turbo pumps at 1514H   