  286   Thursday, March 21, 2013, 15:05 Sebastian RaederSiC#28 ITETM4  Done2nd heating of SiC#28 LP-RFQ - short resolved

 

Anders Mjos wrote:

Tuesday, March 19, 2013, 12:32 : Turbos off (vaccum at 2E-7 Torr)

Tuesday, March 19, 2013, 13:35: Venting

Target SiC#28 LP-RFQ inserted


By Sebastian (SR) & Henning

modification of 9 Pin connector needed to match wiring in TM4 (see separate e-log entry)

Tuesday, March 19, 2013, 18:32 : started roughing - SR

Tuesday, March 19, 2013, 18:52: started turbos - SR

Tuesday, March 19, 2013, 18:57: TSGIP1 on - SR

Tuesday, March 19, 2013, 19:00: turbos at speed - SR

Tuesday, March 19, 2013, 19:02: vacuum at 1.68E-5T


By Anders

Wednesday, March 20, 2013, 08:18: Opened cooling water. Vacuum stable at 6.8E-7 Torr


By Sebastian (SR) & Henning

Wednesday, March 20, 2013, 11:39: 9PIN connector in HV cage connected

        4,5,6,9 on GND 1,2 to RF, 7,8,RFoffest,Source for now also on GND

        RF: 800kHz, 20Vampl, 0.128mA

        HV cage locked up for heating

Wednesday, March 20, 2013, 16:42: heating is taken care of by ISAC operations, now at 300A / 3V TGHT  and 250A / 1.47V TBHT reading on the panel is really close

        Friedhelm restarted some of the CANBUS ports, since not all optics were working properly

Thursday, March 21, 2013, 10:53 start cooling down

       Vacuum not perfect was around 2E-6T, over nigth not full current

       Suppression tested yesterday: full beam (SRC +3V, others GND) was 40nA, while no signal on FB0B with SRC +3V, IGOffset&Exit +25V

       !!!!! but short on #7 --> 2nd Repeller, was OK when tested, after some minutes on 25V short was there, reading now (Thursday, March 21, 2013, 10:58 ) <1OHM, will be checked while heating down

       Magnet had wrong polarity - so no mass scans yesterday evening, Friedhelm looked into this this morning

      Mass scan only for good transmission mode (SRC +3V) this morning - see attached scan (seen Na, Al, K, Ca, Cr, Rb, Sr, Cs and Ba)

Thursday, March 21, 2013, 12:26: stopped turbos

     #7 still short

 


By Anders

Thursday, March 21, 2013, 13:25: Venting

 

   Thursday, March 21, 2013, 14:46: started roughing

                Target was out, visibly inspected, nothing to be seen, no short on the target - wiring of the 9Pin connector shows short circuit inside vacuum chamber

                Wires removed - short could be reproduced with the strandings of the shielding  from the kapton twisted pairs going into the peek connector

               wire shieldings now fixed to position further away with Cu wire

               all wires against ground and each other tested for holding 250V - all fine

               everything reconnected and target put in, torcked w 120 inch pounds

Thursday, March 21, 2013, 15:05 : turbos started

Thursday, March 21, 2013, 15:14: turbos at speed

Thursday, March 21, 2013, 15:17: vacuum at 1.4E-5T

Thursday, March 21, 2013, 18:01: vacuum at 1.45E-6T opening water lines - vacuum is stable

Thursday, March 21, 2013, 19:19 : vacuum at 8.6E-7T - start ramping heater to 580A / 250 A

Friday, March 22, 2013, 00:08: target is heated full way up

           setpoint 570A and 7.250V voltage limit

           readback 564.1A and 7.201V  --> needs more voltage than the normal target !

           vacuum at 1.2E-6T

Friday, March 22, 2013, 15:15: vacuum at 5.4E-7T

         preparing for HV test and mass scan

 

        transmission mode: Source +3V, everything else on GND: 12nA - mass scan see attachment

       suppression mode 1: Source -15V, everything else on GND: 20pA - mass scan see attachment

       suppression mode 2: Source +3V, everything else on +25V: <1pA - FC0 current while biasing see attachment

 

       NOTE:  the legs of the target are glowing differently, the left leg (view from the lid side onto the target unit) glows brighter, this side was open during the sintering process of the SiC and needed more alignment at the jig --> see attached picture

       NOTE2: there is a slight increase in TGHT voltage over time: in ~ 22h from 7.201V to 7.216V

 

Friday, March 22, 2013, 21:33 : vacuum at 4.8E-7, start ramping down

Friday, March 22, 2013, 22:47: heaters down and turned off, vacuum at 2.7E-7T

Monday, March 25, 2013, 00:15: vacuum at 1.4E-7T, IG off, turbos off


By Anders

Monday, March 25, 2013, 08:18: Venting

Monday, March 25, 2013, 08:33: Purging water lines

Monday, March 25, 2013, 08:42: Target removed

Attachment 1: 20130322_heating.png
20130322_heating.png
Attachment 2: 20130322_massscan_transmission.png
20130322_massscan_transmission.png
Attachment 3: 20130322_massscan_suppression1.png
20130322_massscan_suppression1.png
Attachment 4: 20130322_suppression2.png
20130322_suppression2.png
Attachment 5: legs.JPG
legs.JPG
  288   Monday, March 25, 2013, 16:50 Sebastian Raeder      Problems/SolutionsRFQ powersupplies removed - Anode PS still connected to ground

The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.

 

NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off

  289   Thursday, March 28, 2013, 13:55 Anders MjosEmpty     In progressPumping down empty chamber

Thursday, March 28, 2013, 13:55: Roughing

Thursday, March 28, 2013, 14:36: Starting turbos (vacuum at ~0.100 T)

Thursday, March 28, 2013, 14:44: Both turbos at speed

Thursday, March 28, 2013, 14:46: Vacuum at 5.2E-6 Torr

  290   Tuesday, April 02, 2013, 15:19 Anders Mjos      Problems/SolutionsWater leak at MB1 Power Supply

See Cyclotron e-fault 6637

 

  291   Tuesday, April 09, 2013, 16:21 Anders Mjos      Problems/SolutionsWater leak at MB1 Power Supply

 

Anders Mjos wrote:

See Cyclotron e-fault 6637

 

 

Tuesday, April 09, 2013:

 Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.

Wednesday, April 10, 2013:

Removed the remaining water in the P/S rack.

  293   Thursday, April 11, 2013, 08:49 Anders Mjos      Problems/SolutionsMB1 Power Supply operational

 

Anders Mjos wrote:

 

Anders Mjos wrote:

See Cyclotron e-fault 6637

 

 

Tuesday, April 09, 2013:

 Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.

Wednesday, April 10, 2013:

Removed the remaining water in the P/S rack.

Thursday, April 10, 2013:

The power supply is again operational. See e-fault entry above for details.

  294   Tuesday, April 16, 2013, 08:59 Anders Mjos      Problems/SolutionsTMS:TP2 found in timeout / fault state

Tuesday, April 16, 2013, 08:59

The turbo was found in fault state this morning. Based on data from IG6 the pump stopped around midnight.

An attempt to restart the pump will be made after the conditioning of Ta#40 is complete later today.

The TP has recently been replaced:

https://elog.triumf.ca/TIS/Test-Stand/280


Tuesday, April 16, 2013, 16:23: TMS:TP2 restarted I=1.0A P=21W T=29C @ 42kRPM


Wednesday, April 17, 2013, 16:19: TMS:TP2 I=0.8A P=14W T=29C @ 42kRPM

Attachment 1: TMS-TP2_Fault.png
TMS-TP2_Fault.png
Attachment 2: TMS-IG6-RDVAC.png
TMS-IG6-RDVAC.png
  297   Friday, May 03, 2013, 14:32 Anders Mjos      Problems/SolutionsCathode PS cable reconnected

 

Sebastian Raeder wrote:

The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.

 

NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off

 

Friday, May 03, 2013

The anode cable has been reconnected to F/T J and the 100k resistor placed between L and J. Q is now grounded to L. See dwg ISK4523

Tuesday, May 07, 2013

The cathode cable has been reconnected to F/T B and the 100k resistor removed between L and J. See dwg ISK4563 Rev 3

 

Attachment 1: ISK4523D-rev4.pdf
ISK4523D-rev4.pdf
Attachment 2: ISK4563D-rev3.pdf
ISK4563D-rev3.pdf
  298   Wednesday, May 08, 2013, 08:52 Anders Mjos      Problems/SolutionsTMS and TPS P/S problems

Wednesday, May 08, 2013, 08:52: TMS:CB5 found off this morning. Switched back on.

Wednesday, May 08, 2013, 12:14: Lost the following devices during a mass scan

TMS:VCB5
TMS:OCT3
TPS:Q4
TPS:Q2
TPS:Q1
TSG:CBC

All devices but TPS:Q1 could be completely restored.

Wednesday, May 08, 2013, 12:49: TPS:Q1 restored by lowering and increasing the voltage

 

  299   Thursday, May 09, 2013, 15:28 Anders Mjos      Problems/SolutionsTSGRP1 showing signs of reduced performance

TSG:CG1A and TSG:CG1B shows an increase in vacuum.

See attached archived data for details.

Attachment 1: Archiver.PNG
Archiver.PNG
  300   Tuesday, May 21, 2013, 10:09 Rick Maharaj       Test stand Vented

Turbos stopped, waterlines flushed, chamber vented

  301   Tuesday, May 21, 2013, 14:58 Rick MaharajCTL Febiad      CTL Febiad Installed

Ceramic coated coil development target removed. CTL Febiad target installed.

Roughing chamber.

  302   Tuesday, May 21, 2013, 15:14 Rick MaharajCTL Febiad      Turbos Started

Turbos started

  303   Tuesday, May 21, 2013, 15:50 Rick MaharajCTL Febiad      Cooling Water Turned On

Cooling water turned on when vacuum reading 5.54e-06 T. Vacuum steadily increasing. Ion gauge reading steadily decreasing now reading 4.48e-06 T.

  304   Tuesday, May 21, 2013, 19:38 Friedhelm Ames      Problems/Solutionsmagnet power supply water leak

The cyclotron operators discovered a water leak in the magnet power supply. The water is valved off and the power is off. A fault report has been issued to the power supplies group.

  305   Friday, May 24, 2013, 15:13 Aurelia LaxdalCLT FEBIAD      CLT FEBIAD conditioning started

Purged the gas lines, turned on the HV and started the heaters for CLT FEBIAD: TGHT up to 580A and TBHT up to 230A.

  306   Tuesday, May 28, 2013, 09:51 Anders Mjos      Problems/SolutionsArchivers restarted

COIL and ANODE data added to ISACT Data Archiver

  307   Tuesday, May 28, 2013, 09:53 Anders Mjos      Problems/SolutionsTPS:Q4 and TPS:Q2 restarted
  309   Monday, June 03, 2013, 15:00 Anders Mjos      Problems/SolutionsSOURCES ARCH Restarted

SOURCES ARCH was found not running

  310   Friday, June 07, 2013, 08:47 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off

Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1