ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
288
|
Monday, March 25, 2013, 16:50 |
Sebastian Raeder | | | | | | | Problems/Solutions | RFQ powersupplies removed - Anode PS still connected to ground |
The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off |
289
|
Thursday, March 28, 2013, 13:55 |
Anders Mjos | Empty | | | | | | In progress | Pumping down empty chamber |
Thursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36: Starting turbos (vacuum at ~0.100 T)
Thursday, March 28, 2013, 14:44: Both turbos at speed
Thursday, March 28, 2013, 14:46: Vacuum at 5.2E-6 Torr |
290
|
Tuesday, April 02, 2013, 15:19 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak at MB1 Power Supply |
See Cyclotron e-fault 6637
|
291
|
Tuesday, April 09, 2013, 16:21 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak at MB1 Power Supply |
Tuesday, April 09, 2013:
Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.
Wednesday, April 10, 2013:
Removed the remaining water in the P/S rack. |
293
|
Thursday, April 11, 2013, 08:49 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 Power Supply operational |
Anders Mjos wrote: |
Tuesday, April 09, 2013:
Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.
Wednesday, April 10, 2013:
Removed the remaining water in the P/S rack.
|
Thursday, April 10, 2013:
The power supply is again operational. See e-fault entry above for details. |
294
|
Tuesday, April 16, 2013, 08:59 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP2 found in timeout / fault state |
Tuesday, April 16, 2013, 08:59
The turbo was found in fault state this morning. Based on data from IG6 the pump stopped around midnight.
An attempt to restart the pump will be made after the conditioning of Ta#40 is complete later today.
The TP has recently been replaced:
https://elog.triumf.ca/TIS/Test-Stand/280
Tuesday, April 16, 2013, 16:23: TMS:TP2 restarted I=1.0A P=21W T=29C @ 42kRPM
Wednesday, April 17, 2013, 16:19: TMS:TP2 I=0.8A P=14W T=29C @ 42kRPM |
Attachment 1: TMS-TP2_Fault.png
|
|
Attachment 2: TMS-IG6-RDVAC.png
|
|
297
|
Friday, May 03, 2013, 14:32 |
Anders Mjos | | | | | | | Problems/Solutions | Cathode PS cable reconnected |
Sebastian Raeder wrote: |
The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off
|
Friday, May 03, 2013
The anode cable has been reconnected to F/T J and the 100k resistor placed between L and J. Q is now grounded to L. See dwg ISK4523
Tuesday, May 07, 2013
The cathode cable has been reconnected to F/T B and the 100k resistor removed between L and J. See dwg ISK4563 Rev 3
|
Attachment 1: ISK4523D-rev4.pdf
|
|
Attachment 2: ISK4563D-rev3.pdf
|
|
298
|
Wednesday, May 08, 2013, 08:52 |
Anders Mjos | | | | | | | Problems/Solutions | TMS and TPS P/S problems |
Wednesday, May 08, 2013, 08:52: TMS:CB5 found off this morning. Switched back on.
Wednesday, May 08, 2013, 12:14: Lost the following devices during a mass scan
TMS:VCB5
TMS:OCT3
TPS:Q4
TPS:Q2
TPS:Q1
TSG:CBC
All devices but TPS:Q1 could be completely restored.
Wednesday, May 08, 2013, 12:49: TPS:Q1 restored by lowering and increasing the voltage
|
299
|
Thursday, May 09, 2013, 15:28 |
Anders Mjos | | | | | | | Problems/Solutions | TSGRP1 showing signs of reduced performance |
TSG:CG1A and TSG:CG1B shows an increase in vacuum.
See attached archived data for details. |
Attachment 1: Archiver.PNG
|
|
300
|
Tuesday, May 21, 2013, 10:09 |
Rick Maharaj | | | | | | | | Test stand Vented |
Turbos stopped, waterlines flushed, chamber vented |
301
|
Tuesday, May 21, 2013, 14:58 |
Rick Maharaj | CTL Febiad | | | | | | | CTL Febiad Installed |
Ceramic coated coil development target removed. CTL Febiad target installed.
Roughing chamber. |
302
|
Tuesday, May 21, 2013, 15:14 |
Rick Maharaj | CTL Febiad | | | | | | | Turbos Started |
Turbos started |
303
|
Tuesday, May 21, 2013, 15:50 |
Rick Maharaj | CTL Febiad | | | | | | | Cooling Water Turned On |
Cooling water turned on when vacuum reading 5.54e-06 T. Vacuum steadily increasing. Ion gauge reading steadily decreasing now reading 4.48e-06 T. |
304
|
Tuesday, May 21, 2013, 19:38 |
Friedhelm Ames | | | | | | | Problems/Solutions | magnet power supply water leak |
The cyclotron operators discovered a water leak in the magnet power supply. The water is valved off and the power is off. A fault report has been issued to the power supplies group. |
305
|
Friday, May 24, 2013, 15:13 |
Aurelia Laxdal | CLT FEBIAD | | | | | | | CLT FEBIAD conditioning started |
Purged the gas lines, turned on the HV and started the heaters for CLT FEBIAD: TGHT up to 580A and TBHT up to 230A. |
306
|
Tuesday, May 28, 2013, 09:51 |
Anders Mjos | | | | | | | Problems/Solutions | Archivers restarted |
COIL and ANODE data added to ISACT Data Archiver |
307
|
Tuesday, May 28, 2013, 09:53 |
Anders Mjos | | | | | | | Problems/Solutions | TPS:Q4 and TPS:Q2 restarted |
|
309
|
Monday, June 03, 2013, 15:00 |
Anders Mjos | | | | | | | Problems/Solutions | SOURCES ARCH Restarted |
SOURCES ARCH was found not running |
310
|
Friday, June 07, 2013, 08:47 |
Anders Mjos | | | | | | | Problems/Solutions | TPS:Q2, TPSQ4 and TMS:MB1 found off |
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1 |
311
|
Monday, June 10, 2013, 08:16 |
Anders Mjos | | | | | | | Problems/Solutions | TPS:Q2, TPSQ4 and TMS:MB1 found off |
Anders Mjos wrote: |
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1
|
Monday, June 10, 2013, 08:16: Restarted Q2 and Q4 |