432
|
Tuesday, March 24, 2015, 09:50 |
Anders Mjos | | | | | | | In progress | Empty chamber | Roughed down on Friday 20th
Tuesday, March 24, 2015, 09:49: Turbos
started |
|
434
|
Thursday, April 09, 2015, 11:21 |
Anders Mjos | | | | | | | Problems/Solutions | No RGA communcations | RGA stopped working. Likely after a spark
yesterday. |
|
435
|
Monday, April 13, 2015, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | ISAC Test Stand Optical elements power supply drop out | See e-fault 8027
Monday, April 13, 2015
Kevin and Graham are working on it |
|
436
|
Wednesday, April 22, 2015, 13:17 |
Anders Mjos | | | | | | | | Source Tray Removed | by Mico, Dan and Anders |
|
437
|
Friday, April 24, 2015, 12:25 |
Anders Mjos | | | | | | | Problems/Solutions | Backing line pressure high | TSG:RP1 backing line pressure is >200
mT. An e-fault has been submitted to have
the roughing pump replaced. |
|
439
|
Monday, May 04, 2015, 09:51 |
Anders Mjos | | | | | | | Problems/Solutions | FEBIAD Coil power supply replaced | Power supply did not work after high
voltage conditioning. On Friday May 1st John
Chow replaced the power supply with a |
|
440
|
Friday, May 08, 2015, 09:07 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS lost contact with the PLC | Everything shut down, while EPICS showed
everyhing to be on.
Controls group (Dave Morris) has |
|
442
|
Tuesday, May 19, 2015, 19:10 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS white out | Likely caused by the PLC. e-fault
8139
Wednesday, May 20, 2015 |
|
443
|
Thursday, May 21, 2015, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured service cap coil connections | The service cap has been reconfigured
(colling and electric) to be compatible with
the TM2 Source tray. Coil- is E & F , |
|
445
|
Thursday, May 21, 2015, 17:38 |
Anders Mjos | | | | | | | Problems/Solutions | Installed equipment for measuring outgassing rate | A gauge and a valve was installed
on the roughing line to the large turbo pump |
|
448
|
Wednesday, June 03, 2015, 09:35 |
Anders Mjos | | | | | | | Problems/Solutions | PLC upgrade | Wednesday, June 03, 2015, 09:35: TP6 and
TP2 off
Wednesday, June 03, 2015, 10:15: |
|
449
|
Monday, June 15, 2015, 14:07 |
Anders Mjos | | | | | | | Problems/Solutions | Test Stand Source Tray installed | Monday, June 15, 2015
Remaining items to do
ANODE wire not yet attached
|
|
451
|
Monday, June 22, 2015, 15:49 |
Anders Mjos | | | | | | | In progress | Installed new 9-pin feed through | No wires connected yet.
Monday, June 22, 2015, 15:48: Roughing
Tuesday, June 23, 2015, 09:05: |
|
453
|
Monday, June 29, 2015, 16:51 |
Friedhelm Ames | | | | | | | Problems/Solutions | TSG:BV1B closed | found TSG:TP1B tripped off. Closed TSG:BV1B
as pressure at TSG:iG1 was rising. Pressure
is coming down again. |
|
455
|
Monday, July 06, 2015, 09:29 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced out gassing gauge on the backing line | |
|
456
|
Monday, July 06, 2015, 14:26 |
Anders Mjos | | | | | | | | Pumping down empty chamber | Monday, July 06, 2015, 14:26: Roughing
Wednesday, July 08, 2015,
09:26: Venting |
|
457
|
Monday, July 13, 2015, 17:19 |
Anders Mjos | | LP-SIS | | | | | In progress | SIS Cup insulator clamping test | Monday, July 13, 2015, 17:09: Roughing
Monday, July 13, 2015, 17:51: Turbos
started |
|
458
|
Tuesday, August 04, 2015, 13:37 |
Anders Mjos | | | | | | | Problems/Solutions | Equipment for outgassing measurements removed | |
|
459
|
Monday, August 10, 2015, 18:01 |
Anders Mjos | | LP-SIS | | | | | In progress | Testing new center block target | Installed thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint |
|
460
|
Saturday, August 29, 2015, 14:33 |
Anders Mjos | | | | | | | Problems/Solutions | Restarted IOC after power outage | Saturday, August 29, 2015, 15:50:
Turbos started |
|