Friday, May 03, 2013, 14:32, Anders Mjos, , , , , , , Problems/Solutions, Cathode PS cable reconnected 
|
Sebastian Raeder wrote: |
The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off
|
Friday, May 03, 2013
The anode cable has been reconnected to F/T J and the 100k resistor placed between L and J. Q is now grounded to L. See dwg ISK4523
Tuesday, May 07, 2013
The cathode cable has been reconnected to F/T B and the 100k resistor removed between L and J. See dwg ISK4563 Rev 3
|
Wednesday, May 08, 2013, 08:52, Anders Mjos, , , , , , , Problems/Solutions, TMS and TPS P/S problems
|
Wednesday, May 08, 2013, 08:52: TMS:CB5 found off this morning. Switched back on.
Wednesday, May 08, 2013, 12:14: Lost the following devices during a mass scan
TMS:VCB5
TMS:OCT3
TPS:Q4
TPS:Q2
TPS:Q1
TSG:CBC
All devices but TPS:Q1 could be completely restored.
Wednesday, May 08, 2013, 12:49: TPS:Q1 restored by lowering and increasing the voltage
|
Thursday, May 09, 2013, 15:28, Anders Mjos, , , , , , , Problems/Solutions, TSGRP1 showing signs of reduced performance
|
TSG:CG1A and TSG:CG1B shows an increase in vacuum.
See attached archived data for details. |
Tuesday, May 21, 2013, 10:09, Rick Maharaj, , , , , , , , Test stand Vented
|
Turbos stopped, waterlines flushed, chamber vented |
Tuesday, May 21, 2013, 14:58, Rick Maharaj, CTL Febiad, , , , , , , CTL Febiad Installed
|
Ceramic coated coil development target removed. CTL Febiad target installed.
Roughing chamber. |
Tuesday, May 21, 2013, 15:14, Rick Maharaj, CTL Febiad, , , , , , , Turbos Started
|
Turbos started |
Tuesday, May 21, 2013, 15:50, Rick Maharaj, CTL Febiad, , , , , , , Cooling Water Turned On
|
Cooling water turned on when vacuum reading 5.54e-06 T. Vacuum steadily increasing. Ion gauge reading steadily decreasing now reading 4.48e-06 T. |
Tuesday, May 21, 2013, 19:38, Friedhelm Ames, , , , , , , Problems/Solutions, magnet power supply water leak
|
The cyclotron operators discovered a water leak in the magnet power supply. The water is valved off and the power is off. A fault report has been issued to the power supplies group. |
Friday, May 24, 2013, 15:13, Aurelia Laxdal, CLT FEBIAD, , , , , , , CLT FEBIAD conditioning started
|
Purged the gas lines, turned on the HV and started the heaters for CLT FEBIAD: TGHT up to 580A and TBHT up to 230A. |
Tuesday, May 28, 2013, 09:51, Anders Mjos, , , , , , , Problems/Solutions, Archivers restarted
|
COIL and ANODE data added to ISACT Data Archiver |
Tuesday, May 28, 2013, 09:53, Anders Mjos, , , , , , , Problems/Solutions, TPS:Q4 and TPS:Q2 restarted
|
|
Wednesday, May 29, 2013, 12:10, Anders Mjos, CTL FEBIAD, HP-FEBIAD, , , 38481-5, , Done, CTL Test
|
Wednesday, May 29, 2013, 12:09: Debiased to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp logger installed
CH1 COIL
CH2 CTL Block
Wednesday, May 29, 2013, 14:51: Opening gas lines
Temperatures [deg C]
COIL: 190
CTL: 44
Wednesday, May 29, 2013, 15:31: Coil at 50A
Temperatures [deg C]
COIL: 212
CTL: 45
Thursday, May 30, 2013, 09:18: TGHT was voltage limited at about 570A. Increased voltage limit to 5.5V and raised current to 580A
Thursday, May 30, 2013, 09:20: Ramping TBHT to 280A
Thursday, May 30, 2013, 10:03
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, May 30, 2013, 10:07: Heard a noise from the vacuum chamber coinciding with a spike in vacuum on both gauges.
Monday, June 03, 2013, 08:54: Target debiased and gases off. Target cooling started in preparation for power outage tomorrow at 9am.
Wednesday, June 05, 2013, 09:57: Purging gas lines to vacuum chamber
Wednesday, June 05, 2013, 10:13: Target biased again. Started target heating.
Thursday, June 06, 2013, 13:23:
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, June 06, 2013, 16:45: TBHT increased ti 290A
Temperatures [deg C]
COIL: 230
CTL: 50
Friday, June 07, 2013, 08:40: Magnet found off. TPS:Q4 and TPS:Q2 found off.
Temperatures [deg C]
COIL: 227
CTL: 48
Friday, June 07, 2013, 14:21: Anode current limit increased to 500 mA. Adjusted magnet current. Increasing TBHT.
Friday, June 07, 2013, 16:24: TBHT at 296A
Temperatures [deg C]
COIL: 237
CTL: 50
Monday, June 10, 2013, 08:19
Temperatures [deg C]
COIL: 232
CTL: 49
Monday, June 10, 2013, 16:55: COIL at 60A
Temperatures [deg C]
COIL: 244
CTL: 49
Tuesday, June 11, 2013, 08:42: TBHT voltage limited this morning at 291A
Temperatures [deg C]
COIL: 242
CTL: 49
Tuesday, June 11, 2013, 11:02: COIL at 70A
Temperatures [deg C]
COIL: 256
CTL: 49
Tuesday, June 11, 2013, 15:49: COIL at 80A
Temperatures [deg C]
COIL: 272
CTL: 49
Wednesday, June 12, 2013, 08:19:
Short on TBHT - see attached photo.
T/C logger is is off.
Gas lines closed.
Cooling down target.
Target debiased.
Thursday, June 13, 2013, 08:37: Turbos stopped.
Thursday, June 13, 2013, 09:20: Water lines purged.
Thursday, June 13, 2013, 09:41: Venting
Thursday, June 13, 2013, 10:19: Target removed |
Monday, June 03, 2013, 15:00, Anders Mjos, , , , , , , Problems/Solutions, SOURCES ARCH Restarted
|
SOURCES ARCH was found not running |
Friday, June 07, 2013, 08:47, Anders Mjos, , , , , , , Problems/Solutions, TPS:Q2, TPSQ4 and TMS:MB1 found off
|
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1 |
Monday, June 10, 2013, 08:16, Anders Mjos, , , , , , , Problems/Solutions, TPS:Q2, TPSQ4 and TMS:MB1 found off
|
Anders Mjos wrote: |
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1
|
Monday, June 10, 2013, 08:16: Restarted Q2 and Q4 |
Monday, June 10, 2013, 16:46, Anders Mjos, , , , , , , Problems/Solutions, TPS:Q2, TPSQ4 and TMS:MB1 found off
|
Anders Mjos wrote: |
Anders Mjos wrote: |
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1
|
Monday, June 10, 2013, 08:16: Restarted Q2 and Q4
|
Monday, June 10, 2013, 16:44: Restarted Q2 and Q4. A dip in coil current and voltage was seen at the same time. |
Tuesday, June 11, 2013, 08:41, Anders Mjos, , , , , , , Problems/Solutions, TPS:Q2, TPSQ4 and TMS:MB1 found off
|
Anders Mjos wrote: |
Anders Mjos wrote: |
Anders Mjos wrote: |
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1
|
Monday, June 10, 2013, 08:16: Restarted Q2 and Q4
|
Monday, June 10, 2013, 16:44: Restarted Q2 and Q4. A dip in coil current and voltage was seen at the same time.
|
Tuesday, June 11, 2013, 08:41: Restarted Q1, Q2 and Q4
Tuesday, June 11, 2013, 10:36: Restarted Q2 and Q4. No sign of sparks
Tuesday, June 11, 2013, 11:06: Restarted Q1, Q2, Q4 and CBC. No sign of sparks
Tuesday, June 11, 2013, 11:52: Restarted Q1, Q2 and Q4
Tuesday, June 11, 2013, 14:40: Restarted Q1, Q2, Q4 and CBC. |
Wednesday, June 12, 2013, 20:38, Friedhelm Ames, , , , , , , Problems/Solutions, target heater power supply removed
|
The target heater power supply at the teststand has been removed to replace one in ITE. |
Thursday, June 13, 2013, 10:19, Anders Mjos, , , , , , , Done, Pumping down empty chamber
|
Thursday, June 13, 2013, 10:17: Roughing.
Thursday, June 13, 2013, 10:52: Turbos started
Thursday, June 13, 2013, 11:00 : Both turbos at speed.
Thursday, June 13, 2013, 11:02 : Vacuum at 7.5E-6 Torr
|
Thursday, June 13, 2013, 11:04, Anders Mjos, , , , , , , Problems/Solutions, Viton seals on vacuum chamber doors replaced
|
See PO# TR193650 |
|