Friday, January 22, 2016, 15:34, Anders Mjos, SiC, LP-SIS, , , 41077-3, , In progress, EE coating test
|
Friday, January 22, 2016, 15:30: Turbos started
Friday, January 22, 2016, 16:14: RGA ON
Monday, January 25, 2016, 10:30: Opened water. No response on vacuum.
BIAS / EZL / EE to 30 / 15 / 1.5 kV
Started auto-ramping to 300 / 200 A at 2 A/min.
Monday, January 25, 2016, 15:34: Aborted auto-ramping and stepped down to 180 A on TGHT / TBHT to conserve salts. Vacuum at 1.2 E-6 T
Tuesday, January 26, 2016, 08:30: Continue auto-ramping.
Tuesday, January 26, 2016, 09:15: Tuning by Alex
Wednesday, January 27, 2016, 08:24: Increased good/bad vacuum to 4/6 E-6T
Wednesday, January 27, 2016, 08:58: Continue ramping to TGHt 400 A
Thursday, January 28, 2016, 13:28: Continue ramping to TGHT / TBHT 420 / 220 A
Monday, February 01, 2016, 08:31: Ramp down started
Monday, February 01, 2016, 10:40: Isolation valve closed
Monday, February 01, 2016, 10:42: RGA off.
Tuesday, February 23, 2016, 09:07 Monday, February 01, 2016, 16:35: BIAS / EZL / EE off. Stopped turbos.
Tuesday, February 02, 2016, 09:28: Venting through turbo pump (air).
Wednesday, February 03, 2016, 08:35: Roughing
Wednesday, February 03, 2016, 09:06: Starting TP1B only.
Wednesday, February 03, 2016, 09:17: Force on TSG:IG1 for high vacuum test
Wednesday, February 03, 2016, 09:27 : EE current limiting around 1500 V with IG1 at 4E-5 T. EE can no longer hold more than some hundred volts before current limiting.
Wednesday, February 03, 2016, 10:01: Stopped turbo. Will vent and inspect insulator.
Wednesday, February 03, 2016, 10:06: Force removed from IG1.
Wednesday, February 03, 2016, 12:11: Venting
TEST 2
Cleaned PE and EE with acetone.
Friday, February 05, 2016, 15:05: Roughing
Friday, February 05, 2016, 15:48: Turbos started.
Friday, February 05, 2016, 15:56 : Turbos at speed. Vacuum at 3.7E-5 T
Tuesday, February 09, 2016, 08:55: Opened water to HS circuit. Vacuum stable at 6.2E-7 T. No response on RGA
Tuesday, February 09, 2016, 08:59: Started auto-ramping heaters.
Tuesday, February 09, 2016, 09:12: Opened IV4
Wednesday, February 10, 2016, 14:15: Increased voltage limit on TB HT
EE voltage limited over the weekend on Feb 14th. See attached.
Observed EE opening with telescope. Could not see any material buildup. Nice round shape visible.
Monday, February 15, 2016, 11:55: Starting ramp down of heaters.
Tuesday, February 16, 2016, 08:32: BIAS/EZL/EE off. Stopped turbos.
Tuesday, February 16, 2016, 08:37: RGA off.
Tuesday, February 23, 2016, 09:08: Venting |
Monday, January 18, 2016, 08:41, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today |
Monday, January 18, 2016, 15:38, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping. |
Tuesday, January 19, 2016, 18:34, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway. |
Wednesday, January 20, 2016, 14:26, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A. |
Wednesday, January 20, 2016, 19:11, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF. |
Thursday, January 21, 2016, 13:04, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK. |
Friday, January 22, 2016, 13:35, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK.
|
Temperature measurements ended on Thursday, January 21, followed by cool down over night. |
Friday, January 22, 2016, 11:07, Anders Mjos, , , , , , , In progress, Venting
|
Friday, January 22, 2016, 11:07: Stopped turbos |
Monday, January 11, 2016, 09:02, Anders Mjos, , , , , , , , Venting
|
Monday, January 11, 2016, 09:02: Turbos stopped.
Monday, January 11, 2016, 12:58: Venting
Roughed down yesterday due to change of plans.
Tuesday, January 12, 2016, 09:58: Turbos started.
Thursday, January 14, 2016, 11:44: Turbos stopped. |
Wednesday, January 06, 2016, 09:28, Anders Mjos, , , , , , , Problems/Solutions, Water leak fixed on flow sensor for HS circuit
|
The Swagelok fitting on the return side of the flow sensor for the HS circuit was tightened to stop the leak. See e-fault 8650 |
Friday, December 18, 2015, 11:44, Anders Mjos, , , , , , , Problems/Solutions, IG6 not reading correctly
|
The new controller (XGS-600) installed for IG6 use a different voltage to pressure conversion than the previous models. This causes a discrepancy between values in EPICS and the value displayed on the controller. An e-fault has been submitted.
Friday, December 18, 2015, 14:40: EPICS updated and restarted. |
Wednesday, December 02, 2015, 15:30, Anders Mjos, , LP-SIS, , , , , , New centre block test
|
New 2x 9-pin connector grounding tool with gripper installed.
Wednesday, December 02, 2015, 15:30: Roughing
Wednesday, December 02, 2015, 17:14: Starting turbos
Wednesday, December 02, 2015, 17:32: Turbos at speed.
Thursday, December 03, 2015, 14:51: Opened water supply for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA
Monday, December 07, 2015, 08:45: Auto-ramping TBHT to 100 A at 2A/min. RGA on. Vacuum at 1.7E-7 T
Monday, December 07, 2015, 09:55: IV4 opened.
Target at TGHT / TBHT 100 A / 200 A over night.
Tuesday, December 08, 2015, 08:48: Ramping TGHT to 200 A at 4 A/min
Friday, December 11, 2015, 09:24: Ramping down target
Friday, December 11, 2015, 15:5: IV closed.
Tuesday, December 22, 2015, 15:11: RGA off |
Wednesday, December 02, 2015, 14:50, Anders Mjos, , , , , , , Problems/Solutions, Nitrogen supply for venting temporarely from bottle
|
No supply of N through the piping due to work on the N tanks. Confirmed with Geoff Hodgson. ISIS supply is shut off. Using a bottle until the supply is returned.
Monday, January 11, 2016
Nitrogen supply from ISIS restored and reconnected. |
Tuesday, November 17, 2015, 11:27, Anders Mjos, , , , , , , Problems/Solutions, Ran RP2 with gas ballast for 15 min
|
To recover performance |
Monday, November 16, 2015, 14:52, Anders Mjos, , , , , , , In progress, Current measurement
|
Installed Cu-shunts on TGHT and TBHT terminals. HS water looped.
Monday, November 16, 2015, 14:43: Roughing
Monday, November 16, 2015, 15:21: Turbos started.
Monday, November 16, 2015, 15:30: turbos at speed. Vacuum at 1.7E-5 T
Tuesday, November 17, 2015, 11:27: finished high current test.
Wednesday, December 02, 2015, 09:47: Turbos stopped.
Wednesday, December 02, 2015, 13:49: Venting |
Friday, October 16, 2015, 12:26, Anders Mjos, Target tube only, , , , , 41120-4, In progress, Conditioning HS for UC#14
|
Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06: Started turbos.
Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T
IG1 filament beeing replaced.
Thursday, October 22, 2015, 13:56: Leak on water lines (pressurized all lines except HS line with helium)
Thursday, October 22, 2015, 13:57: Stopping turbos. RGA off.
Thursday, October 22, 2015, 15:02: Venting
Re-tightened all newly installed fittings.
Thursday, October 22, 2015, 15:41: Roughing
Thursday, October 22, 2015, 16:12: Turbos started.
Thursday, October 22, 2015, 16:22: Turbos at speed. Vacuum at 1.2 E-5 T. RGA on
Monday, October 26, 2015, 08:42: Stopped turbos. Water leak still present. RGA off.
Tuesday, October 27, 2015, 08:57: Venting
Tuesday, October 27, 2015, 14:25: roughing
Tuesday, October 27, 2015, 15:03: Turbos started.
Water can still be seen on the RGA when the TGHT cooling lines are pressurized.
Thursday, October 29, 2015, 14:00: Stopped turbos. RGA off.
Monday, November 02, 2015, 08:30: Venting |
Tuesday, November 03, 2015, 09:00, Anders Mjos, Target tube only, , , , , 41120-4, In progress, Conditioning HS for UC#14
|
Tuesday, November 03, 2015, 08:59: Starting TGHT ramping to 580 A at 1 A/min
Thursday, November 05, 2015, 16:39 : Ramping down
Monday, November 09, 2015, 08:13: Turbos stopped
Monday, November 16, 2015, 10:24: Venting |
Monday, November 02, 2015, 12:47, Anders Mjos, , , , , , , Problems/Solutions, Removed Swagelok T from rioght TGHT water lines
|
Mico replaced the T's with copper tube and leak checked.
Monday, November 02, 2015, 12:46: Roughing
Monday, November 02, 2015, 13:19: Starting turbos
Monday, November 02, 2015, 13:27: Turbos at speed. Vacuum at 2.6E-5 T. RGA on
Tuesday, November 03, 2015, 08:23: Pressurized TGHT line with 70 psi He. No response on vacuum or RGA.
Tuesday, November 03, 2015, 08:38: Opened water supply all lines. Vacuum stable at 6.8E-7 T. No response on RGA |
Wednesday, October 14, 2015, 16:13, Anders Mjos, , , , , , , Problems/Solutions, TMS:RP2 replaced
|
by vacuum group. The pump was making more noise than usual. |
Monday, October 19, 2015, 15:39, Anders Mjos, , , , , , , Problems/Solutions, Exhaust came off the new RP2
|
Anders Mjos wrote: |
by vacuum group. The pump was making more noise than usual.
|
It seems the exhaust line is blocked which caused pressure to build up and eventually forced the exhaust tube off RP2 as RP1 was roughing down the vacuum chamber.
Vacuum group has been notified and will ask plant group to investigate.
Plant group has removed the blockage. Exhaust lines are reconnected to the roughing pumps. |
Monday, October 19, 2015, 09:45, Anders Mjos, , , , , , , Problems/Solutions, IG1 filament dead
|
Will went chamber to replace the filament.
See e-fault 8501
Monday, October 19, 2015, 09:43: turbos stopped
Monday, October 19, 2015, 10:19: Venting
Monday, October 19, 2015, 15:36: Gauge replaced by Anthony.
Monday, October 19, 2015, 15:36: Roughing
Monday, October 19, 2015, 16:05: Turbos started
Monday, October 19, 2015, 16:13: Turbos at speed. Vacuum does not display correct value (1E-11 T)
Tuesday, October 20, 2015, 08:14: Switched on controller. Gauge seem to operate fine. |
Thursday, October 15, 2015, 11:19, Anders Mjos, , , , , , , Problems/Solutions, Right side TGHT connector block removed
|
The keensert has been worn out and will be replaced.
The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged). |
Wednesday, October 07, 2015, 11:16, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32
|
Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09 Turbos started
Wednesday, October 07, 2015, 12:18: Turbos at speed. Vacuum at 1.7E-5 T
Thursday, October 08, 2015, 08:55: Pumping down gas lines.
Thursday, October 08, 2015, 09:09: Opened gas line
Thursday, October 08, 2015, 09:24: Opened HS water line. Vacuum stable at 3.3E-7 T. No response on RGA
Thursday, October 08, 2015, 09:32: PS on. Starting autoramping to 580/300 A at 2/1 A/min good/bad vacuum at 1E-6 and $E-6
Thursday, October 08, 2015, 09:41: BIAS/EZL/EE to 30/15/1.5 kV
Thursday, October 08, 2015, 09:42: COIL to 50 A ANODE to 200 V
ANODE developed a short Thursday evening. Target was cooled down and will be inspected.
Friday, October 09, 2015, 12:36: Stopped turbos.
Friday, October 09, 2015, 13:26: Venting |
Tuesday, October 13, 2015, 07:47, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32
|
Target was pumped down on Friday.
Tuesday, October 13, 2015, 07:47: Opened water for HS. No response on RGA. Vacuum stable at 2.2E-7 T
Tuesday, October 13, 2015, 07:59: Gas lines open.
Tuesday, October 13, 2015, 08:00: IV4 opened
Tuesday, October 13, 2015, 08:04: BIAS/EZL/EE to 30 / 15 1.5 kV
Tuesday, October 13, 2015, 08:04: ANODE 200 V, COIL 50 A
Tuesday, October 13, 2015, 08:04: Ramping up heaters
Short on ANODE/CATHODE again. Ramping down.
Tuesday, October 13, 2015, 15:22: Turbos stopped.
Tuesday, October 13, 2015, 16:05: Venting |
Tuesday, October 13, 2015, 17:23, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32
|
Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07: Started turbos.
Tuesday, October 13, 2015, 18:15: Turbos at speed. Vacuum at 1.9E-5 T
Wednesday, October 14, 2015, 07:55: Vacuum at 4.0E-7 T. Pumping on gas lines.
Wednesday, October 14, 2015, 08:00: Opened HS water. No response on vacuum or RGA.
Wednesday, October 14, 2015, 08:03: Ramping heaters to 580 / 300 A
Wednesday, October 14, 2015, 08:10: Opening gas lines.
Wednesday, October 14, 2015, 08:14: IV4 opened.
Wednesday, October 14, 2015, 16:00: RP2 replaced. See separate e-log entry.
Wednesday, October 14, 2015, 16:32: TBHT 305 A
Wednesday, October 14, 2015, 17:02: Opened He. - 5.6
Wednesday, October 14, 2015, 19:15: Started cool down of target.
Wednesday, October 14, 2015, 19:16 : Closed gas valves.
Thursday, October 15, 2015, 06:22: Source off. Stopped turbos. RGA off.
Thursday, October 15, 2015, 07:46: Venting
The bolt on the right side TGHT leg was difficult to remove. Se separate e-log entry |
Tuesday, October 13, 2015, 16:04, Anders Mjos, , , , , , , Problems/Solutions, IV4 timed out
|
Contacted Graham W. (controls) to have a look. It turned out to be a limit switch problem. Removed and reinstalled limit switch solved the time out issue. |
Friday, October 02, 2015, 08:35, Anders Mjos, , , , , , , Problems/Solutions, Venting beam line for TP exchange
|
Friday, October 02, 2015, 08:35: Turbo stopped |
Wednesday, September 30, 2015, 16:28, Anders Mjos, Test Target wrapped with heat shields, LP-SIS, , , , , In progress, New centre block test
|
T1 |
Probe Inside Target Left |
T2 |
|
T3 |
Probe Inside Target Right (touching tube) |
T4 |
|
Wednesday, September 30, 2015, 16:28: Roughing
Wednesday, September 30, 2015, 17:01: Turbos started
Wednesday, September 30, 2015, 17:09 : Turbos at speed. Vacuum at 3.4E-5 T
Thursday, October 01, 2015, 08:51: Opened HS water. No response on RGA. Vacuum stable at 7.2E-7 T
Thursday, October 01, 2015, 08:53: Atutoramping started to 580 / 230 A
Thursday, October 01, 2015, 09:49: Changed polarity on T3
Tuesday, October 06, 2015, 08:03: Turbos stopped
Tuesday, October 06, 2015, 09:54: Venting
|
Friday, September 18, 2015, 11:35, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP6 nor working
|
found in fault state this morning. Edi consulted and fault report submitted. |
|