Entry  Friday, January 22, 2016, 15:34, Anders Mjos, SiC, LP-SIS, , , 41077-3, , In progress, EE coating test 2016-02-14_EE_V_limit.png
Friday, January 22, 2016, 15:30: Turbos started
Friday, January 22, 2016, 16:14: RGA ON

Monday, January 25, 2016, 10:30: Opened water. No response on vacuum.
Entry  Monday, January 18, 2016, 08:41, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 nor performing 
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
    Reply  Monday, January 18, 2016, 15:38, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing 2016-01-18_Pumping_on_Ta46Clone_(leak_at_Lid-Base_HS).png


    
        
            Anders Mjos wrote:
        
        
            
            The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will
       Reply  Tuesday, January 19, 2016, 18:34, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing 


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
          Reply  Wednesday, January 20, 2016, 14:26, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing 


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
             Reply  Wednesday, January 20, 2016, 19:11, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing 


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
                Reply  Thursday, January 21, 2016, 13:04, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing 


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
                   Reply  Friday, January 22, 2016, 13:35, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing 


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
Entry  Friday, January 22, 2016, 11:07, Anders Mjos, , , , , , , In progress, Venting 
 Friday, January 22, 2016, 11:07: Stopped turbos
Entry  Monday, January 11, 2016, 09:02, Anders Mjos, , , , , , , , Venting 
Monday, January 11, 2016, 09:02: Turbos stopped.
Monday, January 11, 2016, 12:58: Venting

Roughed down yesterday due to change of plans.
Entry  Wednesday, January 06, 2016, 09:28, Anders Mjos, , , , , , , Problems/Solutions, Water leak fixed on flow sensor for HS circuit 
 The Swagelok fitting on the return side of the flow sensor for the HS circuit was tightened to stop the leak. See e-fault 8650
Entry  Friday, December 18, 2015, 11:44, Anders Mjos, , , , , , , Problems/Solutions, IG6 not reading correctly 
The new controller (XGS-600) installed for IG6 use a different voltage to pressure conversion than the previous models. This causes a discrepancy between
values in EPICS and the value displayed on the controller. An e-fault has been submitted.
Friday, December 18, 2015, 14:40: EPICS updated and restarted.
Entry  Wednesday, December 02, 2015, 15:30, Anders Mjos, , LP-SIS, , , , , , New centre block test 
New 2x 9-pin connector grounding tool with gripper installed.
Wednesday, December 02, 2015, 15:30: Roughing
Wednesday, December 02, 2015, 17:14: Starting turbos
Entry  Wednesday, December 02, 2015, 14:50, Anders Mjos, , , , , , , Problems/Solutions, Nitrogen supply for venting temporarely from bottle 
No supply of N through the piping due to work on the N tanks. Confirmed with Geoff Hodgson. ISIS supply is shut off. Using a bottle until the supply
is returned.

Monday, January 11, 2016
Entry  Tuesday, November 17, 2015, 11:27, Anders Mjos, , , , , , , Problems/Solutions, Ran RP2 with gas ballast for 15 min 2015-11-17_RP2_performance.png
To recover performance
Entry  Monday, November 16, 2015, 14:52, Anders Mjos, , , , , , , In progress, Current measurement 2015-11-17_High_Current_Test.png2015-11-17_Current_vs_Voltage_TGHT_and_TBHT.xlsx
Installed Cu-shunts on TGHT and TBHT terminals. HS water looped.
 Monday, November 16, 2015, 14:43: Roughing
Monday, November 16, 2015, 15:21: Turbos started.
Entry  Friday, October 16, 2015, 12:26, Anders Mjos, Target tube only, , , , , 41120-4, In progress, Conditioning HS for UC#14 2015-10-22_TS_Leak.docx
Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06: Started turbos.
Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T
    Reply  Tuesday, November 03, 2015, 09:00, Anders Mjos, Target tube only, , , , , 41120-4, In progress, Conditioning HS for UC#14 
Tuesday, November 03, 2015, 08:59: Starting TGHT ramping to 580 A at 1 A/min

Thursday, November 05, 2015, 16:39 : Ramping down

Monday, November 09, 2015, 08:13: Turbos stopped
Entry  Monday, November 02, 2015, 12:47, Anders Mjos, , , , , , , Problems/Solutions, Removed Swagelok T from rioght TGHT water lines 
Mico replaced the T's with copper tube and leak checked.
Monday, November 02, 2015, 12:46: Roughing
Monday, November 02, 2015, 13:19: Starting turbos
Entry  Wednesday, October 14, 2015, 16:13, Anders Mjos, , , , , , , Problems/Solutions, TMS:RP2 replaced 
 by vacuum group. The pump was making more noise than usual.
    Reply  Monday, October 19, 2015, 15:39, Anders Mjos, , , , , , , Problems/Solutions, Exhaust came off the new RP2 


    
        
            Anders Mjos wrote:
        
        
            
             by vacuum group. The pump was making more noise than usual.
Entry  Monday, October 19, 2015, 09:45, Anders Mjos, , , , , , , Problems/Solutions, IG1 filament dead 
Will went chamber to replace the filament.
See e-fault 8501 
Monday, October 19, 2015, 09:43: turbos stopped
Entry  Thursday, October 15, 2015, 11:19, Anders Mjos, , , , , , , Problems/Solutions, Right side TGHT connector block removed Photo_2015-10-16_11_57_45_AM.jpgPhoto_2015-10-16_11_57_51_AM.jpg
The keensert has been worn out and will be replaced.
The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged).
Entry  Wednesday, October 07, 2015, 11:16, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32 SiC#32.docx
Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09 Turbos started
Wednesday, October 07, 2015, 12:18: Turbos at speed. Vacuum at 1.7E-5 T
    Reply  Tuesday, October 13, 2015, 07:47, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32 SiC#32-2.docx
Target was pumped down on Friday.

Tuesday, October 13, 2015, 07:47: Opened water for HS. No response on RGA. Vacuum stable at 2.2E-7 T
Tuesday, October 13, 2015, 07:59: Gas lines open.
       Reply  Tuesday, October 13, 2015, 17:23, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32 SiC#32-3.docxEmittance.zipNeEfficiecy.xlsx
Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07: Started turbos.
Tuesday, October 13, 2015, 18:15: Turbos at speed. Vacuum at 1.9E-5 T
Entry  Tuesday, October 13, 2015, 16:04, Anders Mjos, , , , , , , Problems/Solutions, IV4 timed out 
Contacted Graham W. (controls) to have a look. It turned out to be a limit switch problem. Removed and reinstalled limit switch solved the time out issue.
Entry  Friday, October 02, 2015, 08:35, Anders Mjos, , , , , , , Problems/Solutions, Venting beam line for TP exchange 
 Friday, October 02, 2015, 08:35: Turbo stopped
Entry  Wednesday, September 30, 2015, 16:28, Anders Mjos, Test Target wrapped with heat shields, LP-SIS, , , , , In progress, New centre block test 
 

    
        
            T1
            Probe Inside Target Left
        
        
            T2
             
Entry  Friday, September 18, 2015, 11:35, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP6 nor working 
found in fault state this morning. Edi consulted and fault report submitted.
ELOG V2.9.2-2455