Friday, March 11, 2016, 15:46, Anders Mjos, , , , , , , In progress, Testing end cap leak tightness
|
Two Ta-tubes sealed with 2 end caps each placed in the vacuum chamber.
Friday, March 11, 2016, 15:03: Rouging
Monday, March 14, 2016, 09:43: Caps still on the tube. Vacuum on CG1 5 mT |
Friday, March 04, 2016, 14:23, Anders Mjos, Target tube only, LP-SIS, ITW, TM2, 39459-2, 41120-10, In progress, Conditiong Heat Shield for UC#15
|
Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos started
Friday, March 04, 2016, 15:11: Turbos at speed. Vacuum at 3.5E-5 T. |
Wednesday, March 02, 2016, 12:08, Anders Mjos, , , , , , , Problems/Solutions, TGHT insulator broken
|
The insulator for the TGHT terminals cracked during an attempt to remove a seized bolt.The right TGHT block was removed with the target and the
bolt cut to remove the target. The single stand-off insulator on the target assembly cracked in the process.
Friday, March 04, 2016 |
Tuesday, February 23, 2016, 10:43, Anders Mjos, SiC, LP-SIS, , , 41077-3, , , EE coating test - no Plasma Electrode
|
Cleaned up EE and around target tube. Removed PE
Tuesday, February 23, 2016, 10:40: Roughing
Tuesday, February 23, 2016, 11:09: Starting turbos |
Friday, January 22, 2016, 15:34, Anders Mjos, SiC, LP-SIS, , , 41077-3, , In progress, EE coating test
|
Friday, January 22, 2016, 15:30: Turbos started
Friday, January 22, 2016, 16:14: RGA ON
Monday, January 25, 2016, 10:30: Opened water. No response on vacuum. |
Monday, January 18, 2016, 08:41, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today |
Monday, January 18, 2016, 15:38, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Anders Mjos wrote:
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will |
Tuesday, January 19, 2016, 18:34, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote:
|
Wednesday, January 20, 2016, 14:26, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote:
|
Wednesday, January 20, 2016, 19:11, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote:
|
Thursday, January 21, 2016, 13:04, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote:
|
Friday, January 22, 2016, 13:35, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote:
|
Friday, January 22, 2016, 11:07, Anders Mjos, , , , , , , In progress, Venting
|
Friday, January 22, 2016, 11:07: Stopped turbos |
Monday, January 11, 2016, 09:02, Anders Mjos, , , , , , , , Venting
|
Monday, January 11, 2016, 09:02: Turbos stopped.
Monday, January 11, 2016, 12:58: Venting
Roughed down yesterday due to change of plans. |
Wednesday, January 06, 2016, 09:28, Anders Mjos, , , , , , , Problems/Solutions, Water leak fixed on flow sensor for HS circuit
|
The Swagelok fitting on the return side of the flow sensor for the HS circuit was tightened to stop the leak. See e-fault 8650 |
Friday, December 18, 2015, 11:44, Anders Mjos, , , , , , , Problems/Solutions, IG6 not reading correctly
|
The new controller (XGS-600) installed for IG6 use a different voltage to pressure conversion than the previous models. This causes a discrepancy between
values in EPICS and the value displayed on the controller. An e-fault has been submitted.
Friday, December 18, 2015, 14:40: EPICS updated and restarted. |
Wednesday, December 02, 2015, 15:30, Anders Mjos, , LP-SIS, , , , , , New centre block test
|
New 2x 9-pin connector grounding tool with gripper installed.
Wednesday, December 02, 2015, 15:30: Roughing
Wednesday, December 02, 2015, 17:14: Starting turbos |
Wednesday, December 02, 2015, 14:50, Anders Mjos, , , , , , , Problems/Solutions, Nitrogen supply for venting temporarely from bottle
|
No supply of N through the piping due to work on the N tanks. Confirmed with Geoff Hodgson. ISIS supply is shut off. Using a bottle until the supply
is returned.
Monday, January 11, 2016 |
Tuesday, November 17, 2015, 11:27, Anders Mjos, , , , , , , Problems/Solutions, Ran RP2 with gas ballast for 15 min
|
To recover performance |
Monday, November 16, 2015, 14:52, Anders Mjos, , , , , , , In progress, Current measurement 
|
Installed Cu-shunts on TGHT and TBHT terminals. HS water looped.
Monday, November 16, 2015, 14:43: Roughing
Monday, November 16, 2015, 15:21: Turbos started. |
Friday, October 16, 2015, 12:26, Anders Mjos, Target tube only, , , , , 41120-4, In progress, Conditioning HS for UC#14
|
Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06: Started turbos.
Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T |
Tuesday, November 03, 2015, 09:00, Anders Mjos, Target tube only, , , , , 41120-4, In progress, Conditioning HS for UC#14
|
Tuesday, November 03, 2015, 08:59: Starting TGHT ramping to 580 A at 1 A/min
Thursday, November 05, 2015, 16:39 : Ramping down
Monday, November 09, 2015, 08:13: Turbos stopped |
Monday, November 02, 2015, 12:47, Anders Mjos, , , , , , , Problems/Solutions, Removed Swagelok T from rioght TGHT water lines
|
Mico replaced the T's with copper tube and leak checked.
Monday, November 02, 2015, 12:46: Roughing
Monday, November 02, 2015, 13:19: Starting turbos |
Wednesday, October 14, 2015, 16:13, Anders Mjos, , , , , , , Problems/Solutions, TMS:RP2 replaced
|
by vacuum group. The pump was making more noise than usual. |
Monday, October 19, 2015, 15:39, Anders Mjos, , , , , , , Problems/Solutions, Exhaust came off the new RP2
|
Anders Mjos wrote:
by vacuum group. The pump was making more noise than usual. |
Monday, October 19, 2015, 09:45, Anders Mjos, , , , , , , Problems/Solutions, IG1 filament dead
|
Will went chamber to replace the filament.
See e-fault 8501
Monday, October 19, 2015, 09:43: turbos stopped |
Thursday, October 15, 2015, 11:19, Anders Mjos, , , , , , , Problems/Solutions, Right side TGHT connector block removed 
|
The keensert has been worn out and will be replaced.
The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged). |
Wednesday, October 07, 2015, 11:16, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32
|
Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09 Turbos started
Wednesday, October 07, 2015, 12:18: Turbos at speed. Vacuum at 1.7E-5 T |
Tuesday, October 13, 2015, 07:47, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32
|
Target was pumped down on Friday.
Tuesday, October 13, 2015, 07:47: Opened water for HS. No response on RGA. Vacuum stable at 2.2E-7 T
Tuesday, October 13, 2015, 07:59: Gas lines open. |
Tuesday, October 13, 2015, 17:23, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32  
|
Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07: Started turbos.
Tuesday, October 13, 2015, 18:15: Turbos at speed. Vacuum at 1.9E-5 T |
|