Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 27 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  289   Thursday, March 28, 2013, 13:55 Anders MjosEmpty     In progressPumping down empty chamberThursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36:
Starting turbos (vacuum at ~0.100 T)
  
  290   Tuesday, April 02, 2013, 15:19 Anders Mjos      Problems/SolutionsWater leak at MB1 Power SupplySee
Cyclotron e-fault 6637
 
  
  291   Tuesday, April 09, 2013, 16:21 Anders Mjos      Problems/SolutionsWater leak at MB1 Power Supply 

    
  
  293   Thursday, April 11, 2013, 08:49 Anders Mjos      Problems/SolutionsMB1 Power Supply operational 

    
  
  294   Tuesday, April 16, 2013, 08:59 Anders Mjos      Problems/SolutionsTMS:TP2 found in timeout / fault stateTuesday, April 16, 2013, 08:59
The turbo was found in fault state
this morning. Based on data from IG6 the
 TMS-TP2_Fault.pngTMS-IG6-RDVAC.png 
  297   Friday, May 03, 2013, 14:32 Anders Mjos      Problems/SolutionsCathode PS cable reconnected 

 ISK4523D-rev4.pdfISK4563D-rev3.pdf 
  298   Wednesday, May 08, 2013, 08:52 Anders Mjos      Problems/SolutionsTMS and TPS P/S problemsWednesday, May 08, 2013, 08:52: TMS:CB5
found off this morning. Switched back on.
Wednesday, May 08, 2013, 12:14: Lost
  
  299   Thursday, May 09, 2013, 15:28 Anders Mjos      Problems/SolutionsTSGRP1 showing signs of reduced performanceTSG:CG1A and TSG:CG1B shows an increase
in vacuum.
See attached archived data for details.
 Archiver.PNG 
  300   Tuesday, May 21, 2013, 10:09 Rick Maharaj       Test stand VentedTurbos stopped, waterlines flushed, chamber
vented
  
  301   Tuesday, May 21, 2013, 14:58 Rick MaharajCTL Febiad      CTL Febiad InstalledCeramic coated coil development target
removed. CTL Febiad target installed.
Roughing chamber.
  
  302   Tuesday, May 21, 2013, 15:14 Rick MaharajCTL Febiad      Turbos StartedTurbos started   
  303   Tuesday, May 21, 2013, 15:50 Rick MaharajCTL Febiad      Cooling Water Turned OnCooling water turned on when vacuum reading
5.54e-06 T. Vacuum steadily increasing. Ion
gauge reading steadily decreasing now reading
  
  304   Tuesday, May 21, 2013, 19:38 Friedhelm Ames      Problems/Solutionsmagnet power supply water leakThe cyclotron operators discovered a water
leak in the magnet power supply. The water
is valved off and the power is off. A fault
  
  305   Friday, May 24, 2013, 15:13 Aurelia LaxdalCLT FEBIAD      CLT FEBIAD conditioning startedPurged the gas lines, turned on the HV
and started the heaters for CLT FEBIAD: TGHT
up to 580A and TBHT up to 230A.
  
  306   Tuesday, May 28, 2013, 09:51 Anders Mjos      Problems/SolutionsArchivers restartedCOIL and ANODE data added to ISACT Data
Archiver
  
  307   Tuesday, May 28, 2013, 09:53 Anders Mjos      Problems/SolutionsTPS:Q4 and TPS:Q2 restarted    
  309   Monday, June 03, 2013, 15:00 Anders Mjos      Problems/SolutionsSOURCES ARCH RestartedSOURCES ARCH was found not running   
  310   Friday, June 07, 2013, 08:47 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found offFriday, June 07, 2013, 08:42: Restarted
Q2, Q4 and MB1
  
  311   Monday, June 10, 2013, 08:16 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off

    

       
            
  
  312   Monday, June 10, 2013, 16:46 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off 

    
 DipCOIL.png 
ELOG V2.9.2-2455