  ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  212   Monday, September 24, 2012, 15:25 Anders Mjos      DoneTMS RP and TP started    
  213   Tuesday, September 25, 2012, 13:05 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuse

    

       
            
  
  214   Tuesday, September 25, 2012, 13:25 Anders Mjos      DoneStarted turbos after replaced roughing pump    
  215   Tuesday, September 25, 2012, 16:10 Aurelia Laxdal       Conditioning - SiC-HP-FEBIAD for operator trainingDid the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A
  
  216   Thursday, September 27, 2012, 12:27 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator trainingThe source was used yesterday for operator
training.
Today, I found the source off: the
  
  217   Friday, September 28, 2012, 09:59 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training - Source OffChecked with ISAC Ops this morning and
they are not available for FEBIAD training.
Turned off the source until next week.
  
  220   Wednesday, October 10, 2012, 10:47 Friedhelm Ames      Failedfound teststand tripped offturbo pumps in source section and all ion
gauges off all optics and heaters tripped.
Reason unknown.
  
  221   Wednesday, October 10, 2012, 17:35 Aurelia Laxdal      Failedfound teststand tripped off

    

       
            
  
  235   Thursday, November 29, 2012, 14:15 Anders Mjos      In progressVenting in preparation for RFQ work Thursday, November 29, 2012, 14:15:
Stopping turbos
Thursday, November 29, 2012, 15:57:
  
  236   Thursday, November 29, 2012, 16:21 Anders Mjos       Pumping downThursday, November 29, 2012, 16:21: Roughing   
  237   Friday, November 30, 2012, 10:42 Anders Mjos       Venting    
  238   Friday, November 30, 2012, 12:04 Anders Mjos      In progress9-pin connector installation work in progressin preparation for RFQ testing. By Sebastian
and Anders
An insulated  9-pin D-sub connector
  
  239   Monday, December 03, 2012, 15:33 Anders Mjos      In progressLeak check of 9-pin feed throughBase leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin
feed through.
  
  240   Tuesday, December 04, 2012, 11:05 Anders Mjos       VentedIn preparation for RFQ target and leak
troubleshooting.
Tuesday, December 04, 2012, 11:04:
  
  241   Tuesday, December 04, 2012, 17:27 Anders MjosRFQ empty     In progressPumping downThe RFQ heating test target was installed
by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26:
  
  242   Wednesday, December 05, 2012, 11:18 Anders Mjos      In progressLeak checking 9-pin feed throughVacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background.
  
  243   Thursday, December 06, 2012, 08:41 Anders Mjos       Opened cooling waterVacuum stable at 2.8E-7 T   
  244   Tuesday, December 11, 2012, 13:27 Sebastian Raeder       9 PIN connectorA Sub D 9 Pin connector on a HV insulator
was installed on Port Q of the target box
at the teststand. The insulator is leak tested
  
  245   Tuesday, December 11, 2012, 13:40 Sebastian RaederRFQ empty     DoneHeating test for Ion guide Laser ion sourcenew ion guide laser ion source installed.
Pure target container without targetmaterial
and without surface ion source.
 heatint_rfq_dec11_2012.PNGheatint_rfq_dec12_2012.PNG 
  246   Thursday, December 13, 2012, 08:40 Anders MjosRFQ empty     In progressVentingThursday, December 13, 2012, 08:38: TBHT
and TGHT off
Thursday, December 13, 2012, 08:38 :
  