Entry  Monday, September 24, 2012, 15:25, Anders Mjos, , , , , , , Done, TMS RP and TP started 
 
    Reply  Tuesday, September 25, 2012, 13:05, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse 


    
        
            Anders Mjos wrote:
        
        
            
            See e-fault 6329
Entry  Tuesday, September 25, 2012, 13:25, Anders Mjos, , , , , , , Done, Started turbos after replaced roughing pump 
 
Entry  Tuesday, September 25, 2012, 16:10, Aurelia Laxdal, , , , , , , , Conditioning - SiC-HP-FEBIAD for operator training 
Did the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A
Entry  Thursday, September 27, 2012, 12:27, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training 
The source was used yesterday for operator training.
Today, I found the source off: the ISAC PLC Status was stopped. Kazuya re-started the PLC. I will re-start the source.
Entry  Friday, September 28, 2012, 09:59, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training - Source Off 
Checked with ISAC Ops this morning and they are not available for FEBIAD training. Turned off the source until next week.
Entry  Wednesday, October 10, 2012, 10:47, Friedhelm Ames, , , , , , , Failed, found teststand tripped off 
turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.
    Reply  Wednesday, October 10, 2012, 17:35, Aurelia Laxdal, , , , , , , Failed, found teststand tripped off 


    
        
            Friedhelm Ames wrote:
        
        
            
            turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.
Entry  Thursday, November 29, 2012, 14:15, Anders Mjos, , , , , , , In progress, Venting in preparation for RFQ work 
 Thursday, November 29, 2012, 14:15: Stopping turbos
Thursday, November 29, 2012, 15:57: Venting
Entry  Thursday, November 29, 2012, 16:21, Anders Mjos, , , , , , , , Pumping down 
Thursday, November 29, 2012, 16:21: Roughing
Entry  Friday, November 30, 2012, 10:42, Anders Mjos, , , , , , , , Venting 
 
Entry  Friday, November 30, 2012, 12:04, Anders Mjos, , , , , , , In progress, 9-pin connector installation work in progress 
in preparation for RFQ testing. By Sebastian and Anders
An insulated  9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target
assembly was placed in the upper slot on the source tray.
Entry  Monday, December 03, 2012, 15:33, Anders Mjos, , , , , , , In progress, Leak check of 9-pin feed through 
Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin feed through.
Entry  Tuesday, December 04, 2012, 11:05, Anders Mjos, , , , , , , , Vented 
In preparation for RFQ target and leak troubleshooting.
Tuesday, December 04, 2012, 11:04: Turbos off (vacuum at 3.8E-7 T)
Water lines purged.
Entry  Tuesday, December 04, 2012, 17:27, Anders Mjos, RFQ empty, , , , , , In progress, Pumping down 
The RFQ heating test target was installed by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26: roughing
Tuesday, December 04, 2012, 17:45: starting turbos
Entry  Wednesday, December 05, 2012, 11:18, Anders Mjos, , , , , , , In progress, Leak checking 9-pin feed through 
Vacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background.
Entry  Thursday, December 06, 2012, 08:41, Anders Mjos, , , , , , , , Opened cooling water 
Vacuum stable at 2.8E-7 T
Entry  Tuesday, December 11, 2012, 13:27, Sebastian Raeder, , , , , , , , 9 PIN connector 
A Sub D 9 Pin connector on a HV insulator was installed on Port Q of the target box at the teststand. The insulator is leak tested and OK, vacuum is
below 2E-7 T
The feed through is connected (1to1) to the upper 9 Pin connector of the target tray. Since the existing upper 9 Pin connector was damaged from
Entry  Tuesday, December 11, 2012, 13:40, Sebastian Raeder, RFQ empty, , , , , , Done, Heating test for Ion guide Laser ion source heatint_rfq_dec11_2012.PNGheatint_rfq_dec12_2012.PNG
new ion guide laser ion source installed. Pure target container without targetmaterial and without surface ion source.
Heat up to 580A for heat test of all components. Distance between target and repeller < 1mm
 
Entry  Thursday, December 13, 2012, 08:40, Anders Mjos, RFQ empty, , , , , , In progress, Venting 
Thursday, December 13, 2012, 08:38: TBHT and TGHT off
Thursday, December 13, 2012, 08:38 : Vacuum at 1.8E-7 T
Thursday, December 13, 2012, 08:38 : Turbos off