  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  239   Monday, December 03, 2012, 15:33 Anders Mjos      In progressLeak check of 9-pin feed throughBase leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin
feed through.
  
  240   Tuesday, December 04, 2012, 11:05 Anders Mjos       VentedIn preparation for RFQ target and leak
troubleshooting.
Tuesday, December 04, 2012, 11:04:
  
  241   Tuesday, December 04, 2012, 17:27 Anders MjosRFQ empty     In progressPumping downThe RFQ heating test target was installed
by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26:
  
  242   Wednesday, December 05, 2012, 11:18 Anders Mjos      In progressLeak checking 9-pin feed throughVacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background.
  
  243   Thursday, December 06, 2012, 08:41 Anders Mjos       Opened cooling waterVacuum stable at 2.8E-7 T   
  244   Tuesday, December 11, 2012, 13:27 Sebastian Raeder       9 PIN connectorA Sub D 9 Pin connector on a HV insulator
was installed on Port Q of the target box
at the teststand. The insulator is leak tested
  
  245   Tuesday, December 11, 2012, 13:40 Sebastian RaederRFQ empty     DoneHeating test for Ion guide Laser ion sourcenew ion guide laser ion source installed.
Pure target container without targetmaterial
and without surface ion source.
 heatint_rfq_dec11_2012.PNGheatint_rfq_dec12_2012.PNG 
  246   Thursday, December 13, 2012, 08:40 Anders MjosRFQ empty     In progressVentingThursday, December 13, 2012, 08:38: TBHT
and TGHT off
Thursday, December 13, 2012, 08:38 :
  
  247   Thursday, December 13, 2012, 14:38 Anders Mjos       Pumping down empty chamberThursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56
: Starting turbos
  
  248   Friday, December 14, 2012, 14:24 Sebastian RaederRFQ empty      VentingFriday, December 14, 2012, 14:24 Stop Turbopumps
and prepare venting to insert RFQ target
  
  249   Friday, December 14, 2012, 15:28 Anders MjosRFQ empty     In progressVenting

    

       
            
  
  250   Friday, December 14, 2012, 20:34 Sebastian RaederRFQ empty     Donepumping downFriday, December 14, 2012, ~ 17:00: start
roughing pumps
Friday, December 14, 2012, 20:33:
  
  251   Monday, December 17, 2012, 22:35 Sebastian RaederRFQ empty      wire connection for RFQ testOverview over the connections of the new
9Pin connector inside the vacuum and in the
HV cage
  
  252   Tuesday, December 18, 2012, 12:51 Sebastian Raeder       Anode powersupply connected to HV-commonThe anode PS is turned off and connected
to HV common.
the Target is connected to a -18V
  
  253   Tuesday, December 18, 2012, 16:00 Sebastian RaederRFQ empty     Donetarget heatingTuesday, December 18, 2012, ~ 13:00 start
ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56:
 heatint_rfq_dec18_2012.PNGheatint_rfq_dec18_2012_detail.PNG 
  254   Wednesday, December 19, 2012, 09:44 Sebastian Raeder      In progressventingventing and inspect the target
Wednesday, December 19, 2012, 09:43:
vqacuum at 1.9E-7T, stop turbos
  
  255   Wednesday, December 19, 2012, 11:24 Anders Mjos      Problems/SolutionsRestarted turbos in TMS section after power bumpSources arch restared   
  256   Wednesday, December 19, 2012, 16:22 Sebastian Raeder      Problems/Solutionsstatus after power outageWednesday, December 19, 2012, 16:24:
After long power outage, everything
is off except the roughing pumps. Two turbo
  
  257   Thursday, December 20, 2012, 14:19 Anders Mjos       Power down for holidays    
  258   Thursday, January 03, 2013, 08:33 Anders Mjos      Problems/SolutionsStarted archivers after holiday shut downStarted archivers. Controls whited out.   