167
|
Monday, August 13, 2012, 10:59 |
Pierre Bricault | | | | | | | Problems/Solutions | Test FEBIAD |
This morning I try to contact PS group no one answer. Dan Louie is in vacation.
I went into the can diagnostics panel and reconfigure MB1 power supply.
This worked.
|
168
|
Monday, August 13, 2012, 14:26 |
Pierre Bricault | | | | | | | In progress | FEBIAD test |
I am done with the FEBIAD test (anode biased)
We will swap the bias now to the cathode and change the polarity to negative. |
169
|
Monday, August 13, 2012, 14:56 |
Pierre Bricault | | | | | | | In progress | FEBIAD test |
One thing that seems to be strange regarding this FEBIAD is the best results are without any current in the coil.
Normally for the neon ionization the on-line source wanted to be at around 50 to 80 Amp. Not this one.
Is there anything special about this coil?
|
170
|
Thursday, August 16, 2012, 10:41 |
Pierre Bricault | | | | | | | In progress | Test FEBIAD |
Ray is finishing the electrical modifications for the FEBIAD with the biased cathode.
We found the source of the sparks. The disconnected target heater cables were resting on the Einzel lens cap.
|
171
|
Thursday, August 16, 2012, 15:30 |
Anders Mjos | | | | | | | Problems/Solutions | Venting to investigate short between anode - cathode |
Thursday, August 16, 2012, 15:29: Turbos off
Thursday, August 16, 2012, 15:50 : Venting |
172
|
Thursday, August 16, 2012, 16:54 |
Anders Mjos | | | | | | | Problems/Solutions | Short between gas line and heat shield |
There was a short between the gas line and the heat shield - as the gas line insulator was not tied to the heat shield. A Ta-wire was used to tie the gas line and keep it from touching the heat shield. |
173
|
Thursday, August 16, 2012, 16:56 |
Anders Mjos | | | | | | | Problems/Solutions | Target heater PS disconnected from controls. |
As per Ray Dube for the FEBIAD anode bias test. The PS will need to be reconnected before a target is run. |
174
|
Thursday, August 16, 2012, 16:56 |
Anders Mjos | | | | | | | In progress | Pumping down after troubleshooting |
Thursday, August 16, 2012, 17:04 : Starting turbos
Thursday, August 16, 2012, 17:09 : TP1B at speed
Thursday, August 16, 2012, 17:13 : TP1A at speed (after 1 time out)
Thursday, August 16, 2012, 17:14 : Vacuum at 1.8E-5 |
175
|
Friday, August 17, 2012, 08:30 |
Pierre Bricault | | | | | | | In progress | FEBIAD test with cathode biased |
Yesterday Ray Dube has changed the configuration in order to run the FEBIAD with the cathode on negative bias.
There were a short between the gas line and the common. The box has been opened and the short removed.
This morning I am turning on the cathode heater to 290 A. |
176
|
Friday, August 17, 2012, 10:09 |
Pierre Bricault | | | | | | | In progress | FEBIAD test cathode bias |
Backing pressure on the bender section is quite large. TMSIG6 reads 5.09E-7 T and TMS:CG2B reads 0.249 T! |
177
|
Friday, August 17, 2012, 12:53 |
Pierre Bricault | | | | | | | Done | |
Test completed.
exel file on My Documents in folder FEBIAD Test Aout2012/TestFEBIAD
Edited by Anders 2012-09-19, file attached. |
178
|
Thursday, August 23, 2012, 10:11 |
Anders Mjos | | | | | | | In progress | Venting - installation of NiO#1 |
Thursday, August 23, 2012, 10:10: Vacuum 2.1E-7
Thursday, August 23, 2012, 10:10: Stopped both turbos.
Thursday, August 23, 2012, 10:20: Water purged.
Thursday, August 23, 2012, 10:53: Venting |
179
|
Thursday, August 23, 2012, 10:40 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced TMSRP2 |
Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49: TMSRP2 replaced and started. |
181
|
Thursday, August 23, 2012, 11:59 |
Anders Mjos | | | | | | | Problems/Solutions | Roughing blows the fuse for both roughing pumps. |
The fuse for both roughing pumps blows when roughing the chamber. With the help from Edi: disconnect the exhaust port on the roughing pump for the first few hundred torrs of roughing. Reconnect and continue.
Seems the roughing pump RP1 pushes air towards the exhaust of RP2 which blows the fuse |
184
|
Monday, August 27, 2012, 15:21 |
Aurelia Laxdal | | | | | | | In progress | Xantrex PS 10-600 for TSH:TGHT is not working |
When turned ON it was not going higher than 3.6A (EPICS/front panel). Kazuya checked the connections at the back and also the EPICS/PLC/PS input/output signals. He compared these values with the similar once of the TSH:TBHT PS (which is also a Xantrex PS 10-600). E-Fault 6275
It turned out to be the connections on the top of the ion source box: the target heater was not connected and the power supply was not seeing the load. Tomorrow we'll check all the top connections, with the corresponding power supplies. |
185
|
Tuesday, August 28, 2012, 16:57 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | Updates for NiO#1 at Test Stand |
Tested the power supplies and locked up the HV cage.
Turned on the HV: 30kV.
Tomorrow we'll start up the heaters: 580A for the target and 280-300A for the tube. |
186
|
Wednesday, August 29, 2012, 11:34 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 heating startup & few checks |
Friedhelm checked the voltage across R4 from ISK4563D-rev2.pdf. It shows 50 kOhms with the power supplies off and everything connected according to the drawing. With the Anode PS On and set at 20V, we could see the same readback on EPICS and on the meter.
Then started the heater ramping: auto ramp 2A/min.
We'd be watching the vacuum carefully during this process. Also the setup is such that:
- the target and tube heaters are only incremented if the vacuum is less than 5e-6Torr
- and if the vacuum exceeds 2e-5Torr the last increment of the target and tube heater is backed off.
Pierre asked for the 2e-5Torr limit to be changed to 8e-6Torr.
Anders asked to stop the heating at 500A to take a temperature measurement.
Raising the target heater from 500A to 580A.
Did a mass scan at TGHT=580A & TBHT=280A: Plotdump-local-clean.txt Aug29 12 19-53-16.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html |
187
|
Thursday, August 30, 2012, 14:34 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 updates |
Did another mass scan at 280A for the ionizer:
Plotdump-local-clean.txt Aug30 12 14-28-14.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html
Ramping up the TBHT from 280A -> 290A
And from 290A -> 300A:
Plotdump-local-clean.txt Aug30 12 16-40-29.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html |
188
|
Thursday, August 30, 2012, 16:51 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 cooldown started |
Started the cooldown. |
189
|
Friday, August 31, 2012, 10:19 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced TMSRP2 (again) |
Anders Mjos wrote: |
Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49: TMSRP2 replaced and started.
|
Edi will replace TMSRP2 again as it became noisy since yesterday morning. Vacuum should not be affected by the work. |