ID Date Author Target/No.# Source Stationdown Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  260   Friday, January 04, 2013, 10:52 Anders Mjos      In progressPreparing for venting Friday, January 04, 2013, 10:51:
Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52:
  
  261   Friday, January 04, 2013, 15:07 Anders MjosRFQ empty     In progressPumping downFriday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24:
Starting turbos
  
  262   Monday, January 07, 2013, 14:52 Sebastian RaederRFQ empty      heating targetheating target for RFQ tests. Now the wiring
is insulated with alumina beats and tubing
and the target has the standard Ta alkali
 RFQ_with_signal_total.PNGRFQ_with_signal.PNG 
  263   Wednesday, January 09, 2013, 10:39 Anders MjosRFQ empty     In progressVenting Wednesday, January 09, 2013, 10:38:
Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24
  
  264   Wednesday, January 09, 2013, 14:13 Anders MjosEmpty      RougingWednesday, January 09, 2013, 14:12: Roughing
empty chamber
  
  265   Friday, January 11, 2013, 08:37 Anders MjosEmpty     In progressVentingFriday, January 11, 2013, 08:36: Venting
for installation of RFQ test target later
today
  
  266   Friday, January 11, 2013, 11:02 Anders MjosRFQ empty      Target installed, pumping downTarget installed with 120 in lbs torque
on target legs and on central support.
Friday, January 11, 2013, 11:01:
  
  267   Monday, January 14, 2013, 13:51 Sebastian RaederRFQ empty     In progressheatingStarted heating the target, now Silica
sleevings are installed for wire insulation
and the gap target -- repeller is now 0.6mm
  
  268   Monday, January 14, 2013, 18:18 Friedhelm Ames       TMS:CBC1 not workingThe optics at the teststand has been switched
on, but TMS:CBC1 is not working. A fault
report has been send to controls.
  
  269   Tuesday, January 15, 2013, 15:12 Sebastian RaederRFQ empty      Start coolingStart cooling of Target RFQ empty   
  270   Tuesday, January 15, 2013, 16:10 Anders MjosRFQ empty      Turbos off

    

       
            
  
  271   Wednesday, January 16, 2013, 01:06 Sebastian RaederRFQ empty      Target installed - pumping downRFQ empty target installed
Wednesday, January 16, 2013, 01:05:
roughing started
  
  272   Thursday, January 17, 2013, 08:16 Sebastian RaederRFQ empty     In progressheatingThursday, January 17, 2013, 08:16: started
heating of the target, vacuum at 2.6E-7T
 Thursday, January 17, 2013,
  
  273   Friday, January 18, 2013, 11:28 Sebastian RaederRFQ empty      stop turbosFriday, January 18, 2013, 11:28: turbos
stopped
  
  274   Friday, January 18, 2013, 15:34 Anders Mjosempty      Pumping down empty chamberStarted roughing
Friday, January 18, 2013, 15:25:
Started turbos
  
  275   Friday, January 18, 2013, 15:57 Anders Mjos      Problems/SolutionsConductor bolts to be replacedAfter the last test at the test stand,
one of the conductor bolts (ITD0058) is damaged.
To prevent damage to the thread inserts,
 Model.jpgdamaged_bolt.JPG 
  276   Friday, January 18, 2013, 16:17 Anders MjosRFQ empty     In progressheating 

    
 Test_Stand_cooling_temp_data_2013-01-16.pdfTest_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG 
  277   Monday, January 28, 2013, 12:56 Anders MjosEmpty      Venting For conductor bolt work
Monday, January 28, 2013, 12:56:
Turbos off
  
  278   Monday, January 28, 2013, 14:41 Anders MjosEmpty      Pumping downMonday, January 28, 2013, 14:41: Roughing
Monday, January 28, 2013, 15:35:
Starting turbos
  
  279   Tuesday, February 19, 2013, 08:28 Anders Mjos      Problems/SolutionsOpened all backing valves after scheduled site wide air outage    