Tuesday, December 11, 2012, 13:27, Sebastian Raeder, , , , , , , , 9 PIN connector
|
A Sub D 9 Pin connector on a HV insulator was installed on Port Q of the target box at the teststand. The insulator is leak tested and OK, vacuum is
below 2E-7 T
The feed through is connected (1to1) to the upper 9 Pin connector of the target tray. Since the existing upper 9 Pin connector was damaged from |
Tuesday, December 11, 2012, 13:40, Sebastian Raeder, RFQ empty, , , , , , Done, Heating test for Ion guide Laser ion source
|
new ion guide laser ion source installed. Pure target container without targetmaterial and without surface ion source.
Heat up to 580A for heat test of all components. Distance between target and repeller < 1mm
|
Friday, December 14, 2012, 14:24, Sebastian Raeder, RFQ empty, , , , , , , Venting
|
Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target |
Friday, December 14, 2012, 20:34, Sebastian Raeder, RFQ empty, , , , , , Done, pumping down
|
Friday, December 14, 2012, ~ 17:00: start roughing pumps
Friday, December 14, 2012, 20:33: start turbo pumps
Friday, December 14, 2012, 20:42 : turbos at speed |
Monday, December 17, 2012, 22:35, Sebastian Raeder, RFQ empty, , , , , , , wire connection for RFQ test
|
Overview over the connections of the new 9Pin connector inside the vacuum and in the HV cage
1&2 : RFQ rods in the vacuum, RFQ Driver in HV cage
4: Repeller electrode, grounded in HV cage |
Tuesday, December 18, 2012, 12:51, Sebastian Raeder, , , , , , , , Anode powersupply connected to HV-common
|
The anode PS is turned off and connected to HV common.
the Target is connected to a -18V PS at the center support (Feed through A) for a on/off test of ion suppression
NOTE: there is a shortcut target <--> HV gnd, most propably due to the thermocouple touching something after pumping. |
Tuesday, December 18, 2012, 16:00, Sebastian Raeder, RFQ empty, , , , , , Done, target heating
|
Tuesday, December 18, 2012, ~ 13:00 start ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56: @ 250A, target is glowing, center block is cooler (can be inspected with a new hole in the heatshield lid),
thermocouple is reading 224C, which is definitely colder than the temp from visual insepection, reading may be corrupted from contact to Heatschield |
Wednesday, December 19, 2012, 09:44, Sebastian Raeder, , , , , , , In progress, venting
|
venting and inspect the target
Wednesday, December 19, 2012, 09:43: vqacuum at 1.9E-7T, stop turbos |
Wednesday, December 19, 2012, 16:22, Sebastian Raeder, , , , , , , Problems/Solutions, status after power outage
|
Wednesday, December 19, 2012, 16:24:
After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only
TSGTP1B could be reset, while TMSTP2 is still showing this fault |
Monday, January 07, 2013, 14:52, Sebastian Raeder, RFQ empty, , , , , , , heating target
|
heating target for RFQ tests. Now the wiring is insulated with alumina beats and tubing and the target has the standard Ta alkali element mixture
Unfortunately I deleted some entries, so here a short summary in combination with a screenshot of the striptool |
Monday, January 14, 2013, 13:51, Sebastian Raeder, RFQ empty, , , , , , In progress, heating
|
Started heating the target, now Silica sleevings are installed for wire insulation and the gap target -- repeller is now 0.6mm (was 0.25mm) |
Tuesday, January 15, 2013, 15:12, Sebastian Raeder, RFQ empty, , , , , , , Start cooling
|
Start cooling of Target RFQ empty |
Wednesday, January 16, 2013, 01:06, Sebastian Raeder, RFQ empty, , , , , , , Target installed - pumping down
|
RFQ empty target installed
Wednesday, January 16, 2013, 01:05: roughing started
Wednesday, January 16, 2013, 01:34: turbos started |
Thursday, January 17, 2013, 08:16, Sebastian Raeder, RFQ empty, , , , , , In progress, heating
|
Thursday, January 17, 2013, 08:16: started heating of the target, vacuum at 2.6E-7T
Thursday, January 17, 2013, 14:55: current at 572A/6.95V (panel reading), vacuum at 6.7E-7T
Thursday, January 17, 2013, 18:40: measurements done, vacuum at 5.3E-7T, current 572V/6.94V, start cooling down |
Friday, January 18, 2013, 11:28, Sebastian Raeder, RFQ empty, , , , , , , stop turbos
|
Friday, January 18, 2013, 11:28: turbos stopped |
Tuesday, March 19, 2013, 17:25, Sebastian Raeder, , , , , , , Problems/Solutions, new turbo installed
|
Edi replaced the faulty turbo pump in the mass separator section.
Roughing and turbo started
vacuum @ 9E-7T after 2.5h |
Tuesday, March 19, 2013, 19:13, Sebastian Raeder, , , , , , , Problems/Solutions, 9 Pin connector rewired to match wiring in TM4
|
The 9 Pin connector was rewired in the ISAC teststand to match the wiring in TM4
The wiring from the connection board in the HV cage to the connector (view from the target unit onto module) is now the following
--------------------------- |
Thursday, March 21, 2013, 15:05, Sebastian Raeder, SiC#28, , ITE, TM4, , , Done, 2nd heating of SiC#28 LP-RFQ - short resolved
|
Anders Mjos wrote: |
Monday, March 25, 2013, 16:50, Sebastian Raeder, , , , , , , Problems/Solutions, RFQ powersupplies removed - Anode PS still connected to ground
|
The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections
of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
|
Tuesday, November 15, 2022, 15:32, Sam Gupta, , , , , , , , ATTS tantalum Bracket Heating test
|
Heated up sample 01 for the second time and measured the temperature with increasing current. Used pyrometre to measure temperature and calibrated it
with the emmissivity values from cassidy |
|